单选题Please take soundings of ().Achain lockersBbridge deckCbilge waterDhawse pipe

单选题
Please take soundings of ().
A

chain lockers

B

bridge deck

C

bilge water

D

hawse pipe


参考解析

解析: 暂无解析

相关考题:

The road __________ when you get to the bridge. Please take the right one, which will lead you to the university directly. A.branchesB.turnsC.takes awayD.intersects

How many ______ can I take?A、riceB、cakesC、waterD、coffee

The soundings on the chart are based on the depth of water available at ______.A.mean low waterB.mean lower low waterC.mean high waterD.mean high water springs

During the towing of a survival craft,a lookout should be on station to ______.A.release the towline in an emergencyB.help the helmsman steerC.look for food and waterD.check the water level in the bilge

The opening in the deck beneath the anchor windlass that leads to the chain locker is the ______.A.Hawse pipeB.Fall pipeC.Drop-pipeD.Spill pipe

Bilge soundings indicate ______.A.the amount of condensation in the holdB.whether the cargo is leaking or notC.whether the vessel is taking on waterD.All of the above

Is this a ()(淡水) tank?A、bilge waterB、ballast waterC、fresh waterD、sea water

Lower the anchor until it is clear of ()(锚链筒).A、chain lockerB、hawse pipeC、windlassD、anchor chain

It is a ()(压载水) tank.A、bilge waterB、ballast waterC、fresh waterD、sea water

驾驶台甲板()A、compass deckB、main deckC、bridge deckD、lower deck

露天甲板()A、main deckB、weather deckC、lower deckD、bridge deck

On receiving the order “Lower away”, lower the anchor() it is clear of the hawse pipe.A、untilB、tillC、asD、when

Clean the ()(锚链管)!A、spurling pipeB、hose pipeC、hawse pipeD、rope pipe

起居甲板()A、accommodation deckB、bridge deckC、main deckD、lower deck

污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

First,clean the ()(锚链舱)!A、chain pipeB、chain lockerC、hawse pipeD、anchor

Deck officers work on the ()(驾驶台甲板).A、bridge deckB、main deckC、compass deckD、weather deck

Please take soundings of ().A、chain lockersB、bridge deckC、bilge waterD、hawse pipe

压载水()A、sea waterB、bilge waterC、fresh waterD、ballast water

葫芦吊()A、derrickB、chainC、chain blockD、bridge

单选题Bilge soundings indicate().Athe amount of condensation in the holdBwhether the cargo is leaking or notCwhether the vessel is taking on waterDAll of the above

单选题The purpose of the stripping bar on an anchor windlass is to().Aclean off any mud that may have accumulated on the chainBengage or disengage the wildcatCfairlead the chain from the hawse pipe to the wildcatDprevent the chain from fouling the wildcat

单选题The opening in the deck beneath the anchor windlass that leads to the chain locker is the().Ahawse pipeBfall pipeCdrop-pipeDspill pipe

单选题A tool consisting of a handle and releasable chain used for turning pipe or fittings of a diameter larger than that which a pipe wrench would fit is called().Abreakout wrenchBmakeup tongsCchain tongsDpipe spinner

单选题When installed for bilge pumping or ballast duty, centrifugal pumps require a () to remove air from the suction pipe.Aair chamberBhead lankCprimerDprime mover

单选题What is a spill pipe?()AA drainage pipe that carries rain or spray from an upper deck to a lower deckBA pipe under the anchor windlass leading to the chain lockerCA chute,usually over the stern,to lead dumped garbage clear of the hullDAn opening in the deck leading outside the hull

单选题On receiving the order “Lower away”, lower the anchor() it is clear of the hawse pipe.AuntilBtillCasDwhen