单选题When the derrick is stopped, the guy must be ()(收好).Ataken inBslacked offCadjustedDstowed
单选题
When the derrick is stopped, the guy must be ()(收好).
A
taken in
B
slacked off
C
adjusted
D
stowed
参考解析
解析:
暂无解析
相关考题:
In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point ______.A.Abreast the heelB.At right angles to the boom when viewed from aboveC.Aft of the heelD.Forward of the spiderband
The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts
起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.
吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.
不要随意地移动稳索。()A、Don’t shift the guy as you like.B、Don’t shift the stay as you like.C、Don’t move the derrick as you like.D、Don’t move the crane as you like.
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space
单选题When the derrick changes its ()(角度), its lifting capacity changes correspondingly.AangelBlengthCheightDangle
单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()Athe chief engineer must be informed at firstBthe captain must be informed at firstCit must be taken by the duty engineerDthe generator engine must be stopped
单选题The preventer guy,as used on a conventional yard and stay rig,().Ais rigged at an angle of 70°to 90°from the guy it assistsBtakes the strain imposed on the schooner guy when burtoning cargoCis rigged when lifting cargo that exceeds the SWL of a single whipDshould take the strain if the regular guy parts
单选题(), the engine must be stopped immediately.AShould knocking occurBIf knocking occurCShould if knocking occursDIf occur knocking
单选题Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.AblocksBgoosenecksCtackleDguys
单选题In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().AAbreast the heelBAt right angles to the boom when viewed from aboveCAft of the heelDForward of the spiderband
单选题In a married falls rig at the after end of a hatch , a boom is rigged in a fore and aft line through its heel . Stresses on the outboard guy will be least if the guy is made fast at a point().Aabreast the heelBat right angles to the boom when viewed from aboveCaft of the heelDforward of the spiderband
单选题吊杆停用时,稳索必须要收起来。()AWhen the derrick is stopped, the guy must be stowed.BWhen the derrick is stopped, the guy must be topped.CWhen the derrick is stopped, the guy must be lowered.DWhen the guy is stopped, the derrick must be stowed.