单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()AWho recommended the memory purchase?BHave more users been added since the memory purchase?CWhy were additional CPUs not ordered at the same time as the memory?DDid a performance analysis of peak periods show a memory bottleneck?
单选题
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()
A
Who recommended the memory purchase?
B
Have more users been added since the memory purchase?
C
Why were additional CPUs not ordered at the same time as the memory?
D
Did a performance analysis of peak periods show a memory bottleneck?
参考解析
解析:
暂无解析
相关考题:
The purpose of a collection letter is to ( ).A. persuade a customer to buy a productB. give a discount to a potential customerC. ask a customer to pay a past-due bill
A database exists as a read-intensive server that is operating with query_cachek_type =DEMAND.The database is refreshed periodically, but the resultset size of the queries does not fluctuate.Note the following details about this environment: A web application uses a limited set of queries. The Query Cache hit rate is high.All resultsets fit into the Query Cache. All queries are configured to use the Query Cache successfully. The response times for queries have recently started to increase.The cause for this has correctly been identified as the increase in the number of concurrent users accessing the web service.Based solely on the information provided, what is the most likely cause for this slowdown at the database level?()A.The Query Cache is pruning queries due to an increased number of requestsB.Query_cache_min_res_unit has been exceeded, leading to an increased performance overhead due to additional memory block lookupsC.Mutex contention on the Query Cache is forcing the queries to take longer due to its singlethreaded natureD.The average resultset of a query is increasing due to an increase in the number of users requiring SQL statement execution
Which three best describe the partner benefits of the Cisco Lifecycle Services approach?()A、Improve customer satisfaction ratesB、Improve the skill sets of their staff membersC、Increase their staff productivityD、Reduce the risk involved with deploying and supporting new and complex technologiesE、Improve response times for network outagesF、Help ensure that suppliers are meeting metrics
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()A、Server forms condensationB、Server will not POSTC、Server’s services will not startD、Server response times are slow due to temperature change
A customer calls in, talking constantly without allowing time for the technician to answer or ask questions. The technician decides to place the customer on hold to work on another issue and misses what the customer’s problem was. When the customer is finished explaining the issue, the technician asks the customer to summarize the problem again, which angers the customer. How could the technician have better handled the situation to avoid such a confrontation?()A、The technician should have asked the customer to slow down and allow for a response to a few of the matters brought up in discussion.B、The technician should have allowed the customer to finish completely, and then return to the customer’s first point to build a structured discussion.C、The technician should have transferred the call to a supervisor, as the supervisor is better trained to handle such customers.D、The technician should have only asked closed-ended questions so the customer could not elaborate on the issues and the technician could troubleshoot the issue.
A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()A、Install only two modules as the RAM has to be installed in pairsB、Purchase one additional RAM module to make it even. Three modules will function as triplechannel and the additional module will be for parityC、Purchase dual channel memory. The triple channel memory may be incompatible with theserver motherboardD、Install the RAM.Two modules will perform as dual channel and one as single channel
Due to slow backup response, an administrator installed a new driver for the SCSI card. After a server reboot the device is not working properly. Which of the following is the BEST course of action?()A、Reboot the server and restore files using ASR.B、In Device Manager, locate the device, and click Roll Back Driver at the driver tab.C、Restore the driver from the previous backup tape.D、Go to Device Manager, locate the device, and click Restore Previous Driver at the driver tab.
A hypervisor has 4GB of RAM, 1TB of RAID 5 SATA storage,two Xeon 2.4GHz Quad CoreProcessors,and four gigabit NIC cards.The hypervisor is running twelve guest operating systems and users are reporting slow response times.Which of the following is MOST likely the cause?()A、ProcessorB、RAMC、HDDD、NIC
A 4-way x445 server with 2GB of memory running Windows 2003 Server with Exchange 2003 is performing poorly. Users are complaining of slow response times when accessing their email. Which subsystem should be checked first as a potential bottleneck?()A、ProcessorsB、Memory subsystemC、Storage subsystemD、Network connectivity
A customer’s small heterogeneous enterprise has grown over time to more than 500 client systems, and the administrator cannot add new servers to the management database. Which of the following is the most likely source of the problem?()A、The management server has reached its size limitation.B、Additional agent licenses must be purchased.C、The CPU and Memory requirements need to be upgraded.D、The default JET database has reached its size limitation.
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()A、Visual Media Key (VMK)B、Integrated Management Module (IMM)C、Remote Supervisor Adapter (RSA II)D、Advanced Management Module (AMM)
A customer purchased a p690 32-way but did not purchase additional ServiceSuite offerings. They asked what type of maintenance is standard on the p690. Which of the following is the most appropriate answer?()A、1 year 7x24B、3 years 7x24C、1 year 9-5 M-FD、3 years 9-5 M-F
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A、An additional 7311-D10 drawerB、An adapter to boot off a SAN deviceC、An additional disk to the media bayD、Two disks to the internal configuration
A customer’s server is experiencing slow application response due to lack of processor power. In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()A、An x255 with 4 processorsB、An x365 with 4 processorsC、An x445 with 4 processorsD、An x445 with 32 processors
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager
A mainframe customer wants to add additional disk capacity to an IBM System Storage DS8100to accommodate a projected workload increase. They ask the storage specialist to assess theimpact of the additional capacity on the DS8100 without other upgrades. Which tool bestassesses the impact of the upgrade on response times?()A、Capacity MagicB、TPC for DiskC、RMF disk reportsD、Disk Magic
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
单选题A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()AAn additional 7311-D10 drawerBAn adapter to boot off a SAN deviceCAn additional disk to the media bayDTwo disks to the internal configuration
多选题Which three best describe the partner benefits of the Cisco Lifecycle Services approach?()AImprove customer satisfaction ratesBImprove the skill sets of their staff membersCIncrease their staff productivityDReduce the risk involved with deploying and supporting new and complex technologiesEImprove response times for network outagesFHelp ensure that suppliers are meeting metrics
单选题A customer’s server is experiencing slow application response due to lack of processor power. In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()AAn x255 with 4 processorsBAn x365 with 4 processorsCAn x445 with 4 processorsDAn x445 with 32 processors
单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()AWho recommended the memory purchase?BHave more users been added since the memory purchase?CWhy were additional CPUs not ordered at the same time as the memory?DDid a performance analysis of peak periods show a memory bottleneck?
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager
单选题A customer has a p650 with a write-intensive database application. Recently the order entry team has complained about unusually slow response times. There have been no complaints from any other departments. Which of the following actions would most likely address the problem?()ADouble the number of processors.BDouble the number of memory DIMMs.CDouble the number of network adapters.DDouble the number of SCSI buses and disks.
单选题“One or two free admission days at slow times.”“Slow times”here means _____.Abusiness is developingBbusiness is badCstrolling is slowDpeople are slow in learning