单选题What is a reason for reviewing the user requirements document with the client?()ATo gain the client’s acceptance of the detailed designBTo verify mutual understanding of project resourcesCTo verify mutual understanding of the detailed project planDTo verify mutual understanding of targeted product performanceETo verify mutual understanding of the tests that will be done after the product is completed
单选题
What is a reason for reviewing the user requirements document with the client?()
A
To gain the client’s acceptance of the detailed design
B
To verify mutual understanding of project resources
C
To verify mutual understanding of the detailed project plan
D
To verify mutual understanding of targeted product performance
E
To verify mutual understanding of the tests that will be done after the product is completed
参考解析
解析:
暂无解析
相关考题:
单选题Who is responsible for authorizing closure of the project?()AProject ManagerBStakeholderCCustomerDExecutive Sponsor
单选题Acceptance of deliverables to multiple locations requires which type of sign off?()ADesign AcceptanceBCode AcceptanceCModule AcceptanceDSite Acceptance
单选题Which RAID standard combines data striping across drives with mirroring?()A RAID 0+1B RAID 1+5C RAID 3D Hybrid RAID 5+
单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()A SE (Single Ended)B DE (Double Ended)C LVD (Low Voltage Differential)D HVD (High Voltage Differential)
单选题After upgrading the SNMP (Simple Network Management Protocol) protocol, the ()can be looked up. It is a sequence of integers that uniquely identifies a path to a managed object.A MIB (Management Information Base)B OID (ObjectIDentifier)C registerD community name
单选题Why is it important to have a final meeting on a project that has been cancelled?()ADocument lessons learnedBAssign responsibilityCClose budgetDBegin new project