Cargo for ()No.4 is to be loaded first.A、roomB、cabinC、holdD、winch

Cargo for ()No.4 is to be loaded first.

  • A、room
  • B、cabin
  • C、hold
  • D、winch

相关考题:

The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo

Deadfreight is the charge for the ______.A.carriage of demise cargoB.cost of transshipment of over-carried cargoC.difference in the amount of cargo loaded and the amount of cargo dischargedD.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.A.log bookB.short/over-loaded cargo listC.the mate’s receiptD.manifest

Where the cargo can be loaded in two different ways,one of which is more economical of space than the other,but each of which is a usual method of loading cargo of the relevant type,the Charterer ______ in whichever of these ways he pleases,unless he is expressly forbidden so to do by the charter-party.A.Has to loadB.Can loadC.LoadsD.Is loaded by

______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

Cargo securing for Ro-Ro is based on the concept of _______.A.Solid packingB.Rapid loading and dischargeC.Vessel loaded full and down to her marksD.Palletized cargo

A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo

So far 2,000 tons of reefer cargo().A、is loadedB、are loadedC、have loadedD、have been loaded

单选题()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.AWedgeBDunnageCShoreDStore

单选题Your vessel is loaded with nonhygroscopic cargoes and is going from a cold to a warm climate. You should().Astart the exhaust blowersBstart the intake blowersCnot ventilate the cargo holdsDventilate the cargo holds

单选题Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug.14th.and 16th. Under favorable weather without any remarks on().Alog bookBshort/over-loaded cargo listCthe mate's receiptDmanifest

单选题A ship is responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBafter the cargo is checked by tallymenCas soon as the cargo loading or unloading beginsDduring the time when loading or unloading is going on

单选题液体散货用泵装卸的。()ALiquid cargo is loaded and discharged by pumps.BLiquid cargo is loaded and discharged by tubes.CLiquid bulk cargo is loaded and discharged by tubes.DLiquid bulk cargo is loaded and discharged by pumps.

单选题The tentative cargo plan().Aeliminates confusion with the final stowage planBshows the approximate amount of cargo to be loaded in each holdCexpedites the total operationDrequires an unproportional number of gang hours of work to discharge the cargo

单选题There is sufficient anchorage for()at all time around the No.1 buoy and for smaller vessels around the No.4 buoy.Adeep laded vesselsBdeeply load vesselsCdeep loading vesselsDdeeply loaded vessels

单选题Liquid bulk cargo is loaded and discharged by ()(泵).ApipesBtubesCbucketsDpumps

单选题The ship will be responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBduring the time when loading or ynloading is going onCafter the cargo is checked by tallymenDas soon as loading or discharging begins

单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling

单选题The additional cargo is to be loaded()board our ship.AonBinCfromDto

单选题Cargo securing for Ro-Ro is based on the concept of().Asolid packingBrapid loading and dischargeCvessel loaded full and down to her marksDpalletized cargo

单选题A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().Acargo has been loaded or dischargedBcargo ghose is connectedCcargo pumps are startedDvessel is ready to handle cargo

单选题The most important principle in the stowage is().Ato ensure the safety of the ship and protect the cargo from being damagedBto avoid the rearrangement of the cargo loaded on boardCto reject the damaged cargo during loadingDto prevent the spontaneous combustion of coal and grain

单选题The ()(桶装货) should be loaded by cargo net.Abagged cargoBdrummed cargoCcased cargoDdeck cargo

单选题To ensure the ship’s general stability,().Ashe's loaded a little deeper forwardBshe's loaded a little deeper aftCshe has not any ballast at allDthe cargo is properly distributed throughout the ship

单选题The most important principle in the cargo stowage is().Ato avoid the rearrangement of the cargo loaded on boardBto ensure the safety of the ship and cargoCto reject the damaged cargo during loading operationDto prevent the spontaneous combustion of the coal and grain

单选题Deadfreight is the charge for the().Acarriage of demise cargoBcost of transshipment of over-carried cargoCdifference in the amount of cargo loaded and the amount of cargo dischargedDdifference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

单选题The through cargo in No.4 hatch square stands()the way.AatBinConDby