141 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. Scope DefinitionE. Scope verification

141 The work breakdown structure (WBS) is first developed in which scope management process? A. Initiation

B. Scope planning

C. Scope change control

D. Scope Definition

E. Scope verification


相关考题:

Things made of glass, plastic and tin are ______ hard ______ break down. A.very, toB.too, as toC.too, toD.so, to

The film in my camera is finisheD.I need to get it _____. A.cutB.cleaningD.to testD.developed

A) outsetB) outbreakC) breakthroughD) breakdown

Refer to Topic TestKing.com in iPAD document.What happens to the network when TestKingX is reconnected and a trunk exists between the two switches?() A. All VLANs except the default VLAN will be removed from all switches.B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.

The political situation in the region has deteriorated rapidly.A: improvedB: changedC: worsenedD:developed

Many forms of cancer can be cured if detected early.A:discoveredB:selectedC:operatedD:developed

He advanced a novel theory during the seminar.A:moved B:inventedC:furnished D:developed

One-room schoolhouse can still be found in isolated areas of North America.A:bareB:deprivedC:remoteD:developed

()is a document?generated by the?creating?WBS?process?that?support the WBS,which provides?more?detailed?descriptions?of the components in the?WBS.A.The project?charterB.The?project?scope statementC.The?WBS dictionaryD.The?activity list

文化产业项目工作分解结构(work_breakdown_structure,WBS)是文化产业项目范围定义中给出的项目工作范围的描述文件。