单选题The construction portfolio may be included as part of the ship().Ageneral plansBoperating manualCbuilders documentationDCCS file

单选题
The construction portfolio may be included as part of the ship().
A

general plans

B

operating manual

C

builders documentation

D

CCS file


参考解析

解析: 暂无解析

相关考题:

Which of the following are included as part of a scope statement?A.Project justificationB.Project deliverablesC.Project objectivesD.All of the aboveE.B and C

146 Which of the following are included as part of a scope statement?A. Project justificationB. Project deliverablesC. Project objectivesD. All of the aboveE. B and C

● Which of the following are included as part of a scope statement?A Project justificationB Project deliverablesC Project objectivesD All of the aboveE B and C

Though the format of conference notices may vary, but() are usually included. A、name, date and venue of the conferenceB、sponsors and/or organizers of the conferenceC、purpose of the conferenceD、contact information

Pollution of the waterways may result from the discharge of ______.A.sewageB.the galley trash canC.an oily mixture of one part per millionD.All of the above

A schedule is commonly used in project planning and project portfolio management.(73) on a schedule may be closely related to the work breakdown structure(WBS)terminal elements.the statement of work.or a contract data requirements listA.EssencesB.ElementsC.PurposesD. Issues

(46)It may be said that the measure of the worth of any social institution is its effect in enlarging and improving experience; but this effect is not a part of its original motive.此处译文为:

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.A.chemical and physical properties of the materialB.name of the alternative standard or specificationC.the ASTM or ABS specification the material approximatesD.manufacturer or origin of the material

The master may bind the Shipowner or Charterer ______ doing such things as are necessary on the part of the one or of the other to carry out the contract.A.withB.forC.byD.to

A salvor ______ the payment due thereunder to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part.A.may be deprived of the whole or part ofB.may not be deprived of any part ofC.will only be rewardedD.will not be rewarded any part of

Which part is NOT included in task-based teaching of vocabulary?A.Presenting.B.Tasks.C.Showing work.D.Mechanical practice.

A schedule is commonly used in project planning and project portfolio management.( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list. A.EssencesB.ElementsC.PurposesD.Issues

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materialsB、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materials.B、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

An administrator uses C-SPOC to change the user password for all nodes that belong to a  Resource group. The administrator must perform this operation on a node that is:()  A、 included in the resource group.B、 currently managing the resource group.C、 not part of an application resource group.D、 included in a cluster_admin resource group.

Which security token may carry user attribute information as part of the defined token format?()A、KerberosB、RACF TokenC、SAML AssertionD、Username Token

单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().Achemical and physical properties of the materialBname of the alternative standard or specificationCthe ASTM or ABS specification the material approximatesDmanufacturer or origin of the material

单选题Meals are included in the tour price in some places where _____.Arestaurant choice may be limitedBthere are many nearby restaurantsCdelightful dishes are not servedDfood may be too expensive

单选题Air that may enter a refrigeration plant tends to collect in the ().Aupper part of the receiverBupper part of the condenserCdown stream end of the cooling coilDoutlet end of the condenser

单选题The International Code for the Construction and equipment of Ships Carrying Dangerous Chemicals in Bulk (IBC Code) is a part of ()ASOLASBMARPOLCSTCWDBallast Water convention

单选题An administrator uses C-SPOC to change the user password for all nodes that belong to a  Resource group. The administrator must perform this operation on a node that is:()A included in the resource group.B currently managing the resource group.C not part of an application resource group.D included in a cluster_admin resource group.

单选题A refusal to work part of the day only may()to be a strike even though such refusal is not in breach of contract.AholdBbe heldCbe maintainedDbe reported

单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().Aensure the fitness and safety of cargo spacesBensure adequate packaging of the cargoCprevent delays due to quarantine restrictionsDcorrect all defects in the ship's construction

单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().Aareas where special materials are usedBhazardous areasClocation of emergency repair equipmentDtype and strength of materials used

单选题What does the sentencethe penny's days may be numbered in the last paragraph probably mean?AThe penny may be out of use very soon.BThe value of the penny may rise.CThe penny has a special place in American history.DThe penny is part of American culture.

多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materials.BThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them

单选题A record of the types and strengths of steels used on a ship must be included in the().Ageneral plansBbuilder's documentationCCertificate of InspectionDconstruction portfolio