单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()Achief engineerBthe engineerCcaptainDany member of the engine department

单选题
During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()
A

chief engineer

B

the engineer

C

captain

D

any member of the engine department


参考解析

解析: 暂无解析

相关考题:

Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair

What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.

During the dock repair,______should be measured firstly before tail shaft drawn out.A.the sinking of tail shaftB.the clearance of stern bearingC.the total flexure of shaftD.main engine crankshaft deflection

When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB.The stern bearing alignment with the stern frame should be checkedC.The interior of the stern tube should be inspected for leaksD.The shaft liner should be removed and inspected for cracks

When is it necessary for a TDA to be conducted on an installed IBM DS8800? () A. when installing SSD drivesB. when adding a new workloadC. when installing SATA drivesD. when adding more Linux hosts

A wobbling tail shaft is an indication of ______.A.shallow waterB.an engine that is misfiringC.a tight tail shaft glandD.worn stern bearing or misalignment

起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.

When is it necessary for a TDA to be conducted on an installed IBM DS8800? ()A、when installing SSD drivesB、when adding a new workloadC、when installing SATA drivesD、when adding more Linux hosts

When installing a cisco wcs,which two ports can be changed during installation?()A、httpsB、tftpC、rmiD、httpE、ftp

单选题Which of the following nondestructive testing methods can be used to detect a suspected subsurface defect in a tail-shaft liner?()ADye penetrantBMagnetic particleCUltrasonicDAll of the above

多选题When installing a cisco wcs,which two ports can be changed during installation?()AhttpsBtftpCrmiDhttpEftp

单选题During the dock repair, should be measured firstly before tail shaft drawn out()Athe sinking of tail shaftBthe clearance of stern bearingCthe total flexure of shaftDmain engine crankshaft deflection

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the S.W valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题Which of the following items don’t belong to dock repair works?()Athe SW outboard valvesBthe tailshaft LO stop valveCthe drain valve of the boilerDpropeller shaft sealing device

单选题Which of the following items don’t belong to dock repair works?()Amaking the repair list, booking spare parts and special tools for the dock repairBshutting off all of the SW valves to outboardCthe sketches or diagrams used for the dock repairDcleaning up the oil tank and boiler before enter the dock

单选题When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()AThe propeller hub taper and shaft keyway should be inspected for cracks or corrosionBThe stern bearing alignment with the stern frame should be checkedCThe interior of the stern tube should be inspected for leaksDThe shaft liner should be removed and inspected

单选题Shore power must be() during dock repair.AdisconnectedBswitched offCcut offDconnected

单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()Aigniting boilerBreleasing air in sea water systemCstarting generatorDcut off shore power

单选题A vessel has been equipped with an oil lubricated stern bearing and is undergoing a routine dry-dock.Which of the following inspection should be made when the tail-shaft has been drawn?()AThe overall condition of the bearing surface should be examinedBThe shaft liner should be inspected for cracks and tested to insure a tight fitCThe stern tube should be tested for cracks with dye penetrantDall of above

单选题When ship in the dock repairing, engine department should emphasize on the inspection of()Asea valve chest, sect valve, thrusterBbilge motherboard, steering and the shaft systemCsea water systemDfresh water system

单选题When is dock survey carried out?()ADuring annual repairBUsually during dock repairCBefore sea trialDAfter 5 years from last annual survey

单选题To ensure the quality of dock repair, C/E should know very well ()Athe repair standard of main docking repair itemBthe special tool for repair itemCthe skill of repairerDthe status of docking repair equipment

单选题When installing the CRS software on two or more nodes in the same cluster, how do you know it is safe to start installing the next node? ()AWait until the node is completely installed to start installation on the next one. BAfter you insert Disk 2. CA dialog box, It is now safe to start installing the next node, appears during the installation. DAfter Windows OS is installed on the first node.

单选题A wobbling tail shaft is an indication of().Ashallow waterBan engine that is misfiringCa tight tail shaft glandDworn stern bearing or misalignment

单选题Which of the following actions should be taken if during a routine maintenance inspection of a centrifugal pump, localized scoring on a pump shaft sleeve is detected?()ACorrect the cause of the scoring and repair the sleeve or replace with a new oneBReassemble the unit and provide more water leak off for proper lubricationCCheck for parallel alignment of the sleeve radial faces to the sleeve boresDReassemble the unit and adjust the governor to obtain a slower speed

单选题During the deck repair,() should be measured firstly before tail shaft is drawn out.Athe sinking of tail shaftBthe clearance of stern bearingCthe total flexure of both end bearingDmain engine crankshaft deflection

单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()Achief engineerBsurveyorCthe engineerDthe technique personnel of the shipyard