An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materials.B、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()

  • A、The location and extent of application of different grades and strengths of materials.
  • B、The approved and available welding procedure adopted in the construction
  • C、Restrictions or prohibitions of repairing or modification
  • D、None of them

相关考题:

The quality objectives are approved in the conceptual stage of the project by the:A . Project EngineerB . Project ManagerC . Functional ManagerD . Quality Assurance ManagerE . Project Owner

A contract is legally binding and must comprise all but one of the following:A legal capacityB mutual assentC approved negotiationsD considerationE legality

Neither their parents nor their friends have approved () their marriage yet. A.forB.ofC.toD.with

But in the end he approved of our proposal.A.undoubtedlyB.certainlyC.ultimatelyD.necessarily

I hope our plan will() by the board. A、be approvingB、approveC、be approved

目前国际银行业应用比较广泛的组合模型包括( )。A.Credit Metrics模型B.Credit Portfoli0 View模型C.Credit Risk+模型D.KMV模型E.ZETA模型

I hope our plan will()by the board.A. approveB. be approvingC. be approved

The dumping of refuse in a lock is permitted ______.A.when approved by the lockmasterB.shen locking downboundC.at no timeD.during high water only

We will inform. you of the result ____ the program is approved by the board. A、in order thatB、as ifC、even thoughD、as soon as

When he was a boy he ________ his talent for writing.A、demonstratedB、clarifiedC、illustratedD、approved

If the approved change requests have an effect on the project scope, then the corresponding component documents and cost baselines, and( ) of the project management plan. Are revised and reissued to reflect the approved changesA.developing baselinesB.testing baselinesC.schedule baselinesD.ending baselines

Where do you obtain approved placards containing instructions for the launching and inflation of an approved inflatable liferaft?A.Officer in Charge,Marine InspectionB.The manufacturer of the liferaftC.Maritime AdministrationD.The owner of the vessel on which the liferafts are carried

The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing vessel consists of ______.A.One approved flotation cushion for each person on boardB.One approved life preserver for each person on board and one life ringC.One approved inflatable vest for each person on boardD.Lifeboat capacity equal to 1 1/2 times the number of persons on board

If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and( )of the project management plan are revised and reissued to reflect the approved changes. A.developing baselines B.testing baselines C.schedule base lines D.ending baselines

Other than through the Purchase Orders application, how can Purchase Orders be created in IBM Maximo Asset Management V6.2?()A、 from an approved Lease, Rental, Master, or Purchase contractB、 from a Purchase Requisitions Create PO action, create the approved Purchase OrderC、 from a Purchase Requisition, a Request for Quotation, a Master Contract, or a reorder processD、 from a Purchase Requisition, a Request for Quotation, a Purchase Contract, or a reorder process

You are a security administrator for your company. The company has one main office and five branch offices. Network administrators work in the main office and each branch office.    Network administrators in the main office frequently create scripts that automate common  administrative tasks. You review each script to ensure it does not introduce security vulnerabilities. Scripts that do not introduce security vulnerabilities are considered approved. Occasionally, branch office administrators modify these scripts and distribute the modified scripts to other  branch office administrators. Branch office administrators often report that they accidentally run a modified version of a script.    You need to ensure that branch office administrators can verify which scripts are approved scripts.  What should you do?()A、 Maintain a list of the dates that the approved scripts were last modified. lnstruct branch office administrators to verifB、 Digitally sign All approved scripts. Instruct branch office administrators to verify the signature before using a script.C、 Distribute all approved scripts to branch office administrators in an e-mail message.D、 Place all approved scripts on a file server in the main office. Assign All branch office administrators only the Allow -the approved scripts. Instruct administrators to copy scripts from this file server.

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materialsB、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()A、 Approved (APPR)B、 Waiting on Materials (WMATL)C、 Waiting to be Scheduled (WSCH)D、 Waiting on Plant Condition (WPCOND)

单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()A Approved (APPR)B Waiting on Materials (WMATL)C Waiting to be Scheduled (WSCH)D Waiting on Plant Condition (WPCOND)

单选题You are a security administrator for your company. The company has one main office and five branch offices. Network administrators work in the main office and each branch office.    Network administrators in the main office frequently create scripts that automate common  administrative tasks. You review each script to ensure it does not introduce security vulnerabilities. Scripts that do not introduce security vulnerabilities are considered approved. Occasionally, branch office administrators modify these scripts and distribute the modified scripts to other  branch office administrators. Branch office administrators often report that they accidentally run a modified version of a script.    You need to ensure that branch office administrators can verify which scripts are approved scripts.  What should you do?()A Maintain a list of the dates that the approved scripts were last modified. lnstruct branch office administrators to verifB Digitally sign All approved scripts. Instruct branch office administrators to verify the signature before using a script.C Distribute all approved scripts to branch office administrators in an e-mail message.D Place all approved scripts on a file server in the main office. Assign All branch office administrators only the Allow -the approved scripts. Instruct administrators to copy scripts from this file server.

单选题Where do you obtain approved placards containing instructions for the launching and inflation of an approved inflatable liferaft? ()AOfficer in Charge,Marine InspectionBThe manufacturer of the liferaftCMaritime AdministrationDThe owner of the vessel on which the liferafts are carried

单选题() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.AProcessBMilestoneCWorkDDeliverables

单选题All self-propelled vessels on an international voyage must be equipped with how many Emergency Position Indicating Radio beacons (EPIRB)? ()AOne approved Category 1 EPIRBBThree approved Category 1 EPIRBsCOne approved Class B EPIRBDTwo approved Class B EPIRBs

单选题All self-propelled vessels on an international voyage must be equipped with how many Emergency Position Indicating Radiobeacons (EPIRB)()?AOne approved Class A EPIRBBTwo approved Class A EPIRBsCOne approved Class B EPIRBsDTwo approved Class B EPIRBs

单选题The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing vessel consists of().Aone approved flotation cushion for each person on boardBone approved life preserver for each person on board and one life ringCone approved inflatable vest for each person on boardDlifeboat capacity equal to 1 1/2 times the number of persons on board

多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materials.BThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them

名词解释题中国药品通用名称(Chinese Approved Drug Names,CADN)