单选题In the process of the shafting management, special attention should be paid to()Aon the sailing, the water in the aft peak tank should be excluded as much as possibleBthe stuffing style ahead sealing shouldn’t have any water leaking outCSimplex astern sealing shouldn’t have any oil leaking outDSimplex ahead sealing can have some oil leaking out
单选题
In the process of the shafting management, special attention should be paid to()
A
on the sailing, the water in the aft peak tank should be excluded as much as possible
B
the stuffing style ahead sealing shouldn’t have any water leaking out
C
Simplex astern sealing shouldn’t have any oil leaking out
D
Simplex ahead sealing can have some oil leaking out
参考解析
解析:
暂无解析
相关考题:
To Miss Bean the most important thing for a student is to ________.A. pay close attention to what the teacher saysB. learn to think and have one’s own ideaC. keep silent and unnoticed in classD. get special attention from the teacher
Which of the following is not a scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification
The project charter is prepared in which scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification
Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Project Integration Management.A.Developing project charterB.Developing project management planC.Analyzing project risksD.Monitoring and controlling project
___________ of teaching writing pays great attention to the accuracy of the final product but ignores the process. A. The product-oriented methodB. The process-oriented methodC. The quality-oriented methodD. The test-oriented method
Which background process of a database instance, using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?() A. ASMBB. PMONC. RBALD.SMON
The Develop Project Management Plan Process includes the actions necessary to define, prepare, integrate, and coordinate all constituent plans into a (75).A.Project Scope StatementB.Project Management PlanC.ForecastsD.Project Charter
The Develop Project Management Plan Process includes the actions necessary to define, prepare,integrate, and coordinate all constituent plans into a ( )A. Project Scope StatementB.Project Management PlanC.ForecastsD.Project Charter
__________method of teaching writing pays great attention to the accuracy of the finalproduct but ignores the process, which the students go through to reach the final goal.A.Form-orientedB.Product-orientedC.Content-orientedD.Process-oriented
The_______approach to writing teaching pays attention to not only what to write, but also how to write.A.product-orientedB.process-orientedC.form-focusedD.meaning-focused
__________method of teaching writing pays great attention to the accuracy of the final product but ignores the process, which the students go through to reach the final goal.A.Form-orientedB.Product-orientedC.Content-orientedD.Process-oriented
The information security management system preseryes the abfidentiality integrity and availability of lnformation by applyinga/an() management process and gives confidence to interested partiesA.qualityB.informationC.riskD.data]
A project is a[temporary](请作答此空)of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to( )project(s).A.taskB.workC.sequenceD.activity
( ) is the process of documenting. Analyzing,tracing,prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project. A.Integrated management B.Configuration management C.Scope management D.Requirements management
( ) is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project.A、Integrated managementB、Configuration managementC、Scope managementD、Requirements management
Which background process of a database instance, using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()A、ASMBB、PMONC、RBALD、SMON
Which statement is true regarding the Junos OS?()A、Each process runs in its own protected memory space ensuring that one process cannot directly interface with anotherB、Process share memory space but separate ASICs so that one process cannot directly interfere with anotherC、A central processor called the IP2 chip dynamically assings memory as process needs fluctuateD、The memory management daemon (mmd) is responsible for allocating new memory for process as they request it
Which background process of a database instance, using Automatic Storage Management (ASM), connects asa foreground process into the ASM instance?()A、ASMBB、PMONC、RBALD、SMON
单选题In the management of the shafting, because() carry heavy load and caused high temperature easily, it should be paid attention.Athe bearing near to the diesel engineBthe intermediate bearing near to the thrust bearingCthe intermediate bearing near to the sterntubeDthe bearing located at the middle of the diesel engine and the sterntube
单选题1This article is well written because special attention ______ to the choice of words and style of writing.Ahad been paidBhas been paidCwill be paidDwill have been paid
单选题To avoid ironing the clothes over again, one should ______.Aknow how to iron certain clothes materialBspare no care through all the proceduresCfind some proper hangers for the ironedDpay special attention to the seams
单选题Which background process of a database instance,using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()A ASMBB PMONC RBALD SMON
单选题In the shafting management () should be paid more attention. Ⅰ.f the while metal tailshaft bearing is dripping oil Ⅱ.f some area become blue during the running Ⅲ.he deformation of crankshaftAⅠBⅡCⅢDⅡ+Ⅲ
单选题This article is well written because special attention _____ to the choice of words and style of writing.Ahad been paidBhas been paidCwill be paidDwill have been paid
单选题The special needs of old people for housing have _____ more attention from house designers.ApaidBcalledCdrawnDobtained