单选题A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()AAre there at least ten RS-232 ports available on the HMC?BAre there at least ten RS-422 ports available on the HMC?CAre there at least ten RS-232 and two RS-422 ports available on the HMC?DAre there at least two RS-232 and ten RS-422 ports available on the HMC?
单选题
A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()
A
Are there at least ten RS-232 ports available on the HMC?
B
Are there at least ten RS-422 ports available on the HMC?
C
Are there at least ten RS-232 and two RS-422 ports available on the HMC?
D
Are there at least two RS-232 and ten RS-422 ports available on the HMC?
参考解析
解析:
暂无解析
相关考题:
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A、Is there a need for a PKI Management System?B、Is there a need for end-to-end encryption?C、Do they currently have a Kerberos domain in place?D、Which clients are installed on their desktops -- SSH, Telnet or both?
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()A、Who recommended the memory purchase?B、Have more users been added since the memory purchase?C、Why were additional CPUs not ordered at the same time as the memory?D、Did a performance analysis of peak periods show a memory bottleneck?
The storage specialist has designed a very complex solution with the customer, and needs toverify that all associated equipment will work as expected. Which of the following is designed tohelp lower support cost and improve customer satisfaction?()A、ATScon MonitorB、Technical and Delivery AssessmentC、System Storage Interoperations CenterD、Standalone Solutions Configuration Tool
A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()A、Are there at least ten RS-232 ports available on the HMC?B、Are there at least ten RS-422 ports available on the HMC?C、Are there at least ten RS-232 and two RS-422 ports available on the HMC?D、Are there at least two RS-232 and ten RS-422 ports available on the HMC?
A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()A、Some Express Configurations limit the amount of maximum memory at order time.B、The customer must meet minimum system requirements to obtain Express Configuration pricing. C、The Express Configurations offer less than the maximum number of processors.D、The Express Configurations are only offered through the QuickShip Program.
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()A、IBM TechlineB、IBM SupportlineC、IBM Software DistributionD、IBM Hardware Support
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()A、Twelve 4-way p655 nodes and add more as neededB、Six 8-way p655 nodes and add more as neededC、Six 4-way p655 nodes with four processors CoD on each node in case of growthD、Three 8-way p655 nodes with eight processors CoD on each node in case of growth
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()A、SupportlineB、ServiceSuiteC、Software Maintenance Agreement (SWMA)D、Machine Control Program Remote Support Agreement (MCPRSA)
The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements include the following: ? Eight 1.5 or 1.7GHz processors ? 64GB memory ? 12 fibre adapters ? 11 network adapters ? An estimated 25% growth in the next year What is the most appropriate response to the customer?()A、The p655 is much more expensive than the other solutions.B、The p655 would be at full capacity and would have no room for the growth.C、The p655 is an HPC system and should never be used in a commercial situation.D、The p655 does not support more than 20 adapters so could not accommodate the requirements.
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()A、Service ProcessorB、Service DirectorC、Inventory Scout ServicesD、Service Focal Point
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()A、Use eConfig to configure and validate each pSeries and p5 system.B、Engage Advanced Technical Support to review any outstanding technical issues.C、Confirm with the customer that the solution design meets their requirements.D、Perform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()AWho recommended the memory purchase?BHave more users been added since the memory purchase?CWhy were additional CPUs not ordered at the same time as the memory?DDid a performance analysis of peak periods show a memory bottleneck?
单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()AIs there a need for a PKI Management System?BIs there a need for end-to-end encryption?CDo they currently have a Kerberos domain in place?DWhich clients are installed on their desktops -- SSH, Telnet or both?
单选题The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()AService ProcessorBService DirectorCInventory Scout ServicesDService Focal Point
单选题The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements include the following: ? Eight 1.5 or 1.7GHz processors ? 64GB memory ? 12 fibre adapters ? 11 network adapters ? An estimated 25% growth in the next year What is the most appropriate response to the customer?()AThe p655 is much more expensive than the other solutions.BThe p655 would be at full capacity and would have no room for the growth.CThe p655 is an HPC system and should never be used in a commercial situation.DThe p655 does not support more than 20 adapters so could not accommodate the requirements.
单选题A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()AIBM TechlineBIBM SupportlineCIBM Software DistributionDIBM Hardware Support
单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()ATwelve 4-way p655 nodes and add more as neededBSix 8-way p655 nodes and add more as neededCSix 4-way p655 nodes with four processors CoD on each node in case of growthDThree 8-way p655 nodes with eight processors CoD on each node in case of growth
单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()ASupportlineBServiceSuiteCSoftware Maintenance Agreement (SWMA)DMachine Control Program Remote Support Agreement (MCPRSA)
单选题A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()ASome Express Configurations limit the amount of maximum memory at order time.BThe customer must meet minimum system requirements to obtain Express Configuration pricing. CThe Express Configurations offer less than the maximum number of processors.DThe Express Configurations are only offered through the QuickShip Program.
单选题A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()AA DCE domainBA Kerberos domainCA PPP tunnel between the serversDAn IPSEC tunnel between the servers
单选题A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()ATSMBPSSPCWebSMDLoadLeveler
单选题The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()AUse eConfig to configure and validate each pSeries and p5 system.BEngage Advanced Technical Support to review any outstanding technical issues.CConfirm with the customer that the solution design meets their requirements.DPerform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()AOrder a new HMC to support the p5 system.BAttach the new p5 system to the existing HMC.CUpgrade the existing HMC to accommodate both the POWER4 and p5 systems.DDo nothing. This system does not require an HMC.
单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()ARecommend the customer call EMC.BRecommend the customer call IBM hardware support.CRecommend the customer contact SupportLine.DRecommend the customer re-creates the volume groups.