单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()Achief engineerBsurveyorCthe engineerDthe technique personnel of the shipyard

单选题
During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()
A

chief engineer

B

surveyor

C

the engineer

D

the technique personnel of the shipyard


参考解析

解析: 暂无解析

相关考题:

Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair

They went to Japan (). Now they must be (). A、by sea, at seaB、by the sea, at the seaC、by the sea, at seaD、by sea, at the sea

What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.

During the dock repair,______should be measured firstly before tail shaft drawn out.A.the sinking of tail shaftB.the clearance of stern bearingC.the total flexure of shaftD.main engine crankshaft deflection

You should log all barometer readings taken at sea ______.A.regularlyB.at least once during each watchC.more often under changeable weather conditionsD.All of the above

Which statement concerning GMDSS Radio Operator requirements is FALSE ________.A.Each compulsory vessel must carry at least two licensed GMDSS Radio Operators at all times while at seaB.Each compulsory vessel must carry at least two licensed Radio Operators at all times while at sea and may elect to carry a GMDSS Radio Maintainer as wellC.Communications involving safety of life at sea do not have to be logged as long as the compulsory vessel was not involved in such communicationsD.While at sea,adjustments to,and the maintaining of,GMDSS equipment may be performed by the GMDSS Radio operator as long as the work is supervised by an onboard licensed GMDSS Radio Maintainer

单选题Each inert gas system gas main must have an automatic shut down valve at the outlet of the gas production plant. This valve must close automatically upon().Acargo pump failureBblower failureCdeck seal low water levelDlow inert gas temperature

单选题The rate of cylinder lubricating oil metered to each cylinder of a large low-speed main propulsion diesel engine is ()Athe same, whether at sea, or during maneuveringBadjusted during each hour of operation while at constant RPMChigher at sea than while maneuveringDlower at sea than while maneuvering

单选题During repair,lubrication lines and orifices must be ().Ataken awayBengagedCconnectedDsealed off

单选题Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()AOpen the intake valve to an adjacent tankBSet out drip pans and sawdust and begin to mop up the spillCSignal the shore control point to shut downDClose the valve on the tank vent line

单选题During the dock repair, should be measured firstly before tail shaft drawn out()Athe sinking of tail shaftBthe clearance of stern bearingCthe total flexure of shaftDmain engine crankshaft deflection

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the S.W valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题Which of the following items don’t belong to dock repair works?()Athe SW outboard valvesBthe tailshaft LO stop valveCthe drain valve of the boilerDpropeller shaft sealing device

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the SW valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题If your bridge-to-bridge radiotelephone ceases to operate,you must().Aimmediately anchor your vessel and arrange for repairs to the systemBmoor your vessel at the nearest dock available and arrange for repairs to the systemCarrange for the repair of the system to be completed within 48 hoursDexercise due diligence to restore the system at the earliest practicable time

单选题Shore power must be() during dock repair.AdisconnectedBswitched offCcut offDconnected

单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()Aigniting boilerBreleasing air in sea water systemCstarting generatorDcut off shore power

单选题During the fuel injection period, fuel pressure must exceed cylinder gas pressure to ().Aensure penetration and distribution of the fuel in the combustion chamberBensure the needle valve is flushed clean during each injectionCprevent combustion gas blowback into the open needle valveDprevent reflected pressure waves when the needle valve closes

单选题When fire pumps are used for other than firefighting service,each pipe connecting the other service (except for branch lines used for deck washing) must have a().Acheck valve installed in the lineBshut off valve at a manifold near the pumpCquick disconnect union within ten feet of the pumpDregulator in the line set at 125 psi

单选题What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()AWhich survival craft was used in the drillBThe number of each lifeboat not lowered during each drillCOnly the number of each motor propelled lifeboat that is loweredDThe length of time an oar propelled lifeboat is rowed

单选题When ship in the dock repairing, engine department should emphasize on the inspection of()Asea valve chest, sect valve, thrusterBbilge motherboard, steering and the shaft systemCsea water systemDfresh water system

单选题When is dock survey carried out?()ADuring annual repairBUsually during dock repairCBefore sea trialDAfter 5 years from last annual survey

单选题Now that the valve is not worth (), I suggest it ().Ato repair;to renewBrepairing;be renewedCrepairing;will be renewedDto repair;to be renewed

单选题Where tanks are arranged for either oil or ballast () must be fitted in the pipe so that only the ballast main or the oil transfer main connected to the tank.Aa sea water chestBa change-over chestCa buffer tankDa three-way valve

单选题To ensure the quality of dock repair, C/E should know very well ()Athe repair standard of main docking repair itemBthe special tool for repair itemCthe skill of repairerDthe status of docking repair equipment

单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()Achief engineerBthe engineerCcaptainDany member of the engine department

单选题Which of the following precautions should always be carried out in dry dock?()ALiquids should never be transferred between tanks without consulting the dock masterBIf sea valves have been disassembled, all bonnets must be checked for leakage when the ship is re-floatedCBefore re-floating, all sea chest strainers should be verified as having been replacedDAll of the above