单选题A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()ATSMBPSSPCWebSMDLoadLeveler
单选题
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
A
TSM
B
PSSP
C
WebSM
D
LoadLeveler
参考解析
解析:
暂无解析
相关考题:
An Enterprise Resource Planning(ERP) is built upon a commercial(71)that promises the seamless(72)of all the information flowing through the company -- financial, accounting, human resources, supply chain and customer information. In implementation, all ERP systems include several features. The system is installed on a typical database management system. It requires initial setup according to the organization's process, but it may be(73)according to the organization's unique process requirements through a tool set contained within the ERP applications. Using ERP,(74)can be prescribed to automate approval processes through established chains of commanD. One of the methods used to effect rapid implementation of the ERP system is to conduct concurrent(75)sessions during the early stages of ERP implementation.A.operating systemB.middlewareC.software packageD.management system
CRM的最常用的意思是( )。 A.Customer Relationship Management ServicesB.Customer Request ManagementC.Customer Relationship ManagerD.Co-operation Relationship Management
What is one reason you might recommend a solution using only autonomous access points to a customer? ()A、 The customer requires Layer 3 roaming.B、 The customer requires immediate wire line integration with a catalyst 6500 switch.C、 The customer needs an outdoor-ready access point.D、 The customer wants the option to migrate to LWAPP.
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A、Is there a need for a PKI Management System?B、Is there a need for end-to-end encryption?C、Do they currently have a Kerberos domain in place?D、Which clients are installed on their desktops -- SSH, Telnet or both?
A customer wants to make certain all connections to their RSA II management cards installed in their x346 servers are secure. Which of the followings options could be used to ensure this requirement?()A、Install SSL on all RSA II cardsB、Enable encryption on the RSA II adapterC、Set up a VPN to all RSA II cardsD、Install a certificate server on the management network and issue certificates to all RSA II cards
A customer needs 40 TB for Tier 2 Information Lifecycle Management (ILM) data installed on the System z/VM. Their current data center is critically short of floor space. Which of the following would satisfy the customer requirement()A、a DS5300 withFibre Channel drives B、an XIV with 15 modules of 1 TB drives C、a DS5100 with 2 TB SATA drivesD、an XIV with 6 modules of 1 TB drives
()is software about the relation between the customer the customer and the supplier in marketingA、Customer Relationship Management (CRM)B、Customer serviceC、Sales planningD、Distribution channel
What is SCM?()A、Supply Customer ManagementB、Support Customer ManagementC、Supply Chain MaterialsD、Supply Chain Management
Which of these is a benefit of an integrated security management system? ()A、 It provides configuration, monitoring, and troubleshooting capabilities across a wide range of security products.B、 It integrates security device management products and collects events on an "as needed" basis to reduce management overhead.C、 It integrates security management capabilities into the router or switch.D、 It provides a single point of contact for all security configuration tasks thereby enhancing the return on investment.E、 It leverages existing network management systems such as HP OpenView to lower the cost of implementation.
Enterprise Asset Management packages offer a wide range of capabilities. Which three areas of capability are covered by IBM Maximo Asset Management solutions?()A、work ordersB、human resourcesC、inventory controlD、preventive maintenanceE、facilities schedule managementF、customer relationship management
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI
A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()A、NPIVB、vSCSIC、Arbitrated loopD、Converged adapter
A customer has a mixed Dell and IBM server environment. They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers. Which TWO features of IBM Director will be an advantage for this customer?()A、IBM Director comes with free Aurema and SteelEye software plug-ins.B、IBM Director supports non-IBM industry standard Intel based servers.C、IBM Director servers can be managed from within the MS Performance Monitor.D、IBM Director requires no agents to be installed and run on the IBM systems.E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()A、Visual Media Key (VMK)B、Integrated Management Module (IMM)C、Remote Supervisor Adapter (RSA II)D、Advanced Management Module (AMM)
A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A、Linux will be restricted to the p650 system, as it is not supported on the p630.B、The customer can run Linux on all the existing systems with or without the presence of AIX.C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler
Which of the following environments is most closely addressed by the N series N3600?()A、a customer that requires block level storage B、a customer that requires CIFS and AIX NFS environments C、a customer that requires good scalability and performance D、a customer that needs to consolidate multiple storage controllers under a single interface
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
A customer is running a number of HP Intel servers within an IBM management environment. The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts. Into which system are the MIB files compiled?()A、On the HP managed serverB、On the IBM Director serverC、On the IBM Director Jet databaseD、In the IBM Director database
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A、JS21B、JS23C、PS700D、PS701
单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()AIs there a need for a PKI Management System?BIs there a need for end-to-end encryption?CDo they currently have a Kerberos domain in place?DWhich clients are installed on their desktops -- SSH, Telnet or both?
单选题A customer needs 40 TB for Tier 2 Information Lifecycle Management (ILM) data installed on the System z/VM. Their current data center is critically short of floor space. Which of the following would satisfy the customer requirement()Aa DS5300 withFibre Channel drives Ban XIV with 15 modules of 1 TB drives Ca DS5100 with 2 TB SATA drivesDan XIV with 6 modules of 1 TB drives
单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()AThe new system requires 1 installed processor card for the GX++ bus adapterBThe new system requires a minimum of 2 installed processor cards for the GX++ bus adapterCThe new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterDThe new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
单选题Which of these is a benefit of an integrated security management system? ()A It provides configuration, monitoring, and troubleshooting capabilities across a wide range of security products.B It integrates security device management products and collects events on an as needed basis to reduce management overhead.C It integrates security management capabilities into the router or switch.D It provides a single point of contact for all security configuration tasks thereby enhancing the return on investment.E It leverages existing network management systems such as HP OpenView to lower the cost of implementation.
单选题Which of the following environments is most closely addressed by the N series N3600?()Aa customer that requires block level storage Ba customer that requires CIFS and AIX NFS environments Ca customer that requires good scalability and performance Da customer that needs to consolidate multiple storage controllers under a single interface
单选题A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()ALinux will be restricted to the p650 system, as it is not supported on the p630.BThe customer can run Linux on all the existing systems with or without the presence of AIX.CLinux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.DLinux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
多选题Enterprise Asset Management packages offer a wide range of capabilities. Which three areas of capability are covered by IBM Maximo Asset Management solutions?()Awork ordersBhuman resourcesCinventory controlDpreventive maintenanceEfacilities schedule managementFcustomer relationship management
单选题What is one reason you might recommend a solution using only autonomous access points to a customer? ()A The customer requires Layer 3 roaming.B The customer requires immediate wire line integration with a catalyst 6500 switch.C The customer needs an outdoor-ready access point.D The customer wants the option to migrate to LWAPP.