单选题吊杆停用时,稳索必须要收起来。()AWhen the derrick is stopped, the guy must be stowed.BWhen the derrick is stopped, the guy must be topped.CWhen the derrick is stopped, the guy must be lowered.DWhen the guy is stopped, the derrick must be stowed.
单选题
吊杆停用时,稳索必须要收起来。()
A
When the derrick is stopped, the guy must be stowed.
B
When the derrick is stopped, the guy must be topped.
C
When the derrick is stopped, the guy must be lowered.
D
When the guy is stopped, the derrick must be stowed.
参考解析
解析:
暂无解析
相关考题:
The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts
起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.
When the derrick is topped, the guy must be ()(放松).A、slacked offB、sent awayC、sent outD、taken in
The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A、吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B、吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C、吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D、吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。
Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.A、blocksB、goosenecksC、tackleD、guys
吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.
不要随意地移动稳索。()A、Don’t shift the guy as you like.B、Don’t shift the stay as you like.C、Don’t move the derrick as you like.D、Don’t move the crane as you like.
单选题The preventer guy,as used on a conventional yard and stay rig,().Ais rigged at an angle of 70°to 90°from the guy it assistsBtakes the strain imposed on the schooner guy when burtoning cargoCis rigged when lifting cargo that exceeds the SWL of a single whipDshould take the strain if the regular guy parts
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space
单选题The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。
单选题When the derrick changes its ()(角度), its lifting capacity changes correspondingly.AangelBlengthCheightDangle
单选题Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.AblocksBgoosenecksCtackleDguys
单选题不要随意地移动稳索。()ADon’t shift the guy as you like.BDon’t shift the stay as you like.CDon’t move the derrick as you like.DDon’t move the crane as you like.
单选题When the derrick is stopped, the guy must be ()(收好).Ataken inBslacked offCadjustedDstowed