SK0-002 题目列表
单选题The last deliverable at the Close Out meeting is:()Asource code.Bpasswords.Clessons learned.Dtest results.
单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()Aby written and oral communication.Bvia a weekly status report.Cthrough the formal chain of command.Dwith approved template forms.
单选题Which RAID standard combines data striping across drives with mirroring?()A RAID 0+1B RAID 1+5C RAID 3D Hybrid RAID 5+
单选题Why does a project manager need an executive sponsor?()ATo keep the project team focused on its workBTo provide behind-the-scenes assistance with organizational commitment and supportCTo sign-off on user requirementsDTo negotiate contracts with outside vendors
单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()A replace the NICB install the latest SSU (System Setup Utility) versionC upgrade the firmware on the NICD assign the NIC a static IRQ in the SSU (System Setup Utility)
单选题What is a reason for reviewing the user requirements document with the client?()ATo gain the client’s acceptance of the detailed designBTo verify mutual understanding of project resourcesCTo verify mutual understanding of the detailed project planDTo verify mutual understanding of targeted product performanceETo verify mutual understanding of the tests that will be done after the product is completed
单选题Who is responsible for authorizing closure of the project?()AProject ManagerBStakeholderCCustomerDExecutive Sponsor
单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()AHistorical informationBUse of outside vendorsCChange control processesDHuman resource skill level requirements
多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()AAdapter teaming is designed to work with switches.BAdapter teaming only functions with gigabit network cards.CAdapter teaming only provides fault tolerance, not additional bandwidth.DAdapter teaming only works with IPX when using switches and network cards with special features that support teaming.
单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()ADeveloping key personnelBLeading technical specialistsCInterfacing with customers / sponsorsDAnalyzing skills
单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()A The memory is not seated correctly.B The network card is not configured correctly.C The server does not support 1024 MB of memory.D Master SDRAM ECC needs to be enabled in the CMOS.
单选题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()A multiple AIT (Advanced Intelligent Tape) drives configured for each serverB a standalone LTO (Linear Tape-Open) drive configured for all serversC standalone DAT (Digital Audio Tape) drives configured for each serverD a tape library unit with more then one DAT (Digital Audio Tape) drive configured for all serversE a tape library unit with more the one SDLT (SuperDLT) drive configured for all servers
单选题Why is it important to have a final meeting on a project that has been cancelled?()ADocument lessons learnedBAssign responsibilityCClose budgetDBegin new project
单选题Which type of server is responsible for resolving NetBIOS names?()A mail serverB DNS serverC web serverD WINS serverE DHCP server