单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space
单选题
When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().
A
dock
B
hold
C
pedestal
D
machinery space
参考解析
解析:
暂无解析
相关考题:
Terri: Derrick, don't you think you should take a vacation? Even one or two days would be fine.Derrick:__________ There's too much work.A. I think so.B. No way.C. Count on me.D. You don't know.
The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe
把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.
请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
The()(千斤索) is a wire used to take the weight off.A、light derrickB、union purchaseC、topping liftD、heavy derrick
This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.
You can swing the derrick to starboard side or port side. But do not exceed ()for the union purchase.A、120°B、90°C、60°D、100°
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
单选题You can swing the derrick to starboard side or port side. But do not exceed ()for the union purchase.A120°B90°C60°D100°
单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.
单选题The net productivity per gang-hour can be improved through a decrease of().ACranes/derricksBCrane/derrick cyclesCCrane/derrick cycle timeDWeight per package
单选题() can be operated independently or locked together and operated as a twin-job cranes of double capacity.ATwo derricksBA derrick and a craneCTwo cranesDA crane and a winch
单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().AstringBstandCjointDstandpipe
单选题When the derrick changes its ()(角度), its lifting capacity changes correspondingly.AangelBlengthCheightDangle
单选题请调高一下吊杆。()ALower the derrick, please.BTop the derrick, please.CSwing the derrick, please.DAdjust the derrick, please.
单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().AlengthBslackCheightDrotation direction
单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).AA capstanBA holdCA warp endDA mooring drum
单选题Be careful when you ()the derrick.AoperatedBoperateCoperatingDoperator