单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()Arelight the boiler immediately to prevent loss of steam pressureBrelight the fire off the brickwork as the bricks are cherry redCpurge the furnace of any combustible gases before attempting to relight the fireDspeed up the feed pump to prevent dry firing when the burner flame is reestablished

单选题
In the event of a flame failure in an auxiliary water-tube boiler, you must()
A

relight the boiler immediately to prevent loss of steam pressure

B

relight the fire off the brickwork as the bricks are cherry red

C

purge the furnace of any combustible gases before attempting to relight the fire

D

speed up the feed pump to prevent dry firing when the burner flame is reestablished


参考解析

解析: 暂无解析

相关考题:

失效时间failure event(名词解释)

A ()is a copy of a file for use in the event of failure or loss of the original. A.second storageB.bufferC.backupD.database

The fuel oil supply system to an automatic auxiliary boiler, will automatically shutdown if the boiler ______.A.steam demand is highB.salinity is highC.safety valve simmers(爆发)D.burner flame is extinguished

All of the followings are the detainable deficiencies under the SOLAS Convention except ______.A.failure of proper operation of propulsion and other essential machinery, as well as electrical installationB.failure of the proper operation of the main and auxiliary steering gearC.failure of engineering watch arrangements to conform to the requirements specified for the ship by AdministrationD.failure of the proper operation of emergency generator, lighting, batteries and switches

What happens on failure of a pre or post event script?()A、The error is logged and HA will continue processingB、If configured, a recovery command will be run to deal with the problemC、An event error is generated and 3 minutes later the cluster will enter config_too_long stateD、An event error is generated and 6 minutes later the cluster will enter config_too_long state

失效时间failure event

为方便分析和找到问题,在EVENT窗口一般会选择哪些选项()A、handoverB、drop callC、block callD、handover failure

While reviewing the hacmp.out after a node failure,an administrator realizes that the custom Event queue_down did not execute. The queue_down event shows up when a list of custom events is displayed.  What would be the next logical step to resolve this problem?()A、 Delete the custom event and add a pre event and synchronize.B、 Synchronize the cluster and recheck the cluster custom events.C、 Create an application server that will stop and start the queues.D、 Add a pre or post event to appropriate cluster events and synchronize.

单选题() is provided to alternators, in the event of prime mover failure to ensure that the alternator does not act as a motor.AReverse current protectionBReverse power protectionCSynchronising deviceDFrequency meter

单选题The purpose of a temperature sensing device installed in the stack of a small automatically fired auxiliary steam boiler is to secure the oil burner()Ain the event of a flame failureBin the event of a stack fireCwhen the water level reach the crown sheetDwhen the feed pump discharge pressure drops to a preset minimum

单选题What happens on failure of a pre or post event script?()AThe error is logged and HA will continue processingBIf configured, a recovery command will be run to deal with the problemCAn event error is generated and 3 minutes later the cluster will enter config_too_long stateDAn event error is generated and 6 minutes later the cluster will enter config_too_long state

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().Aoperating the boiler at less than normal water levelBinstalling fins on the firesides of water-tubesCincreasing the amount of excess air to the burnersDtreating the boiler water with chemical oxygen scavengers

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll handhole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题A smoking burner with a pulsating flame in auxiliary boiler, is an indication that the()Afuel oil supply temperature is normalBburner electrode is incorrectly positionedCfuel/air ratio is incorrectDignition current is too low

单选题In the event of failure of an auxiliary such as a lubricating pump, the standby pump is started and put on the line automatically“the line” in this sentence refers to()Afuel manifoldBlubricating pipe lineCauxiliary engine pipe lineDgenerator output line

单选题If you were inspecting the valve springs on an auxiliary diesel engine, your best indication of impending spring failure would be ()Aa glazed surface on the springBnicks in the protective coatingCa build up of sludge depositsDcracks in the surface of the spring

单选题The fuel oil supply system to an automatic auxiliary boiler, will automatically shutdown if the boiler ()Asteam demand is highBsalinity is highCsafety valve simmersDburner flame is extinguished

单选题The flame safeguard control system of a large automatic auxiliary boiler will provide fuel shut off in the case of high ().AwaterBvoltageCfuel pressureDsteam pressure

单选题Which of the following actions should normally be taken during each watch when the auxiliary boilers is in operation?()Aclean the flame scanner photocell windowBInspect and clean all solenoid valvesClift the safety valves by handDInspect for oil or water leaks

单选题When there is a flame failure in an automatically fired auxiliary boiler, the ().Aair supply is shut offBfuel supply is shut offCwater supply is shut offDsafety valve lifts

单选题Excessive vibration of an automatically fired auxiliary boiler can be caused by ()Aair or water in the furnaceBcombustion pulsesCfuel oil pump failureDflame failure

单选题Ignition failure in an automatically controlled auxiliary boiler could be caused by()Acarbon deposits on the flame scannerBhigh fuel oil temperatureClow fuel oil viscosityDhigh steam pressure

单选题Improper maintenance of the fuel oil burners in an automatically fired auxiliary boiler, could result in ()Aincreased fuel consumptionBincreased feed water consumptionCfuel pump failureDcombustion control system failure

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Acompletely drain the boiler in an emergencyBprevent sludge from forming in the drumCremove floating impurities from the boiler water surfaceDremove settled solids from the water drum

单选题Flame failure in an automatically fired auxiliary boiler can from a/an ()Aincorrect electrode settingBincorrect nozzle positionCclogged fuel nozzleDbroken high tension lead