以下为可加批注的有()。A、Deck cargo at shipper’s risk.B、Not tallied by ship’s crew.C、1000 packages tallied by ship’s crew.990 packages tallied by tallyman.D、Tally said to be.

以下为可加批注的有()。

  • A、Deck cargo at shipper’s risk.
  • B、Not tallied by ship’s crew.
  • C、1000 packages tallied by ship’s crew.990 packages tallied by tallyman.
  • D、Tally said to be.

相关考题:

The word “tallied” (Line 3, Para. 2) probably means ______.A.calculatedB.corresponded toC.listedD.gave

According to the customs of this port,the work of opening and closing hatch covers is done by ______.A.the ship's officersB.the foreman from the shoreC.the ship's handsD.the tally man

Marks and Nos.,Number and kind of packages,description of goods should be declared in ______.A.SHIP'S STORE LISTB.PERSONAL EFFECTS LISTC.CARGO DECLARATIOND.GENERAL DECLARATION

Upon underwater detection,there were no apparent defects on the bottom plates,bilge keels,rudder and propeller of the said vessel.This kind of wording usually appeared on ______.A.ship surveyor's reportB.a ship's certificateC.a cargo inspection reportD.a diver survey report

A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship's officers to ______.A.ensure the fitness and safety of cargo spacesB.ensure adequate packaging of the cargoC.prevent delays due to quarantine restrictionsD.correct all defects in the ship's construction

The master of a ship must collect general average contributions for the benefit of those entitled to them,whether they are cargo owners or ship owner,and ______ the Shipowner's lien on the cargo,where necessary,until they are paid.A.exerciseB.takeC.makeD.have

Marks and Nos.,numbers and kinds of packages,description of goods are to be provided in ______.A.Passenger ListB.General DeclarationC.Cargo DeclarationD.Ship's Stores Declaration

You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.A.use separation cloths between the deck and cargoB.place the cargo on a layer of spaced dunnageC.hose down the deck before loading the cargoD.use bag-on-bag stowage

艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.

Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck

从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()A、When a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.B、When a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.C、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.D、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.

单选题The meaning of slacken her speed is().Aincrease ship's speedBslow down ship's speedCmake up ship's speedDfix up shp's speed

单选题We usually choose cargo-handing equipment according to().Athe ship typeBthe port's organizationCthe cargo's natureDthe docker's ability

单选题The well preparation of stowage plan will().Aincrease the ship's officers' knowledgeBextend the ship's officers' knowledgeCimprove the ship's cargo-handling equipmentDraise the working efficiency

单选题Making cargo plan for appropritate distribution of the cargo on board is()duty.Aa ship's officer'sBa tallyman'sCa port planner'sDa foreman's

单选题I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.AINBONCATDFOR

单选题The apparent wind can be zero when the true wind is from().Aahead and equal to the ship's speedBastern and equal to the ship's speedCahead and equal to twice the ship's speedDastern and equal to twice the ship's speed

单选题To ensure the ship’s general stability,().Ashe's loaded a little deeper forwardBshe's loaded a little deeper aftCshe has not any ballast at allDthe cargo is properly distributed throughout the ship

单选题从水线到船底是“吃水”。()A“From the centerline to the ship’s bottom” is “draft”.B“From the keel to the ship’s bottom” is “draft”.CThe maximum distance from the waterline to the ship’s bottom is “draft”.D“From the centerline to the ship’s main deck” is “draft”.

单选题Upon underwater detection,there were no apparent defects on the bottom plates,bilge keels,rudder and propeller of the said vessel.This kind of wording usually appeared on().Aship surveyor's reportBa ship's certificateCa cargo inspection reportDa diver survey report

单选题We usually choose cargo-handling equipment according to().Athe ship typeBthe port's organizationCthe cargo's natureDthe dockers’ ability

单选题There are many ()(类型)of ship’s cargo handling equipment.AtypesBkindCseriesDtype

单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().Aensure the fitness and safety of cargo spacesBensure adequate packaging of the cargoCprevent delays due to quarantine restrictionsDcorrect all defects in the ship's construction

单选题Forecastle deck is located in the ship’s().Abow stemBsternCportsideDstarboard side

单选题Forecastle deck is located( 位于) at the ship’s ().AbowBsternCmidshipDabeam

单选题A claim for cargo damages may be held against the ship owner if such damage is the result of failure of the ship’s officers to().Acorrect all defects in the ship's constructionBensure the fitness and safety of cargo spacesCensure adequate packaging of the cargoDprevent delays due to quarantine restrictions