单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().Achemical and physical properties of the materialBname of the alternative standard or specificationCthe ASTM or ABS specification the material approximatesDmanufacturer or origin of the material

单选题
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
A

chemical and physical properties of the material

B

name of the alternative standard or specification

C

the ASTM or ABS specification the material approximates

D

manufacturer or origin of the material


参考解析

解析: 暂无解析

相关考题:

(c) State the specific inquiries you should make of Robson Construction Co’s management relevant to itsaccounting for construction contracts. (6 marks)

Of the following,______means the sufficiency of a vessel in materials,construction,equipment,crew,and outfit for the trade or service in which it is employed.A.ProficiencyB.SeaworthinessC.CargoworthinessD.Readiness

______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.A.chemical and physical properties of the materialB.name of the alternative standard or specificationC.the ASTM or ABS specification the material approximatesD.manufacturer or origin of the material

A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship

When patching holes in the hull of a ship,pillows,bedding,and other soft materials can be used as ______.A.caulkingB.gasketsC.strongbacksD.wedges

Which of the following materials is not appropriate for a teacher to use in listening practice?A.Materials with different dialects.B.Comprehensible authentic materials.C.Materials with comprehensible new words for students.D.Materials with contents beyond students’ comprehension capacity.

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materialsB、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materials.B、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them

单选题The construction portfolio may be included as part of the ship().Ageneral plansBoperating manualCbuilders documentationDCCS file

单选题Which one is not true?()ATwo main areas of skill are involved in the construction of shipBThere are distinct divisions in responsibilities between naval architects and marine engineersCEach ship will assume varying proportions according to its typeDShips can be divided into different categories from different perspectives

单选题According to Annex Ⅴ of MARPOL 73/78, the dunnage, lining and packing materials which will float can be discharged when the ship is more than()away from the nearest land.A3 n mileB5 n mileC12 n mileD25 n mile

单选题In ship construction,bulkheads in the quarters are generally().AstructuralBwatertightCnon-structuralDcontinuous

单选题A CO2 extinguisher on a ship which has lost 10% of its charge must be().Aused at the earliest opportunityBhydrotestedCrechargedDweighed again in one month

单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION

单选题A CO2 extinguisher on a ship which has lost 10% of its charge must be().Aused at the earliest opportunityBhydro-testedCrechargedDweighed again in one month

单选题There is implied term()the Charterer must act with reasonable dispatch and in accordance with the ordinary practice of the port in doing those acts which he must do to enable the vessel to become an arrived ship.AwhereBwhichCthatDwhether

单选题Which of the following shall not the officers in charge of the navigational watch do?()Acontinue to be responsible for the safe navigation of the shipBLeave the bridgeCKeep the watch on the bridgeDUse any available navigational aids necessary to ensure that the ship follows the planned course

单选题Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.AlashingBshiftingCliftingDtallying

单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.AINTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEBCARGO SHIP SAFETY CONSTRUCTION CERTIFICATECCARGO SHIP SAFETY EQUIPMENT CERTIFICATEDCARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

单选题By saying “raw materials do not exist, they are created” the author means _____.Athat there will be no more raw materials on the earth some time later, and man will have to create materials by themselvesBthat it is use that makes raw materials valuableCthat people have created various useful materials by using their intelligence and wisdomDhuman creativity is amazing

单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.Ahammering and jarringBvibration and poundingCvarying magnetic fieldsDstable or permanent magnetism of the ship

单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().Aareas where special materials are usedBhazardous areasClocation of emergency repair equipmentDtype and strength of materials used

单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge

多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materialsBThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them

多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materials.BThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them

单选题A record of the types and strengths of steels used on a ship must be included in the().Ageneral plansBbuilder's documentationCCertificate of InspectionDconstruction portfolio