单选题Bilge soundings indicate().Athe amount of condensation in the holdBwhether the cargo is leaking or notCwhether the vessel is taking on waterDAll of the above

单选题
Bilge soundings indicate().
A

the amount of condensation in the hold

B

whether the cargo is leaking or not

C

whether the vessel is taking on water

D

All of the above


参考解析

解析: 暂无解析

相关考题:

What can be used to cover bilge before loading?

()must be familiar with these requirements of bilge water management, particularly those directly involved with such operations involving bilge water. A.All responsible personnelB.All the crew served in engine roomC.The masterD.The chief engineer

Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve

explain bilge and ballast pumping through ejector ?

Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo

Bilge soundings indicate ______.A.the amount of condensation in the holdB.whether the cargo is leaking or notC.whether the vessel is taking on waterD.All of the above

In what units are heights and soundings in the chart? They are in ______.A.meters and fathomsB.fathoms and metersC.meter and fathomD.fathom and meter

污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

Please take soundings of ().A、chain lockersB、bridge deckC、bilge waterD、hawse pipe

LTE中级,上行的导频信号包括DMRS和Soundings RS。

单选题The heights and soundings of Admiralty chart are expressed()in Fathoms()in Meters.Aeither,orBneither,norCanother,norDother,or

单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()AOpen the bilge pump for inspectionBRemove each of the manifold valvesCRemove only the manifold valve to the affected bilge-wellDAttempt to pump out another bilge well to determine if the entire system is affected

单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.AdependentBin dependentCin seriesDin parallel

单选题Before loading bulk grain,bilge wells must be covered to().Aadd strength to the bilge well strainerBpermit rapid flow of water to the bilge wellsCprevent cargo sifting into the bilge wellsDprevent oil,water,or other liquid from reaching the cargo

单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().Astop-check valves installed in the bilge manifoldsBusing a positive displacement reciprocating bilge pumpCinstalling eductors in all bilge rose boxesDinstalling a swing check before each bilge valve

单选题Please take soundings of ().Achain lockersBbridge deckCbilge waterDhawse pipe

判断题LTE中级,上行的导频信号包括DMRS和Soundings RS。A对B错

单选题The emergency bilge suction or bilge () is used to prevent flooding of the ship.Ainjection valveBrelief valveCdischarge valveDinlet filter

单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.AproceedingBoverloadingCcollisionDflooding

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of emergency generatorBinsulation of piping including exhaust pipes in engine room contaminated by oilCimproper operation of bilge of bilge of bilge pumping arrangementsDdamaged sanitary pump

单选题An oil water monitor is required in order to measure ().Athe oil content in waterBthe water content in fuel oilCthe water level in bilge wellDthe oil level in bilge well

单选题The soundings on the chart are based on the depth of water available at ().Amean low waterBmean lower low waterCmean high waterDmean high water springs

单选题If one of the bilge system manifold valves does not properly seat, the ()Abilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedBbilge system will lose vacuum and prevent the other bilges from being pumped outCbilge well aft connected to that valve will siphon its contents to the forward bilge wellsDdischarge pressure will be too high

单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()ASend the wiper into the well with only a scoop and pailBRemove the bilge manifold valve and attempt to back flush the lineCSimultaneously operate all available bilge pumpsDIt is only necessary to transfer half the contents of a drum of degreaser into the bilge well

单选题When discharging bilge water, which criteria must be observed?()AThe requirement for the oil content of bilge water discharged is 15 ppmBNo discharge in sensitive watersCAny discharge in sensitive watersDInternational, national or local requirements have to be observed

单选题If water is rising in the bilge of a lifeboat,you should FIRST().Aabandon the survival craftBcheck for cracks in the hullCshift all personnel to the sternDcheck the bilge drain plug

单选题The soundings on the imperial chart are measured in().AFeetBYardsCFathomsDMeters