单选题When the derrick is stopped, the guy must be ()(收好).Ataken inBslacked offCadjustedDstowed

单选题
When the derrick is stopped, the guy must be ()(收好).
A

taken in

B

slacked off

C

adjusted

D

stowed


参考解析

解析: 暂无解析

相关考题:

He stopped () TV when dinner was ready. A、watchingB、to watchC、watch

They stopped () when it rained. A、playingB、playC、played

He stopped_____ homework when dinner was ready.A. to doB. doC. doing

The girl stopped ___________ when her mum came in.A. cryingB. to cryC. cry

In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point ______.A.Abreast the heelB.At right angles to the boom when viewed from aboveC.Aft of the heelD.Forward of the spiderband

The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts

起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.

The ()(吊杆托架) supports the derrick.A、derrick boom restB、derrick headC、derrick mastD、derrick guy

When I ()(发现他骗我) I stopped buying thins there and started dealing with another shop.

Could you show me ()to operate the derrick?A、whichB、whatC、howD、when

Release the ()(制动器)when letting go the anchor.A、stopperB、brakeC、lockerD、derrick

吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.

When the derrick is topped, the guys must be ().A、slacked offB、send awayC、taken inD、send out

不要随意地移动稳索。()A、Don’t shift the guy as you like.B、Don’t shift the stay as you like.C、Don’t move the derrick as you like.D、Don’t move the crane as you like.

单选题When the derrick is topped, the guy must be ()(放松).Aslacked offBsent awayCsent outDtaken in

单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space

单选题When the derrick changes its ()(角度), its lifting capacity changes correspondingly.AangelBlengthCheightDangle

单选题When the derrick is stopped, the guy must be().Atake inBslacked offCstowedDtaken

单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()Athe chief engineer must be informed at firstBthe captain must be informed at firstCit must be taken by the duty engineerDthe generator engine must be stopped

单选题The preventer guy,as used on a conventional yard and stay rig,().Ais rigged at an angle of 70°to 90°from the guy it assistsBtakes the strain imposed on the schooner guy when burtoning cargoCis rigged when lifting cargo that exceeds the SWL of a single whipDshould take the strain if the regular guy parts

单选题(), the engine must be stopped immediately.AShould knocking occurBIf knocking occurCShould if knocking occursDIf occur knocking

单选题Be careful when you ()the derrick.AoperatedBoperateCoperatingDoperator

单选题Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.AblocksBgoosenecksCtackleDguys

单选题In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().AAbreast the heelBAt right angles to the boom when viewed from aboveCAft of the heelDForward of the spiderband

单选题The ()(吊杆托架) supports the derrick.Aderrick boom restBderrick headCderrick mastDderrick guy

单选题In a married falls rig at the after end of a hatch , a boom is rigged in a fore and aft line through its heel . Stresses on the outboard guy will be least if the guy is made fast at a point().Aabreast the heelBat right angles to the boom when viewed from aboveCaft of the heelDforward of the spiderband

单选题吊杆停用时,稳索必须要收起来。()AWhen the derrick is stopped, the guy must be stowed.BWhen the derrick is stopped, the guy must be topped.CWhen the derrick is stopped, the guy must be lowered.DWhen the guy is stopped, the derrick must be stowed.