First,clean the ()(锚链舱)!A、chain pipeB、chain lockerC、hawse pipeD、anchor

First,clean the ()(锚链舱)!

  • A、chain pipe
  • B、chain locker
  • C、hawse pipe
  • D、anchor

相关考题:

A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection

A sufficient amount of chain must be veered when anchoring a vessel to ensure ______.A.the vessel has enough room to swing while at anchorB.the anchor flukes bite into the ocean bottomC.there is a sufficient scope of chain to keep the anchor on the bottomD.there is more chain out than there is in the chain locker

The length of chain between the anchor and the end of the pendant line is called the ______.A.Pigtail chainB.Thrash chainC.Crown chainD.Wear chain

Prior to magnetic particle inspection of anchor chain,the chain should be ______.A.DegaussedB.DemagnetizedC.SoakedD.Sandblasted

The opening in the deck beneath the anchor windlass that leads to the chain locker is the ______.A.Hawse pipeB.Fall pipeC.Drop-pipeD.Spill pipe

In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.A.increase fatigue life of the systemB.reduce the time to retrieve the lineC.increase the holding powerD.reduce the catenary

Lower the anchor until it is clear of ()(锚链筒).A、chain lockerB、hawse pipeC、windlassD、anchor chain

In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack

Clean the ()(锚链管)!A、spurling pipeB、hose pipeC、hawse pipeD、rope pipe

Please take soundings of ().A、chain lockersB、bridge deckC、bilge waterD、hawse pipe

Which statement is true about a Dynamic Chain Selection Module instance?()A、It is the first module in the partner module chain in Web Services Security Management (WSSM).B、It is the last module in the partner module chain in WSSM.C、It is the first module in the application module chain for partner.D、It is the last module in the application module chain for the partner.

单选题Which statement is true about a Dynamic Chain Selection Module instance?()AIt is the first module in the partner module chain in Web Services Security Management (WSSM).BIt is the last module in the partner module chain in WSSM.CIt is the first module in the application module chain for partner.DIt is the last module in the application module chain for the partner.

单选题A permanent chain chasing system is used to().Aclean anchor chain as it's hauled inBrecover anchors which have lost their buoysCrun and retrieve anchorsDprepare anchor chain for inspection

单选题What does the proof test load of an anchor chain demonstrate?()ABreaking strength of the chainBStrength of the chain to a specified limitCAdequate holding power for new bottom conditionsDSafe working load of the chain

单选题Prior to magnetic particle inspection of anchor chain,the chain should be().AdegaussedBdemagnetizedCsoakedDsandblasted

单选题The holding power of an anchor increases when the().Aamount of chain lying along the bottom increasesBlength of the catenary is reducedCmooring line tension is increasedDamount of chain lying along the bottom decreases

单选题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().Aincrease fatigue life of the systemBreduce the time to retrieve the lineCincrease the holding powerDreduce the catenary

单选题First,clean the ()(锚链舱)!Achain pipeBchain lockerChawse pipeDanchor

单选题The purpose of the stripping bar on an anchor windlass is to().Aclean off any mud that may have accumulated on the chainBengage or disengage the wildcatCfairlead the chain from the hawse pipe to the wildcatDprevent the chain from fouling the wildcat

单选题After deploying the anchor,a permanent chain chaser is().Aremoved from the anchor chainBconnected to a buoy at the anchorCstripped back to the rig and securedDconnected to a buoy halfway down the chain

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is sufficient weight from the anchor and chain to prevent draggingDthere is more chain out than there is in the chain locker

单选题Lower the anchor until it is clear of ()(锚链筒).Achain lockerBhawse pipeCwindlassDanchor chain

单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()AOne shot of chain for every ten feet of waterBOne shot of chain for every fifteen feet of waterCOne shot of chain for every thirty feet of waterDOne shot of chain for every ninety feet of water

单选题The length of chain between the anchor and the end of the pendant line is called the().Apigtail chainBthrash chainCcrown chainDwear chain

单选题Your vessel is anchored in an open roadstead with three shots of chain out on the port anchor.The wind freshens considerably and the anchor begins to drag.Which action should you take FIRST().ADrop the starboard anchor short with about one shot of chainBSheer out to starboard using the rudder,then drop the starboard anchor with about four shots of chainCPut the engines slow ahead to help the anchorDVeer out more chain on the port anchor

单选题In anchor orders, “Up and down” means “()”.AThe chain is not uprightBThe chain is uprightCThe chain is slackDThe chain is not slack

单选题The part of the anchor windlass that engages the anchor chain for lifting is called the ().Awarping headBfairleadCwildcatDcapstan