During the process of loading,damages to cargo can be reduced to minimum by ______.A.Shippers who deliver the cargo to the ship on timeB.Stevedores who handle the cargo with cautionC.Ship's crew members who check the cargo in regular intervalsD.Consignees who take good care of the cargo

During the process of loading,damages to cargo can be reduced to minimum by ______.

A.Shippers who deliver the cargo to the ship on time

B.Stevedores who handle the cargo with caution

C.Ship's crew members who check the cargo in regular intervals

D.Consignees who take good care of the cargo


相关考题:

For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of ______.A.three barrelsB.four barrelsC.six barrelsD.eight barrels

Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.A.the work of using lines and chains to secure the cargo on boardB.the lash workC.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD.the lashing work

______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A.is notB.has notC.do notD.does not

In accordance with Sinotime,the Charterers will not be responsible for the expenses of __________.A.all lubricating oil and waterB.insurance of the VesselC.losses of and damages to both vessel and cargo due to whatsoever reason occurred during the charter timeD.drydocking,repairs and other maintenance of the Vessel

Where the cargo can be loaded in two different ways,one of which is more economical of space than the other,but each of which is a usual method of loading cargo of the relevant type,the Charterer ______ in whichever of these ways he pleases,unless he is expressly forbidden so to do by the charter-party.A.Has to loadB.Can loadC.LoadsD.Is loaded by

______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.A.coefficient of loadingB.stowage factorsC.ordersD.pours

Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall

单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().Aa subsequent temperature rise will cause the cargo to overflowBair pockets may cause the cargo to bubble out of the ullage holeCthe increased viscosity of the product requires higher loading pressure which increases the chances of a spillDthe tank valve may be stiff and a spill will occur before the valve can be closed

单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.Ais notBhas notCdo notDdoes not

单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A150 millimeters of water pressureB125 millimeters of water pressureC100 millimeters of water pressureD75 millimeters of water pressure

单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().Aremove an existing list that would slow down cargo operationsBinitiate loading in conjunction with unloading at the hatchCimprove stability during cargo operationsDallow longshoremen easy access to the hatch

单选题During the process of loading, damages to cargo can be reduced to minimum by().Ashippers who deliver the cargo to the ship on timeBstevedores who handle the cargo with cautionCship's crew members who check the cargo in regular intervalsDconsig ees who take goo care of the cargo

单选题It’s possible to()out some cargo during loading.AbangBshutClockDclose

单选题A ship is responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBafter the cargo is checked by tallymenCas soon as the cargo loading or unloading beginsDduring the time when loading or unloading is going on

单选题Stress on the topping lift of a swinging boom can be reduced by().Arigging a back stayBraising the boomCincreasing the mechanical advantage of the cargo purchaseDtaking all slack out of the preventer

单选题A cargo tank that is initially gas freed,can be inerted by introducing inert gas by a process known as().AdilutionBdisplacementCprecipitationDEither A or B

单选题()is known as a long hatch during loading operation.AThe largest hatch of a shipBThe hatch that is double riggedCThe hatch where a disproportionate amount of cargo is atowedDThe hatch where the most cargo is stowed

单选题Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.AlashingBshiftingCliftingDtallying

单选题For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of().Athree barrelsBfour barrelsCsix barrelsDeight barrels

单选题Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.Athe work of using lines and chains to secure the cargo on boardBthe lash workCthe work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingDthe lashing work

多选题Which two of these statements describe important aspects of performing a wireless site survey? (Choose two.)  ()AAn 802.11 g access point with a variety of antennas can be used in all standard site surveys.BSite surveys can be performed manually or through assisted site survey.CChannel power during testing starts at the default minimum and gradually increases to the maximum.DOverlapping access points can create performance problems.ESurveys should be done after hours in an office building or during reduced inventory levels in warehouses.

单选题Bonding cables are used during cargo transfer to().Aprovide safe electrical power connection to barge equipmentBkeep the vessel from surging excessivelyCprevent an accidental discharge of static electricityDsecure the cargo hose to a hatch when loading overall

单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A5 times the maximum working pressure on the hose during cargo transferBone half the designed working pressureC4 times the pressure of the cargo pump used for transferringD5 times the minimum working pressure on the hose during cargo transfer

单选题The most important principle in the cargo stowage is().Ato avoid the rearrangement of the cargo loaded on boardBto ensure the safety of the ship and cargoCto reject the damaged cargo during loading operationDto prevent the spontaneous combustion of the coal and grain

单选题我们正在装危险货。()AWe are loading flammable cargo.BWe are loading dangerous cargo.CWe are discharging flammable cargo.DWe are discharging dangerous cargo.