单选题The through cargo in No.4 hatch square stands()the way.AatBinConDby

单选题
The through cargo in No.4 hatch square stands()the way.
A

at

B

in

C

on

D

by


参考解析

解析: 暂无解析

相关考题:

Our starboard derrick boom of hatch No.4 is badly cracked ____ that it has become entirely useless.A.at its goose neck to such a extentB.at it’s goose to such an extentC.at it’s goose neck for such a extentD.at its goose neck to such an extent

______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch

Deadfreight is the charge for the ______.A.carriage of demise cargoB.cost of transshipment of over-carried cargoC.difference in the amount of cargo loaded and the amount of cargo dischargedD.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

In the stowage of deck cargo,cribbing is ______.A.Placed on deck to support the cargoB.Separation pieces used to keep cylinders upright and steadyC.Shims for stowing baled cargoD.Nets placed across the hatch opening to keep the cargo from falling in the hatch

Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall

Please fix some()(货灯).A、hold lightsB、cargo lightsC、cargo lanternsD、hatch lamps

干货通常被装载到货舱里。()A、Dry cargo is usually stowed in the hold.B、Dry cargo is usually stowed at the hatch.C、Wet cargo is usually stowed in the hold.

The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires

Cargo for ()No.4 is to be loaded first.A、roomB、cabinC、holdD、winch

单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().Aremove an existing list that would slow down cargo operationsBinitiate loading in conjunction with unloading at the hatchCimprove stability during cargo operationsDallow longshoremen easy access to the hatch

单选题Once a vessel has loaded packaged hazardous cargo,the cargo spaces shall be inspected. The spaces shall also be inspected at least once in every 24 hours. The only exception to daily inspection is when().Aa vessel is equipped with an automatic smoke or fire detecting systemBthe cargo hatches are of steel constructionCthe cargo is of a nonflammable typeDthere is sufficient fire protection located on the main deck adjacent to the cargo hatch

单选题How do you dispose()the general cargo in the fore part of Hatch No.5?AatBtoCofDwith

单选题0ur starboard derrick boom of hatch No.4 is baddly cracked()that it has become entirely useless.Aat its goose neck to such a extentBat it's goose neck to such an extentCat it's goose neck for such a extentDat its goose neck to such an extent

单选题The ship will()backward if Hatch No.4 and No.5 are over stowed.AdentBlistCleanDbend

单选题Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.AnecessityBresponsibilityCrequirementDstipulation

单选题In the stowage of deck cargo, cribbing is().Aplaced on deck to support the cargoBseparation pieces used to keep cylinders upright and steadyCshims for stowing balded cargoDnets placed across the hatch opening to keep the cargo from falling in the hatch

单选题请打开货灯。()APlease turn on cargo lights.BPlease fix cargo lights.CPlease turn on hatch lights.DPlease fix hold lights.

单选题()is known as a long hatch during loading operation.AThe largest hatch of a shipBThe hatch that is double riggedCThe hatch where a disproportionate amount of cargo is atowedDThe hatch where the most cargo is stowed

单选题干货通常被装载到货舱里。()ADry cargo is usually stowed in the hold.BDry cargo is usually stowed at the hatch.CWet cargo is usually stowed in the hold.

单选题Bonding cables are used during cargo transfer to().Aprovide safe electrical power connection to barge equipmentBkeep the vessel from surging excessivelyCprevent an accidental discharge of static electricityDsecure the cargo hose to a hatch when loading overall

单选题The proper place()the sling is made up is the square of the hatch.AwhichBwhereCwhenDhow

单选题The space in Hatch No.4 tweendeck is too().AnearBshortCcloseDsmall

单选题Deadfreight is the charge for the().Acarriage of demise cargoBcost of transshipment of over-carried cargoCdifference in the amount of cargo loaded and the amount of cargo dischargedDdifference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

单选题Our starboard derrick boom of hatch No.4 is badly cracked()that it has become entirely useless.Aat its goose neck to such a extentBat it's goose neck to such an extentCat it's goose neck for such a extentDat its goose neck to such an extent

单选题In Hatch No.3 the cargo()bulk is peaked.AinBonCwithDfor

单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().Aprovide the proper trimBprevent negative stability from developingCprevent excessive longitudinal stressesDcontrol list