单选题The ()(包装货) is loaded and unloaded by cargo sling.Abagged cargoBpacked cargoCcased cargoDdeck cargo
单选题
The ()(包装货) is loaded and unloaded by cargo sling.
A
bagged cargo
B
packed cargo
C
cased cargo
D
deck cargo
参考解析
解析:
暂无解析
相关考题:
The adoption of containers facilitated()to a great extent. A、to load and unloadB、the loading and unloadingC、us to load and unloadD、to have loaded and unloaded
The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo
Deadfreight is the charge for the ______.A.carriage of demise cargoB.cost of transshipment of over-carried cargoC.difference in the amount of cargo loaded and the amount of cargo dischargedD.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.A.log bookB.short/over-loaded cargo listC.the mate’s receiptD.manifest
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
Cargo securing for Ro-Ro is based on the concept of _______.A.Solid packingB.Rapid loading and dischargeC.Vessel loaded full and down to her marksD.Palletized cargo
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo
单选题()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.AWedgeBDunnageCShoreDStore
单选题Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug.14th.and 16th. Under favorable weather without any remarks on().Alog bookBshort/over-loaded cargo listCthe mate's receiptDmanifest
单选题A ship is responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBafter the cargo is checked by tallymenCas soon as the cargo loading or unloading beginsDduring the time when loading or unloading is going on
单选题液体散货用泵装卸的。()ALiquid cargo is loaded and discharged by pumps.BLiquid cargo is loaded and discharged by tubes.CLiquid bulk cargo is loaded and discharged by tubes.DLiquid bulk cargo is loaded and discharged by pumps.
单选题The tentative cargo plan().Aeliminates confusion with the final stowage planBshows the approximate amount of cargo to be loaded in each holdCexpedites the total operationDrequires an unproportional number of gang hours of work to discharge the cargo
单选题The ship will be responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBduring the time when loading or ynloading is going onCafter the cargo is checked by tallymenDas soon as loading or discharging begins
单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling
单选题Cargo securing for Ro-Ro is based on the concept of().Asolid packingBrapid loading and dischargeCvessel loaded full and down to her marksDpalletized cargo
单选题The most important principle in the stowage is().Ato ensure the safety of the ship and protect the cargo from being damagedBto avoid the rearrangement of the cargo loaded on boardCto reject the damaged cargo during loadingDto prevent the spontaneous combustion of coal and grain
单选题The ()(桶装货) should be loaded by cargo net.Abagged cargoBdrummed cargoCcased cargoDdeck cargo
单选题The()(非包装货) is loaded and discharged by belt conveyer.Anon-packed cargoBpacked cargoCcased cargoDinboard cargo
单选题The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.Aunit methodBblock methodCstraight methodDpackage method
单选题The most important principle in the cargo stowage is().Ato avoid the rearrangement of the cargo loaded on boardBto ensure the safety of the ship and cargoCto reject the damaged cargo during loading operationDto prevent the spontaneous combustion of the coal and grain
单选题Deadfreight is the charge for the().Acarriage of demise cargoBcost of transshipment of over-carried cargoCdifference in the amount of cargo loaded and the amount of cargo dischargedDdifference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
单选题()cargo is unloaded by huge grabs on cranes or by large grain elevators.ADryBDry generalCDry bulkDLiquid