单选题The ()(箱装货) should be handled by cargo tray.Abagged cargoBdrummed cargoCcased cargoDpacked cargo

单选题
The ()(箱装货) should be handled by cargo tray.
A

bagged cargo

B

drummed cargo

C

cased cargo

D

packed cargo


参考解析

解析: 暂无解析

相关考题:

Risks that cannot be identified or evaluated _____ .A should be deflected to the contracting officer.B should be handled via contingency allowances.C should be ignored, since they cannot be identified.D should be ignored, since they are not covered in the Risk Assessment.E C and D

Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):A should be deflected to the contracting officerB should be handled via contingency allowancesC should be ignored, since they cannot be identifiedD should be ignored, since they are not covered in the Project Risk AssessmentE C and D

145 Risks that cannot be identified or evaluated _____ .A. should be deflected to the contracting officer.B. should be handled via contingency allowances.C. should be ignored, since they cannot be identified.D. should be ignored, since they are not covered in the Risk Assessment.E. C and D

Never______stowed like this.A.optional cargo should beB.should optional cargo beC.should be optional cargoD.optional cargo must be

Duty sailors will consider the conditions of (装卸货)______.A.cargo handledB.cargo handlesC.cargo handleD.cargo handling

Cargo on deck,plants and live animals are usually received,handled,carried,kept and discharged at ______.A.Carrier’s riskB.Owner’s riskC.Merchant’s riskD.Charterer’s risk

A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo

It’s also the sailors’ job to ()(照料) cargo.A、keepB、take care ofC、handleD、hold

deck cargo ()A、舱内货B、包装货C、大宗货D、甲板货

The()(精致货) must be handled with care.A、bagged cargoB、delicate cargoC、cased cargoD、non-packed cargo

Duty sailors will consider the conditions of (装卸货)().A、cargo handledB、cargo handlesC、cargo handleD、cargo handling

单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().Aallow greater than normal loads to be handled by the gearBact as an inboard guy in the event the inboard guy parts during cargo handlingCassist the outboard guy in supporting stresses during cargo handlingDprevent the inboard guy from parting due to stresses during cargo handling

单选题If the moisture content of the cargo sample is()the Transportable Moisture Limit,then the cargo should be safe to load.AaboveBbelowCequal toDuncertain

单选题The ()(笨重货) must be handled by jumbo boom or shore crane.Aawkward cargoBdrummed cargoCcased cargoDheavy cargo

单选题Entries should be made in a Ro-Ro vessel’s cargo-securing device record book for().Aprocedures for accepting cargo securing devicesBprocedures for maintaining and repairing cargo-securing devicesCrecord of cargo securing device inspectionsDAll of the above

单选题A cargo of refrigerated fruit is packed in crates with transverse members dividing the crate in two equal parts. Which statement is TRUE?()AThe cargo block should be tightly packed if the cargo is suitably chilled upon delivery to the vesselBBoth sides of each crate must be checked for the temperature and the appearance of the fruitCThe cargo block should be stowed with air channels built throughout the stowed cargoDThe crates should NEVER be stowed brick fashion

单选题The ()(袋装货) can’t be unloaded by hooks.Abagged cargoBdrummed cargoCcased cargoDdeck cargo

单选题Cargo on deck,plants and live animals are usually received,handled,carried,kept and discharged at().ACarrier’s riskBOwner’s riskCMerchant's riskDCharterer’s risk

单选题Some general cargo is handled by ().Ashore cranesBheavy derricksCcontainersDequipment

单选题Never()stowed like this.Aoptional cargo should beBshould optional cargo beCshould be optional cargoDshould optional cargo

单选题Which of the following element(s) should be taken into account in the preparation of the “Cargo Securing Manual”? ()ADuration of the voyageBTypes of cargo units and vehicles to be carriedCWeight of cargo units and vehiclesDAll of the above

单选题()is just to put it()and notify me as to where and how the cargo was damaged.AWhat you ought to do with the damaged cargo/asideBWhat you should do with the damaged cargo/besideCWhat will you do with the damaged cargo/besideDWhat have you to do with the damaged cargo/side by side

单选题It should be ensured that only () vapor is handled by the refrigeration compressor.AhumidityBdryCsteamDoil

单选题The ()(桶装货) should be loaded by cargo net.Abagged cargoBdrummed cargoCcased cargoDdeck cargo

单选题The ()(包装货) is loaded and unloaded by cargo sling.Abagged cargoBpacked cargoCcased cargoDdeck cargo

单选题Strong smelling cargo should be stowed()the cargo absorbing foreign smell.Atogether withBon top ofCunderneathDaway from

单选题deck cargo ()A舱内货B包装货C大宗货D甲板货