单选题The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().AhourBdayCweekDmonth

单选题
The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().
A

hour

B

day

C

week

D

month


参考解析

解析: 暂无解析

相关考题:

The water level in the gauge glass when a boiler is operating is _____ when the boiler is shut down.A.lower thanB.higher thanC.belowD.equal to

The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler() A.salinity is abnormallyB.high steam demand is tooC.feed-water flow is lowD.water level is abnormally low

The water in an auxiliary boiler should be tested for chloride content to determine ( ).A.total dissolved solidsB.salt contaminationC.water harcnessD.chlorine contamination

If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause may be ______.A.high steam pressure in the boilerB.abnormally high feed-water temperatureC.abnormally high boiler water temperatureD.steam demand exceeding feed pump capacity

The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to______.A.precipitate(使沉淀) silica (硅石)from solutionB.reduce corrosion in the heating coilC.prevent clogging and erosion in the coilD.maintain zero water hardness

单选题The most common cause of scale formation in an auxiliary boiler is ()Aconcentrations of calcium sulfate in the boiler waterBfuel oil in the feed waterCimproper treatment of the feed water with calcium sulfateDexcessive feed water alkalinity

单选题The water level of an exhaust gas boiler which is independent of the auxiliary boiler and just as the extra heating surface of it ()Awill be modulated in proportionBwill be modulated in proportion and integralCwill be modulated in proportion and differentialDwill not be modulated at all

单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()Anatural circulation of the water in the water tube boiler is better than that in the fire tube boilerBfor the same output the water tube boiler will carry less mass of water compared with the fire tube boilerCthe water tube boiler will cost shorter time for steam raisingDthe water tube boiler require lower skill in operating and maintaining

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().Aoperating the boiler at less than normal water levelBinstalling fins on the firesides of water-tubesCincreasing the amount of excess air to the burnersDtreating the boiler water with chemical oxygen scavengers

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll handhole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题In an auxiliary boiler steam and water system, the highest pressure will be in the ().Asteam stop valveBdry pipeCfeedwater systemDgenerating tubes

单选题The correct procedure for giving an auxiliary boiler a bottom blow, is to begin()Awhen the boiler has been secured long enough for most solids to settleBwhen the boiler has been cooled to ambient temperatureConly after raising the water level to within 0~5 inch of the high water cutout onlyDafter bypassing the low pressure

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Aremove suspended and precipitated solids from the boiler waterBcompletely drain the boiler in an emergency situationCprevent hardened scale deposits in the water drumDremove floating impurities from the oily water surface

单选题A distorted furnace in a fire-tube auxiliary boiler may be the result of ()Afiring for extended periods in the low fire modeBoverheating, due to waterside depositsCvarying the water level above the crown sheetDcarrying excessive alkalinity in the boiler water

单选题The water in an auxiliary boiler should be tested daily for ().Adissolved oxygenBchloridesCsludgeDdissolved nitrogen

单选题The water in an auxiliary boiler should be chemically tested daily for alkalinity and()Asoap hardnessBnitrog encontentCchloride contentDdissolved CO2

单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()Aprecipitate silica from solutionBreduce corrosion in the heating coilCprevent clogging and erosion in the coilDmaintain zero water hardness

单选题The water in an auxiliary boiler should be tested for chloride content to determine ().Atotal dissolved solidsBsalt contaminationCwater hardnessDchlorine contamination

单选题The water level in the gauge glass when a boiler is operating is () when the boiler is shut down.Alower thanBhigher thanCbelowDequal to

单选题Excessive alkalinity of the water in an auxiliary boiler can cause ().Acaustic embrittlement of the boiler metalBacidic corrosion of the boiler metalChard scale deposits on the boiler tubesDetching of the heat exchange surfaces

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Acompletely drain the boiler in an emergencyBprevent sludge from forming in the drumCremove floating impurities from the boiler water surfaceDremove settled solids from the water drum

单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().Ahigh steam pressure in the boilerBabnormally high feed water temperatureCabnormally high boiler water temperatureDsteam demand exceeding feed pump capacity

单选题Prior to lighting off a cold automatically fired auxiliary boiler, you should ().Acheck and regulate the water levelBclose the air cock once fires are litCblowdown the gage glassDcrack the steam stop to assure protective steam flow

单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A10B7C4D1

单选题If an operating auxiliary boiler has a water pH reading of 7, you should ().Abottom blow the boilerBtreat the water with caustic sodaCtreat the water with chemical scavengersDreduce the water alkalinity to recommended readings

单选题Which action should be taken when an auxiliary boiler in is operation?()AClean all electrical connectionsBLift the relief valves by handCInspect and clean all solenoid valvesDInspect for oil and water leaks