单选题A technician has just completed a CPU upgrade on a motherboard. Which of the following will MOST likely cause the PC not to boot?()AThe technician used generic thermal paste.BThe processor had pins broken during installation.CThe memory is incompatible with the new CPU.DAn incorrect fan size was installed on the heatsink.

单选题
A technician has just completed a CPU upgrade on a motherboard. Which of the following will MOST likely cause the PC not to boot?()
A

The technician used generic thermal paste.

B

The processor had pins broken during installation.

C

The memory is incompatible with the new CPU.

D

An incorrect fan size was installed on the heatsink.


参考解析

解析: 暂无解析

相关考题:

A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?() A. Perform a full system backup.B. Follow up with the customer, verifying satisfaction.C. Ask their manager to contact the customer.D. Perform a complimentary virus scan.

Why does Mr. Nixson want to begin a career in the employment industry?A.The field has a lot of potential in the futureB.He has been unable to find employment elsewhereC.He has just completed a college course in that fieldD.The employment industry is the most stable in the nation

The students have just completed their course.A:improved B:finishedC:ended D:concluded

Today is Jenny’s wedding day.She_______to Thomas.A.just has got marriedB.has just marriedC.was just marriedD.has just got married

A technician has added memory to a laser printer. To allow the printer driver software to use the additional memory, the amount of memory should be modified in:()A、the Device Settings tab in Printer Properties.B、Device Manager by clicking on the printer’s driver and selecting Parameters.C、Device Manager by selecting Upgrade Driver.D、the Color Management tab in Printer Properties.

The technician has suspicions that a browser has been hijacked. Which of the following should the technician look for in this situation?()A、A new default gateway has been setup.B、A new Internet shortcut has been added.C、A new web browser has been installed and is now the default.D、A proxy server has been enabled.

When rebooting a computer running Windows XP Home, a technician observes an error message stating,“illegal I/O port address.” Which of the following can be done to resolve this error?()A、Upgrade the motherboard BIOS.B、Upgrade to Windows XP Professional.C、Upgrade the CPU on the motherboard.D、Return to Windows 2000 Professional.

A technician is performing a memory upgrade by installing an additional 1GB stick of DDR RAM into a system. When the installation is complete, the computer shows 2GB of RAM at POST; however, it now indicates a lower speed setting for the memory. Which of the following is the MOST likely cause?()A、The newly installed RAM has a lower clock speed than the existing RAM.B、The CPU is not configured to work with the additional RAM.C、The system is incompatible with the new RAM.D、The new RAM is of lower quality, and not dependable at higher speeds.

A cisco router is booting and has just completed the POST process.It is now ready to find and load an IOSimage.what function does the router perform next?()A、It checks the configuration registerB、It attempts to boot from a TFTP serverC、It loads the first image file in flash memoryD、It inspects the configuration file in NVRAM for boot instructions

A technician upgrades a computer from Windows XP Media Center Edition to Windows Vista Home Premium. After the upgrade Aero will not turn on. The system has a 2.4 GHz processor, 1GB of RAM, and a DirectX 7 video card. Which of the following will resolve this issue?()A、Aero cannot be used on Windows Vista Home Premium.B、Upgrade the video card to a DirectX 9 compatible card.C、Upgrade the video driver.D、Upgrade the RAM to 4GB

After a baseline check was completed it was noted that the network was working far below the level of the last baseline. Which of the following should the technician do NEXT to determine where the network problems are occurring?()A、Upgrade the firmware on all routers and switchesB、Reboot the entire network one device at a timeC、Conduct a network traffic analysisD、Rerun the baseline to ensure the results were correct

A technician(技术) has a current baseline(基准线) and is told to install additional(添加) memory and a faster NIC card.  At which point in time should the next baseline be run?()A、 After the memory is installedB、 Before the upgrade is performedC、 After the NIC is installedD、 After the upgrades are performed

A technician just installed an antivirus suite on a workstation. It is kept up-to-date and has recently scanned the system. A day later the user reports slower response times than usual. Which of the following is the user MOST likely experiencing?()A、AdvertisementsB、Resource consumptionC、A trojan infectionD、Unremoved viruses

A network technician is troubleshooting a network issue that has just been reported. Which of thefollowing troubleshooting steps should the technician take FIRST to help resolve this issue?()A、Record the solution in the appropriate logs for future use.B、Ask the user who reported the issue what past documentation they have.C、Ask the user who reported the issue to explain the symptoms in detail.D、Record what steps should be taken to resolve the issue.

A technician has just completed a CPU upgrade on a motherboard. Which of the following will MOST likely cause the PC not to boot?()A、The technician used generic thermal paste.B、The processor had pins broken during installation.C、The memory is incompatible with the new CPU.D、An incorrect fan size was installed on the heatsink.

A technician is installing a memory upgrade for a remote user. The technician notes that the machine is not reporting the correct amount of memory that was installed during the POST step. Which of the following actions should the technician perform FIRST?()A、Replace the newly installed memory modules with another known-working unit.B、Remove and reseat the memory, and recheck the memory reported.C、Leave the configuration intact, and check cabling to ensure nothing was loose during the installation.D、Perform a BIOS upgrade on the machine.

An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()A、Use the 'HMC Management Restore HMC Data' option to first restore just the HMC Data..B、Use the 'HMC Management Restore Upgrade Data' option to first restore just the Upgrade Data.C、Use the 'HMC Management Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.D、Use the 'HMC Management Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.

A basic TCP/IP configuration on the system has just been completed. A remote system can be pinged by IP address but not by hostname. Which of the following actions should be performed next in an effort to successfully ping using the hostname?()A、Check routingB、Check inetd.confC、Check /etc/resolv.confD、Check interface with ifconfig

A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2

单选题A technician is performing a memory upgrade by installing an additional 1GB stick of DDR RAM into a system. When the installation is complete, the computer shows 2GB of RAM at POST; however, it now indicates a lower speed setting for the memory. Which of the following is the MOST likely cause?()AThe newly installed RAM has a lower clock speed than the existing RAM.BThe CPU is not configured to work with the additional RAM.CThe system is incompatible with the new RAM.DThe new RAM is of lower quality, and not dependable at higher speeds.

单选题A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()APerform a full system backup.BFollow up with the customer, verifying satisfaction.CAsk their manager to contact the customer.DPerform a complimentary virus scan.

单选题A user is unsatisfied with the quality of the repair that another technician has completed on their PC. Which of the following should be done to help the user?()AAgree with the user’s complaintsBClarify the user’s statementsCMinimize the user’s criticismDShadow the other technician on the next repair

单选题A technician needs to upgrade the memory in a laptop. Which of the following memory typeswould be the correct type?()ARIMMBDDR RAMCSDRAMDSODIMM

单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()APerform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.BPerform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.COn the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.DOn the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.

单选题A technician(技术) has a current baseline(基准线) and is told to install additional(添加) memory and a faster NIC card.  At which point in time should the next baseline be run?()A After the memory is installedB Before the upgrade is performedC After the NIC is installedD After the upgrades are performed

单选题Why does Mr. Nixon want to begin a career in the employment industry?AThe field has a lot of potential in the future.BHe has been unable to find employment elsewhere.CHe has just completed a college course in that field.DThe employment industry is the most stable in the nation.

单选题A technician just installed an antivirus suite on a workstation. It is kept up-to-date and has recently scanned the system. A day later the user reports slower response times than usual. Which of the following is the user MOST likely experiencing?()AAdvertisementsBResource consumptionCA trojan infectionDUnremoved viruses