The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo
The()(非包装货) is loaded and discharged by belt conveyer.
- A、non-packed cargo
- B、packed cargo
- C、cased cargo
- D、inboard cargo
相关考题:
What’s wrong with the goods which David has bought() A. They are not up to the standard.B. They are not loaded on time.C. They are not properly loaded.
Which statement is true about the plan being loaded into the SQL baseline by the above command?() A. It is loaded with the FIXED status.B. It is loaded with the ACCEPTED status.C. It is not loaded with the ENABLED status.D.It is not loaded with the ACCEPTED status.
Which vessel is most likely to be loaded full but not down ________.A.A bulk carrier loaded with heavy oreB.A bulk carrier loaded with steelC.A break bulk vessel loaded with palletized cargoD.A tanker loaded with heavy grain
If the survival craft is not loaded to full capacity, the personnel should be ______.A.loaded more on the port side forwardB.loaded equally on both sides with more forwardC.loaded equally on both sides with more aftD.allowed to sit anywhere
小额支付系统仅允许对未纳入轧差的()撤销。A、非实时借记业务包、非实时贷记业务回执包B、非实时贷记业务包、非实时贷记业务回执包C、非实时借记业务包、非实时借记业务回执包D、非实时贷记业务包、非实时借记业务回执包
单选题According to the Code of Federal Regulations,on vessels other than river ferryboats and river vessels,how are periodic lifeboat weight tests required to be conducted?()AThe lifeboat is lowered to near the water,loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsBThe lifeboat is loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsCThe lifeboat is lowered into the water until afloat,loaded with the allowed capacity,then released from the fallsDThe lifeboat is lowered to near the water,loaded with the allowed capacity,then released from the falls
单选题Tell me(),please.Awhich hatch will be loaded firstBwill which hatch be loaded firstCwill hatch of which be loaded firstDfirst will which hatch be loaded
单选题集装箱是由龙门吊装卸。()AContainers are loaded and discharged by gantry cranes.BCases are loaded and discharged by gantry cranes.CCases are loaded and discharged by heavy derricks.DContainers are loaded and discharged by heavy derricks.
单选题液体散货用泵装卸的。()ALiquid cargo is loaded and discharged by pumps.BLiquid cargo is loaded and discharged by tubes.CLiquid bulk cargo is loaded and discharged by tubes.DLiquid bulk cargo is loaded and discharged by pumps.
单选题Examine the following PL/SQL block: DECLARE my_plans pls_integer; BEGIN my_plans := DBMS_SPM.LOAD_PLANS_FROM_CURSOR_CACHE (sql_id= ?9twu5t2dn5xd?; END; Which statement is true about the plan being loaded into the SQL plan baseline by the above command?()A It is loaded with the FIXED status.B It is loaded with the ACCEPTED status.C It is not loaded with the ENABLED status.D It is not loaded with the ACCEPTED status.
单选题The ()(桶装货) should be loaded by cargo net.Abagged cargoBdrummed cargoCcased cargoDdeck cargo
单选题The()(非包装货) is loaded and discharged by belt conveyer.Anon-packed cargoBpacked cargoCcased cargoDinboard cargo
单选题Which statement concerning the handling characteristics of a fully loaded vessel as compared with those of a light vessel is FALSE?()AA fully loaded vessel will be slower to respond to the enginesBA fully loaded vessel will maintain her headway furtherCA light vessel will be more affected by the windDA light vessel lose more rudder effect in shallow water
单选题小额支付系统仅允许对未纳入轧差的()撤销。A非实时借记业务包、非实时贷记业务回执包B非实时贷记业务包、非实时贷记业务回执包C非实时借记业务包、非实时借记业务回执包D非实时贷记业务包、非实时借记业务回执包