判断题组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。A对B错

判断题
组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。
A

B


参考解析

解析: 暂无解析

相关考题:

The work breakdown structure (WBS) is first developed in which scope management process?A . InitiationB . Scope planningC . Scope change controlD . Scope DefinitionE . Scope verification

When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at theA.taskB.level of effortC.sub-taskD.projectE.work package

63 When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at theA. taskB. level of effortC. sub-taskD. projectE. work package

141 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. Scope DefinitionE. Scope verification

23 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. ScopeDefinitionE. Scope verification

● When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at theA taskB level of effortC sub-taskD projectE work package

● The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?A Time, schedule and cost.B Management coordination and organization structuring.C Work methods and accountability.D Quality of work.E Risk and impact decision-making.

● 在项目人力资源计划编制中,一般会涉及到组织结构图和职位描述。其中,根据组织现有的部门、单位或团队进行分解,把工作包和项目的活动列在负责的部门下面的图采用的是(47) 。(47)A.工作分解结构(WBS)B.组织分解结构(OBS)C.资源分解结构(RBS)D.责任分配矩阵(RAM)

● ()提供项目组织安排的层次化的有组织的描述,使得工作包同组织执行单元相关联,用于显示各个工作元素被分配到哪个组织单元。()A.工作分解结构(WBS) B.物料清单(BOM) C.风险分解结构(RBS) D.组织分解结构(OBS)

A project management technique that is currently in widespread use is the (73). The purpose of this technique is to detail, in hierarchical fashion, all of the activities that are required to meet project objectives.A.Structure ChartB.Organizational StructureC.Work Breakdown StructureD.Functional decomposition diagram

一般情况下,是将估算费用按项目的工作分解结构WBS和项目团队的组织分解结构OBS分解,形成便于在项目执行过程中进行费用控制的()。A费用甘特图B费用矩阵C费用需求表D费用分解结构CBS

The work breakdown structure (WBS) has been widely used in management for software development project, ( ) is generally NOT validated through the WBS.A.Schedule and costB.Organization structuringC.Management coordinationD.Quality of work

一个组织中有很多类型的分解结构,项目组在分解WBS时,( )可以帮助项目组考虑并确定所分解的工作包由哪些成员来执行。A.组织分解结构(OBS)B.物料清单(BOM)C.风险分解结构(RBS)D.过程分解结构(PBS)

当一个项目使用组织分解结构OBS时它通常在什么方面与WBS保持一致 ( )A.任务B.劳动水平C.子任务D.项目E.工作包

A schedule is commonly used in project planning and project portfolio management. ( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.时间表常用于项目规划和项目组合管理。时间表的元素与工作分解结构(WBS)的最终元素( ),工作说明书,或合同数据需求清单密切相关。A.Essences精髓B.Elements元素C.Purposes目的D.Issues问题

A project management technique that is currently in widespread use is the ( ) . The purpose of this technique is to detail, in hierarchical fashion, all of the activities that are required to meet project objectives.A.Functional decomposition diagramB.Work Breakdown StructureC.Structure ChartD.Organizational Structure

The creation of a work breakdown structure(WBS)is the process of ( ) the major project deliverables. A.subdividing B.assessing C.planning D.integrating

为了把一个大的项目分解成多个较小的,更易于管理的项目,黑带此时应该选择以下哪个工具:()。A、结构分析图B、流程图C、WBS(Work Breakdown Structure)D、AND(Activity Network Diagram)

组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。

任何两个分解结构结合在一起,都可以形成一个矩阵,下列说法正确的是()A、WBS和OBS形成帐户代码B、OBS和ABS形成费用估算表C、WBS和CBS形成责任矩阵D、WBS、PBS和OBS构成费用控制立方体

WBS、PBS与OBS合在一起,就提供了费用估算的结构。WBS、OBS形成()A、责任矩阵B、帐户代码C、费用估算表D、控制立方体

我们常说的项目责任矩阵是()A、WBS—RBSB、WBS—OBSC、WBS—CBSD、OBS—ABS

关于WBS的解释正确的是()A、组织分解机构B、工作分解结构C、资源分解结构D、项目分解结构

在项目实施期间的周会上,项目经理向项目群经理提交一份更新后的部门资源开支报告。下列哪项可以帮助项目经理获得这个信息?()A、责任分配矩阵(RAM)B、组织分解结构(OBS)C、工作分解结构(WBS)D、资源分解结构(RBS)

The SOW (Statement of Work) is another name for the:()A、WBS (Work Breakdown Structure).B、cost benefit analysis.C、requirements specifications.D、narrative description of the work to be accomplished.

单选题The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.AsubdividingBassessingCplanningDintegrating

单选题在项目实施期间的周会上,项目经理向项目群经理提交一份更新后的部门资源开支报告。下列哪项可以帮助项目经理获得这个信息?()A责任分配矩阵(RAM)B组织分解结构(OBS)C工作分解结构(WBS)D资源分解结构(RBS)

判断题组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。A对B错