Which of the following is the MOST important consideration before making a change to a server?()A、Explore the ramification of the change before implementation.B、Determine the service level agreement in place before implementation.C、Review the equipment disposal procedures and policies before implementation.D、Notify all staff members of the planned system outage before implementation.

Which of the following is the MOST important consideration before making a change to a server?()

  • A、Explore the ramification of the change before implementation.
  • B、Determine the service level agreement in place before implementation.
  • C、Review the equipment disposal procedures and policies before implementation.
  • D、Notify all staff members of the planned system outage before implementation.

相关考题:

Which of the following is the MOST important consideration before making a change to a server?() A. Explore the ramification of the change before implementation.B. Determine the service level agreement in place before implementation.C. Review the equipment disposal procedures and policies before implementation.D. Notify all staff members of the planned system outage before implementation.

Which of the following is the FIRST course of action before implementing a change to a server?() A. Survey users to get their response to the potential server change.B. The change should be approved by management.C. Switch over to the alternate site so users are not affected.D. Implement RAID so the server does not go offline.

Which of the following is the MOST important physical consideration when deploying a new server?() A. Humidity monitors, Biometrics, and fire suppressionB. Cooling, rack space, and power requirementsC. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD. Biometrics, fire suppression, and power requirements

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?() A. Verify uninterruptible power supply (UPS) loadB. Verify if server consumes 220VC. Verify CPU loadD. Verify if server consumes 110V

A network technician arrives to work and discovers users are having a problem connecting thecompany server. The server operator was working on upgrades the night before.Which of the following documents should the technician use to attempt to discover the problem?()A. Network mapsB. Change managementC. BaselinesD. Cable management

Before making an important __________(decide), think it over.

Which of the following is the best title for the passage?A.HOW to Behave Well.B.What is Most Important for a Job Interview.C.To Have Good Manners before a Boss.D.Try to find a Good Job.

A network technician arrives to work and discovers users are having a problem connecting the company server. The server operator was working on upgrades the night before. Which of the following documents should the technician use to attempt to discover the problem?()A、Network mapsB、Change managementC、BaselinesD、Cable management

Which of the following is MOST important for an administrator to investigate prior to making a change on a server?()A、Manufacturer’s specificationsB、Organizational impactC、Vendor listsD、Compatibility requirements

Which of the following is the MOST important consideration when purchasing a new server for a mission critical application?()A、RAID 0 compliantB、Notifying all stakeholders of the server upgradeC、Service Level AgreementD、KVM access

Before installing an operating system on a server, which of the following is the BEST resource for an administrator to review the compatibility of the OS with the video card?()A、Server manualB、Manufacturer websiteC、IEEE standardsD、HCL

Which is the MOST important consideration before making a change to a server?()A、Explore the ramification of the change before implementation.B、Determine the service level agreement in place before implementation.C、Review the equipment disposal procedures and policies before implementation.D、Notify all staff members of the planned system outage before implementation.

Which of the following should be done before and after a service or repair is performed on a server?()A、 DefragB、 IPCONFIG /releaseC、 Firmware updateD、 Baseline

A technician needs a wireless access point to cover most of the office. Which of the following should the technician perform FIRST to achieve this? ()A、Change the radio channelB、Apply MAC address filterC、Determine placementD、Reduce radio power level

Which of the following is the FIRST course of action before implementing a change to a server?()A、Survey users to get their response to the potential server change.B、The change should be approved by management.C、Switch over to the alternate site so users are not affected.D、Implement RAID so the server does not go offline.

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、 Verify uninterruptible power supply (UPS) loadB、 Verify if server consumes 220VC、 Verify CPU loadD、 Verify if server consumes 110V

Which of the following is the MOST important physical consideration when deploying a new server?()A、 Humidity monitors, Biometrics, and fire suppressionB、 Cooling, rack space, and power requirements冷C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、 Biometrics, fire suppression, and power requirements

Which of the following is the MOST important physical consideration when deploying a new server?()A、Humidity monitors, Biometrics, and fire suppressionB、Cooling, rack space, and power requirementsC、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、Biometrics, fire suppression, and power requirements

单选题Which is the MOST important consideration before making a change to a server?()AExplore the ramification of the change before implementation.BDetermine the service level agreement in place before implementation.CReview the equipment disposal procedures and policies before implementation.DNotify all staff members of the planned system outage before implementation.

单选题Which of the following is the MOST important physical consideration when deploying a new server?()A Humidity monitors, Biometrics, and fire suppressionB Cooling, rack space, and power requirements冷C Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD Biometrics, fire suppression, and power requirements

单选题Which of the following should be done before and after a service or repair is performed on a server?()A DefragB IPCONFIG /releaseC Firmware updateD Baseline

单选题Before installing an operating system on a server, which of the following is the BEST resource for an administrator to review the compatibility of the OS with the video card?()AServer manualBManufacturer websiteCIEEE standardsDHCL

单选题Which of the following is the MOST important consideration before making a change to a server?()AExplore the ramification of the change before implementation.BDetermine the service level agreement in place before implementation.CReview the equipment disposal procedures and policies before implementation.DNotify all staff members of the planned system outage before implementation.

单选题Which of the following is the MOST important consideration when purchasing a new server for a mission critical application?()ARAID 0 compliantBNotifying all stakeholders of the server upgradeCService Level AgreementDKVM access

单选题Which of the following is the FIRST course of action before implementing a change to a server?()A Survey users to get their response to the potential server change.B The change should be approved by management.C Switch over to the alternate site so users are not affected.D Implement RAID so the server does not go offline.

单选题Which of the following is the MOST important consideration before making a change to a server?()A Explore the ramification of the change before implementation.B Determine the service level agreement in place before implementation.C Review the equipment disposal procedures and policies before implementation.D Notify all staff members of the planned system outage before implementation.

单选题Which of the following is the MOST important physical consideration when deploying a new server?()AHumidity monitors, Biometrics, and fire suppressionBCooling, rack space, and power requirementsCService level agreements, uninterruptible power supply (UPS) deployment, and CCTVDBiometrics, fire suppression, and power requirements