单选题The ()(笨重货) must be handled by jumbo boom or shore crane.Aawkward cargoBdrummed cargoCcased cargoDheavy cargo
单选题
The ()(笨重货) must be handled by jumbo boom or shore crane.
A
awkward cargo
B
drummed cargo
C
cased cargo
D
heavy cargo
参考解析
解析:
暂无解析
相关考题:
________ is used for heaving up and slacking away the anchor and chainA.A winchB.A windlassC.A craneD.A jumbo boom
If our captain is not in his cabin, he must be on the(驾驶台)_______.A.paint lockerB.engine roomC.bridgeD.shore
If your vessel is equipped with a radiotelephone,what must also be aboard?A.Certificate of InspectionB.List of ship stationsC.Copy of ship to shore channelsD.Radio station license
The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A、重吊杆吊重货和集装箱货。B、龙门吊能起吊重件货,重吊杆能起吊集装箱。C、重吊杆能起吊重件货,龙门吊能起吊集装箱。D、龙门吊吊重货和集装箱货。
If our captain is not in his cabin, he must be on the ().A、paint lockerB、engine roomC、bridgeD、shore
If our captain is not in his cabin, he must be on the(驾驶台)().A、paint lockerB、engine roomC、bridgeD、shore
The()(精致货) must be handled with care.A、bagged cargoB、delicate cargoC、cased cargoD、non-packed cargo
What is required for proper implementation of jumbo frame support on a Cisco Nexus 2000 Series Fabric Extender?() A、 The interface configured as FEX fabric requires the MTU to be set to jumbo.B、 The service policy must be applied to the system QoS.C、 The device defaults to jumbo frame support; no changes are required.D、 The switchport in the FEX interface must be set to MTU 9216.
单选题If your vessel is equipped with a radiotelephone,what must also be aboard?()ACertificate of InspectionBList of ship stationsCCopy of ship to shore channelsDRadio station license
单选题The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A重吊杆吊重货和集装箱货。B龙门吊能起吊重件货,重吊杆能起吊集装箱。C重吊杆能起吊重件货,龙门吊能起吊集装箱。D龙门吊吊重货和集装箱货。
单选题The connection facilities for the international shore connection must be located to provide access().Aon either side of the vesselBas close as possible to the houseCon the main deckDon each level of the accommodation space
单选题The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()AThe boat should be hoisted a few inches clear of the cradle before cranking out the davitsBThe inboard gripes should be cast off before the outboard gripesCThe outboard section of the cradle must be releasedDThe tricing pendants will automatically bring the boat alongside at the embarkation deck
单选题The greatest strain,when lifting a load with the jumbo purchase,is on().Aall of the parts,dividing the load equallyBthe hauling part because it must absorb the frictional losses of all the sheavesCthe parts in the movable blockDthe standing part because it is directly connected to the weight
单选题Most people hate to do clothes-ironing because ______.Ait has to be done by one personBit must be handled skillfullyCit involves careful planningDit is time-consuming
单选题What is required for proper implementation of jumbo frame support on a Cisco Nexus 2000 Series Fabric Extender?()A The interface configured as FEX fabric requires the MTU to be set to jumbo.B The service policy must be applied to the system QoS.C The device defaults to jumbo frame support; no changes are required.D The switchport in the FEX interface must be set to MTU 9216.
单选题我们每航次拆卸一次吊杆。()AWe dismantle the jumbo boom twice a voyage.BWe dismantle the derricks once a voyage.CWe examine the derricks once a voyage.DWe dismantle the heavy derricks once a voyage.
单选题The jumbo boom can ().Alift heavy cargoBload and unloadCjoin ropes togetherDlift light cargo
单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A125 mmB183 mmC215 mmDIt depends on outside pipe diameter