An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()A、Use the 'HMC Management Restore HMC Data' option to first restore just the HMC Data..B、Use the 'HMC Management Restore Upgrade Data' option to first restore just the Upgrade Data.C、Use the 'HMC Management Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.D、Use the 'HMC Management Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.

An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()

  • A、Use the 'HMC Management > Restore HMC Data' option to first restore just the HMC Data..
  • B、Use the 'HMC Management > Restore Upgrade Data' option to first restore just the Upgrade Data.
  • C、Use the 'HMC Management > Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.
  • D、Use the 'HMC Management > Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.

相关考题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()A.An additional switch for the new HMCB.Asynchronous adapters on the new HMCC.The two 570 servers are directly connected to the new HMCD.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs.Which action will ensure the corrective service is correctly installed?() A.Select the option to automatically reboot the HMCB.Select the option to automatically reboot the HMC after each diskC.Shutdown all managed LPARs prior to beginning the install processD.Copy all disks into the SERVICE directory and select concurrent install

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?() A、Select the option to automatically reboot the HMcB、Select the option to automatically reboot the HMC after each disk.C、Shutdown all managed LPARs prior to beginning the install process.D、Copy all disks into the ""SERVICE"" directory and select concurrent install.

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、Asynchronous adapters on the new HMCC、The two 570 servers are directly connected to the new HMCD、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

Which of the following could BEST be used to recover a failed RAID 1 disk after it has been replaced?()A、 Tape restore utilitiesB、 Imaging utilitiesC、 Partitioning utilitiesD、 Array management utilities

The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()A、Use ssh to connect to the HMC and rebootB、The upgrade will display complete and ask you to rebootC、Select shutdown in the Management section of the WebSM clientD、Once logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.

The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()A、The hscroot user password.B、The CE password.C、The HMC password.D、The ASM admin password.

A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was loaded from the Product Recovery CD. The system administrator had performed a backup to DVD of the HMC data before the system failed. After restoring the backup files, it was noticed that no profile files were restored. What is the most likely cause of this problem?()A、The profile data was not initialized after restoring the backup CDB、The profile data was not backed up before doing the Critical Console Data backupC、A Critical Console Data backup was performed which backs up user data, but not profile dataD、A Save Upgrade data was done instead of a backup Critical Console Data and the profile files were not included

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.

An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk.  What is the likely cause of the problem?()  A、The administrator has failed to run ’bosboot -ad 2nd disk’ prior to the bootlist command.B、The administrator has failed to run ’bootinfo -B 2nd disk’ prior to the bootlist command.C、The administrator has failed to run ’mirrorvg -m rootvg 2nd disk’ prior to the bootlist command.D、The administrator has failed to run ’bosboot -ad /dev/ipldevice 2nd disk’ prior to the bootlist command.

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()A、Select the option to automatically reboot the HMCB、Select the option to automatically reboot the HMC after each diskC、Shutdown all managed LPARs prior to beginning the install processD、Copy all disks into the "SERVICE" directory and select concurrent install

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

An administrator is applying a corrective service to their HMC .The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()A、Select the option to automatically reboot the HMC .B、Select the option to automatically reboot the HMC after each disk.C、Shutdown all managed LPARs prior to beginning the install process.D、Copy all disks into the ""SERVICE"" directory and select concurrent install.

There is a problem with one of the disks used for your database and your system administrator informs you that the disk needs to be replaced. The replacement disk will not be available until tomorrow.  There was only one data file on this disk; it belongs to the USERS tablespace in your PROD database. Your PROD database runs in ARCHIVELOG mode and nightly online backups are taken. The users need to be able to access the data in the USERS tablespace before the replacement disk arrives. You have already taken the USERS tablespace offline and have restored the data file from last night’s backup to a new disk. Which additional steps are required in order to make the USERS tablespace available?()A、Only bring the tablespace back online.B、Only recover the tablespace and then bring the tablespace back online.C、Shut down the database, recover the data file and then start up the database.D、Issue the ALTER DATABASE RENAME FILE command, recover the tablespace, and then bring the tablespace online.E、Recover the tablespace, issue the ALTER DATABASE RENAME FILE command, and then bring the tablespace online.

The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()A、Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesB、Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointC、The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCD、The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC

单选题The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()AThe hscroot user password.BThe CE password.CThe HMC password.DThe ASM admin password.

单选题A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()A To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

单选题The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()ABoth options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesBBoth options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointCThe Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCDThe Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC

单选题The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()AUse ssh to connect to the HMC and rebootBThe upgrade will display complete and ask you to rebootCSelect shutdown in the Management section of the WebSM clientDOnce logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.

单选题An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk.  What is the likely cause of the problem?()AThe administrator has failed to run ’bosboot -ad 2nd disk’ prior to the bootlist command.BThe administrator has failed to run ’bootinfo -B 2nd disk’ prior to the bootlist command.CThe administrator has failed to run ’mirrorvg -m rootvg 2nd disk’ prior to the bootlist command.DThe administrator has failed to run ’bosboot -ad /dev/ipldevice 2nd disk’ prior to the bootlist command.

单选题A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was loaded from the Product Recovery CD. The system administrator had performed a backup to DVD of the HMC data before the system failed. After restoring the backup files, it was noticed that no profile files were restored. What is the most likely cause of this problem?()AThe profile data was not initialized after restoring the backup CDBThe profile data was not backed up before doing the Critical Console Data backupCA Critical Console Data backup was performed which backs up user data, but not profile dataDA Save Upgrade data was done instead of a backup Critical Console Data and the profile files were not included

单选题There is a problem with one of the disks used for your database and your system administrator informs you that the disk needs to be replaced. The replacement disk will not be available until tomorrow.  There was only one data file on this disk; it belongs to the USERS tablespace in your PROD database. Your PROD database runs in ARCHIVELOG mode and nightly online backups are taken. The users need to be able to access the data in the USERS tablespace before the replacement disk arrives. You have already taken the USERS tablespace offline and have restored the data file from last night’s backup to a new disk. Which additional steps are required in order to make the USERS tablespace available?()AOnly bring the tablespace back online.BOnly recover the tablespace and then bring the tablespace back online.CShut down the database, recover the data file and then start up the database.DIssue the ALTER DATABASE RENAME FILE command, recover the tablespace, and then bring the tablespace online.ERecover the tablespace, issue the ALTER DATABASE RENAME FILE command, and then bring the tablespace online.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc