When the derrick is topped, the guys must be ().A、slacked offB、send awayC、taken inD、send out
When the derrick is topped, the guys must be ().
- A、slacked off
- B、send away
- C、taken in
- D、send out
相关考题:
When the inert gas pressure is being ______ in the cargo tanks,particular attention should be paid to obtaining an oxygen concentration.A.topped upB.bracedC.tommed downD.shored
The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe
起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.
把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.
请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.
单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().AstringBstandCjointDstandpipe
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space
单选题When the derrick changes its ()(角度), its lifting capacity changes correspondingly.AangelBlengthCheightDangle
单选题请调高一下吊杆。()ALower the derrick, please.BTop the derrick, please.CSwing the derrick, please.DAdjust the derrick, please.
单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().AlengthBslackCheightDrotation direction
单选题The most critical part of the bunkering operations, which can result in an oil spill, is when the ()Ahose joints are made upBtanks are being topped offCsystem is being lined upDpumping operation is first started
单选题Which statement is FALSE concerning precautions during fueling operations?()AAll engines,motors,fans,etc. should be shut down when fuelingBAll windows,doors,hatches,etc. should be closedCA fire extinguisher should be kept nearbyDFuel tanks should be topped off with no room for expansion
单选题吊杆停用时,稳索必须要收起来。()AWhen the derrick is stopped, the guy must be stowed.BWhen the derrick is stopped, the guy must be topped.CWhen the derrick is stopped, the guy must be lowered.DWhen the guy is stopped, the derrick must be stowed.