单选题During the dock repair, should be measured firstly before tail shaft drawn out()Athe sinking of tail shaftBthe clearance of stern bearingCthe total flexure of shaftDmain engine crankshaft deflection

单选题
During the dock repair, should be measured firstly before tail shaft drawn out()
A

the sinking of tail shaft

B

the clearance of stern bearing

C

the total flexure of shaft

D

main engine crankshaft deflection


参考解析

解析: 暂无解析

相关考题:

Firstly, we should read the topic c and organize our ideas. 77.

Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair

If you are the observer about the class, before the observation, what should you do except________________. A.describe what you’ll be doing during the observationB.schedule a meeting to discuss the observationC.clarify the purpose of the observationD.it’is not necessary to meet with your colleague or TA to discuss

Repair of vital machinery and services on a ship should be accomplished ______.A.after control of fire, flooding, and structural repairsB.immediatelyC.after control of fire, but before control of floodingD.after stability is restored

View the Exhibit to examine the error during the database startup.You open an RMAN session for the database instance. To repair the failure, you executed the following as the first command in the RMAN session:RMAN REPAIR FAILURE;Which statement describes the consequence of the command?()A. The command performs the recovery and closes the failures.B. The command only displays the advice and the RMAN script required for repair.C. The command produces an error because the ADVISE FAILURE command has not been executed before the REPAIR FAILURE command.D. The command executes the RMAN script to repair the failure and removes the entry from the Automatic Diagnostic Repository (ADR).

What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.

During the dock repair,______should be measured firstly before tail shaft drawn out.A.the sinking of tail shaftB.the clearance of stern bearingC.the total flexure of shaftD.main engine crankshaft deflection

Which operating procedure(s)should be adhered to on a Ro-Ro vessel ________.A.One officer assigned to oversee the initial loading and lashingB.All lashings should be completed before leaving portC.Periodic inspection and retensioning of lashings during the voyageD.All of the above

Why should you soak an anchor ________.A.It can prevent the anchor from slipping during pretensioningB.It will lubricate all the moving parts of a stock anchorC.It will increase the maximum breaking strength of the anchor chainD.It will make it easier to disassemble the anchor for repair

What should be enabled before any user views can be created during role-based CLI configuration ?()A、aaa new-model commandB、secret password for the root userC、usernames and passwordsD、multiple privilege levels

Which of the following should be done before and after a service or repair is performed on a server?()A、 DefragB、 IPCONFIG /releaseC、 Firmware updateD、 Baseline

单选题During repair,lubrication lines and orifices must be ().Ataken awayBengagedCconnectedDsealed off

单选题The crankshaft deflection is at first to be () before and after repair.AdisassembledBrenewedCmeasuredDregulated

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the S.W valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题Which of the following items don’t belong to dock repair works?()Athe SW outboard valvesBthe tailshaft LO stop valveCthe drain valve of the boilerDpropeller shaft sealing device

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the SW valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题Shore power must be() during dock repair.AdisconnectedBswitched offCcut offDconnected

单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()Aigniting boilerBreleasing air in sea water systemCstarting generatorDcut off shore power

单选题Repair of vital machinery and services on a ship should be accomplished().Aafter control of fire,flooding,and structural repairsBimmediatelyCafter control of fire,but before control of floodingDafter stability is restored

单选题Inspection of a vessel’s propeller during dry-dock should include ()Anoting the condition of the fairwaterBinspection of the keywayClogging inspection results in the official deck logDall of above

单选题When is dock survey carried out?()ADuring annual repairBUsually during dock repairCBefore sea trialDAfter 5 years from last annual survey

单选题To ensure the quality of dock repair, C/E should know very well ()Athe repair standard of main docking repair itemBthe special tool for repair itemCthe skill of repairerDthe status of docking repair equipment

单选题Which of the following should be done before and after a service or repair is performed on a server?()A DefragB IPCONFIG /releaseC Firmware updateD Baseline

单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()Achief engineerBthe engineerCcaptainDany member of the engine department

单选题After an explosion,repair of emergency machinery and services should be accomplished().Aafter control of fire,flooding,and structural repairsBimmediately,before the emergency is under controlCafter control of fire,but before control of floodingDafter stability is restored

单选题During the deck repair,() should be measured firstly before tail shaft is drawn out.Athe sinking of tail shaftBthe clearance of stern bearingCthe total flexure of both end bearingDmain engine crankshaft deflection

单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()Achief engineerBsurveyorCthe engineerDthe technique personnel of the shipyard