单选题The internal part of boiler should be welded by yard if found ().AsealedBcrackedCshape changedDdeformed

单选题
The internal part of boiler should be welded by yard if found ().
A

sealed

B

cracked

C

shape changed

D

deformed


参考解析

解析: 暂无解析

相关考题:

Part ADirections:Suppose you are going to graduate. You want to hold a yard sale before you leave. Write a poster to advertise your sale, providing the following information:1) time and place of the sale,2) items for sale, and3) ways to contact you.You should write about 100 words neatly on ANSWER SHEET 2. Do not sign your own name. Use “Li Ming” instead. (10 points)

You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()A. Internal routers within the backbone area (area 0)B. Internal routers within the NSSAsC. Internal routers within the stubby areasD. ASBRsE. ABRsF. DRs and BDRs

The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to______.A.precipitate(使沉淀) silica (硅石)from solutionB.reduce corrosion in the heating coilC.prevent clogging and erosion in the coilD.maintain zero water hardness

Which part provides for transverse control and positioning of a boom in a conventional yard and stay system ________.A.GuyB.ShroudC.SpiderD.Topping lift

Which statement about the inert gas system is TRUE ________.A.Boiler soot blowers should never be used when the IG system is operatingB.The boiler will produce the best quality of flue gas for the IG system when the boiler load is very lightC.The boiler will produce the most quantity of flue gas for the IG system when the boiler load is very lightD.Flue gas with excessive oxygen content is de-oxygenated in the scrubber

According to this passage, which of the following statements is true?A.In boiler and machinery spaces, there is the air conditioning.B.In the boiler rooms the requirement of air volume should meet 25-50% of combustion requirement.C.To maintain the comfort zone in the separate control room the air conditioning plant should be fitted.D.The comfort conditions can be maintained in the engine room all the time.

零担中转货场 part-load transit freight yard

You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()A、Internal routers within the backbone area (area 0)B、Internal routers within the NSSAsC、Internal routers within the stubby areasD、ASBRsE、ABRsF、DRs and BDRs

单选题The safety valves should be tested and adjusted when the boiler survey is ()AcompletedBcarried outCcleanedDsteamed

单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.Athe formerBthe firstCthe latterDthe last

单选题What is NOT a function of the steam drum of a marine water-tube boiler().AReceives saturated steam from the generating tubesBServes as a reservoir of boiler feed waterCHolds internal fittings for separation of moisture from steamDCollects steam exhausted from the turbines

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()AThe safety valve escape piping should be disconnected from the valve body and a blank insertedBThe boiler vent valves should be openedCAll handhole/manhole covers should be tightened up as much as possible to preclude any leaksDAll of the above

单选题The water in an auxiliary boiler should be tested daily for ().Adissolved oxygenBchloridesCsludgeDdissolved nitrogen

单选题Which of the following actions should be taken by the engine room watch when the general alarm is sounded continuously?()AThe fire pump should be startedBThe boiler rims should be securedCThe fixed CO2 system should be initiated into actionDThe engine room ventilation should be secured

单选题In a modern internal combustion diesel engine, the load carrying part of the engine is referred to as the()Abedplate or baseBsump or oil panCcylinder blockDframe

单选题The internal part of the boiler, if found (), has to be chemically washed by yard.AdeformedBrustedCcrackedDscaled

单选题The internal part of boiler should be cleaned by yard if found ().AscaledBwornCdeformedDrested

单选题The tube in a boiler should be blinded if found ().AscaledBinformedCleakyDdeformed

单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()Aprecipitate silica from solutionBreduce corrosion in the heating coilCprevent clogging and erosion in the coilDmaintain zero water hardness

单选题The water in an auxiliary boiler should be tested for chloride content to determine ().Atotal dissolved solidsBsalt contaminationCwater hardnessDchlorine contamination

单选题() should be tested and adjusted when the boiler survey is carried out.AThe boiler oil tankBThe steam pipeCThe fire sideDThe safety valves

单选题Worn out ring grooves should be () to standard dimension after being welded.AmachinedBboredChonedDdrilled

名词解释题零担中转货场 part-load transit freight yard

单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A10B7C4D1

单选题The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().AhourBdayCweekDmonth

单选题Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().AGuyBShroudCSpiderDTopping lift