单选题The tube in a boiler should be blinded if found ().AscaledBinformedCleakyDdeformed

单选题
The tube in a boiler should be blinded if found ().
A

scaled

B

informed

C

leaky

D

deformed


参考解析

解析: 暂无解析

相关考题:

The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to______.A.precipitate(使沉淀) silica (硅石)from solutionB.reduce corrosion in the heating coilC.prevent clogging and erosion in the coilD.maintain zero water hardness

Which statement about the inert gas system is TRUE ________.A.Boiler soot blowers should never be used when the IG system is operatingB.The boiler will produce the best quality of flue gas for the IG system when the boiler load is very lightC.The boiler will produce the most quantity of flue gas for the IG system when the boiler load is very lightD.Flue gas with excessive oxygen content is de-oxygenated in the scrubber

单选题The safety valves should be tested and adjusted when the boiler survey is ()AcompletedBcarried outCcleanedDsteamed

单选题What is NOT a function of the steam drum of a marine water-tube boiler().AReceives saturated steam from the generating tubesBServes as a reservoir of boiler feed waterCHolds internal fittings for separation of moisture from steamDCollects steam exhausted from the turbines

单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()Anatural circulation of the water in the water tube boiler is better than that in the fire tube boilerBfor the same output the water tube boiler will carry less mass of water compared with the fire tube boilerCthe water tube boiler will cost shorter time for steam raisingDthe water tube boiler require lower skill in operating and maintaining

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()Arelight the boiler immediately to prevent loss of steam pressureBrelight the fire off the brickwork as the bricks are cherry redCpurge the furnace of any combustible gases before attempting to relight the fireDspeed up the feed pump to prevent dry firing when the burner flame is reestablished

单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().Aoperating the boiler at less than normal water levelBinstalling fins on the firesides of water-tubesCincreasing the amount of excess air to the burnersDtreating the boiler water with chemical oxygen scavengers

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll handhole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题Waterside scale in a fire-tube boiler may cause ().Aincreased heat transferBfireside erosionChigh steam demandDoverheated tubes

单选题Which of the following may hardness of the boiler water cause?() (1) scale formation (2) tube failure (3) corrosionA(1)and(2)B(1)and(3)C(2)and(3)D(1),(2)and(3)

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Aremove suspended and precipitated solids from the boiler waterBcompletely drain the boiler in an emergency situationCprevent hardened scale deposits in the water drumDremove floating impurities from the oily water surface

单选题A distorted furnace in a fire-tube auxiliary boiler may be the result of ()Afiring for extended periods in the low fire modeBoverheating, due to waterside depositsCvarying the water level above the crown sheetDcarrying excessive alkalinity in the boiler water

单选题The water in an auxiliary boiler should be tested daily for ().Adissolved oxygenBchloridesCsludgeDdissolved nitrogen

单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()Acyclone furnace boiler typeBdry back boiler typeCwater-tube typeDcritical circulation boiler type

单选题Which of the following actions should be taken by the engine room watch when the general alarm is sounded continuously?()AThe fire pump should be startedBThe boiler rims should be securedCThe fixed CO2 system should be initiated into actionDThe engine room ventilation should be secured

单选题Pyrometers commonly found on diesel engine exhaust systems, consist of()Apyrostats and a voltmeterBa gas-filled bellows, a tube and a pressure gaugeCthermocouples and a voltmeterDammeters and thermocouples

单选题The internal part of boiler should be welded by yard if found ().AsealedBcrackedCshape changedDdeformed

单选题The internal part of the boiler, if found (), has to be chemically washed by yard.AdeformedBrustedCcrackedDscaled

单选题The internal part of boiler should be cleaned by yard if found ().AscaledBwornCdeformedDrested

单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()Aprecipitate silica from solutionBreduce corrosion in the heating coilCprevent clogging and erosion in the coilDmaintain zero water hardness

单选题The water in an auxiliary boiler should be tested for chloride content to determine ().Atotal dissolved solidsBsalt contaminationCwater hardnessDchlorine contamination

单选题() should be tested and adjusted when the boiler survey is carried out.AThe boiler oil tankBThe steam pipeCThe fire sideDThe safety valves

单选题(), iea steam cooler, may be filled in the boiler system to control the superheated steam temperature.AAn economizerBAn attemperatorCA water dramDA down-comer tube

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Acompletely drain the boiler in an emergencyBprevent sludge from forming in the drumCremove floating impurities from the boiler water surfaceDremove settled solids from the water drum

单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A10B7C4D1

单选题The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().AhourBdayCweekDmonth