艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.
艏楼甲板位于船艏部。()
- A、Forecastle deck is located at the ship’s stern.
- B、Poop deck is located at the ship’s bow.
- C、Forecastle deck at located in the ship’s bow.
- D、Poop deck is located at the ship’s stern.
相关考题:
甲板部由大副负责。A.The captain is the head of a ship.B.The master is the head of a ship.C.The deck department is under the command of the chief officer.D.The pilot is the head of a ship.
Where is the GMDSS Radio Logbook kept aboard ship?A.Attached to the Deck LogbookB.At the principal radio operating locationC.In the Chief Mate’s officeD.In the Master’s office
The rubbish should be collected on ()and disposed of 25 miles off the land.A、the poop deckB、the main deckC、the forecastle deckD、lower deck
甲板部由大副负责。()A、The captain is the head of a ship.B、The master is the head of a ship.C、The deck department is under the command of the chief officer.D、The pilot is the head of a ship.
以下为可加批注的有()。A、Deck cargo at shipper’s risk.B、Not tallied by ship’s crew.C、1000 packages tallied by ship’s crew.990 packages tallied by tallyman.D、Tally said to be.
Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck
The forecastle and the poop decks are a ship’s face and back.()A、艏楼和艉楼是船舶的脸面和后背。B、艏楼和艉楼是船舶的两部分。C、船首和船尾是船舶的两部分。D、船首和船尾是船舶的脸面和后背。
艉楼甲板位于船舶艉部。()A、Forecastle deck is located in the ship’s stern.B、Poop deck is located in the ship’s bow.C、Forecastle deck is located in the ship’s bow.D、Poop deck is located in the ship’s stern.
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()A、When a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.B、When a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.C、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.D、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.
救生艇置放在于艇甲板。()A、Lifeboat is located on the boat deck.B、Lifeboat is located on the main deck.C、Life craft is located on the boat deck.D、Lifeboat is located on the lower deck.
船上的船员属于三个部门:甲板部、轮机部和事务部。()A、Seamen on board the ship are in two departments: Deck Department, Engine Department.B、Seaman on board the ship are in two department: Deck Department, Engine Department and Service Department.C、The Deck Department and the Engine Department are the two departments.D、Seamen on board the ship are in three departments: the Deck Department, the Engine Department and the Service Department.
单选题The deck loads on a ship are distributed through the deck beams to the().AframesBhullCstringersDplates
单选题艏楼甲板位于船艏部。()AForecastle deck is located at the ship’s stern.BPoop deck is located at the ship’s bow.CForecastle deck at located in the ship’s bow.DPoop deck is located at the ship’s stern.
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.
单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.AExtreme draftBMolded draftCExtreme depthDMolded depth
单选题The forecastle and the poop decks are a ship’s face and back.()A艏楼和艉楼是船舶的脸面和后背。B艏楼和艉楼是船舶的两部分。C船首和船尾是船舶的两部分。D船首和船尾是船舶的脸面和后背。
单选题Prior to taking over the deck watch in port,the relieving officer shall not be informed by the officer in charge of the deck watch as to().Athe depth of the water at the berthBthe ship‟s draughtCthe duty of the relieving officerDthe arrangement of anchor and the scope of the anchor chain
单选题艉楼甲板位于船舶艉部。()AForecastle deck is located in the ship’s stern.BPoop deck is located in the ship’s bow.CForecastle deck is located in the ship’s bow.DPoop deck is located in the ship’s stern.
单选题首楼甲板涂上两度红丹漆和干舷漆。()AApply two coats of red lead primer and topside paint to the forecastle deck.BApply two coats of red lead primer and boottopping paint to the forecastle deck.CApply two coats of topside paint and red lead primer to the poop deck.DApply two coats of red lead primer and topside paint to the poop deck.
单选题()is from baseline to top of the upper deck breadth at the ship’s side amidships.AExtreme draftBMolded draftCExtreme depthDMolded depth
单选题从水线到船底是“吃水”。()A“From the centerline to the ship’s bottom” is “draft”.B“From the keel to the ship’s bottom” is “draft”.CThe maximum distance from the waterline to the ship’s bottom is “draft”.D“From the centerline to the ship’s main deck” is “draft”.
单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().AgirdersBstanchionsCframesDbeams
单选题On a ship,the deck stringer is the outboardmost deck().AplatingBbeamCstiffenerDstanchion