Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A . Definitive, bottom up.B . Analogy, top down.C . Parametric, bottom up.D . Parametric, top down.E . Analogy, bottom up.
Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.
A . Definitive, bottom up.
B . Analogy, top down.
C . Parametric, bottom up.
D . Parametric, top down.
E . Analogy, bottom up.
相关考题:
Parametric cost estimating involvesA.using the WBS to do bottom up estimatesB.defining the perimeters of the life-cycleC.calculating the individual estimates of work packagesD.using a statistical model to estimate costsE.A and C
In which of the following cost estimating techniques are statistics models used:A . nonparametric cost estimatingB . parametric cost estimatingC . life cycle cost estimatingD . bottom-up estimatingE . All of the above.
A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).A . ParametricB . Definitive.C . BudgetD . Bottom up.E . Top down.
The three most common types of project cost estimates are:A . Order of magnitude, parametric, and budget.B . Parametric, definitive and top down.C . Order of magnitude, definitive and bottom up.D . Order of magnitude, budget and definitive.E . Analogy, parametric and top down.
140 The three most common types of project cost estimates are:A. Order of magnitude, parametric, and budget.B. Parametric, definitive and top down.C. Order of magnitude, definitive and bottom up.D. Order of magnitude, budget and definitive.E. Analogy, parametric and top down
168 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A. Definitive, bottom up.B. Analogy, top down.C. Parametric, bottom up.D. Parametric, top down.E. Analogy, bottom up
177 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).A. ParametricB. Definitive.C. BudgetD. Bottom up. E. Top down
84 In which of the following cost estimating techniques are statistics models used:A. nonparametric cost estimatingB. parametric cost estimatingC. life cycle cost estimatingD. bottom-up estimatingE. All of the above.
166 In which of the following cost estimating techniques are statistics models used:A. nonparametric cost estimatingB. parametric cost estimatingC. life cycle cost estimatingD. bottom-up estimatingE. All of the above
50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A. Definitive, bottom up.B. Analogy, top down.C. Parametric, bottom up.D. Parametric, top down.E. Analogy, bottom up.
59 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).A. ParametricB. Definitive.C. BudgetD. Bottom up.E. Top down
19 Parametric cost estimating involvesA. using the WBS to do bottom up estimatesB. defining the perimeters of the life-cycleC. calculating the individual estimates of work packagesD. using a statistical model to estimate costsE. A and C
三个最常用的项目成本估算模式是( )A.数学模拟order of magnitude参数法parametric及预算budgetB.参数法parametric确定的definitive及自上而下法top downC.数学模拟order of magnitude确定的definitive及自下而上法bottom upD.数学模拟order of magnitude预算budget及确定性的definitive
Approaches towards reading and listening are __________. A.the bottom-up model and the top-down modelB.the bottom-up model and the interactive modelC.the bottom-up modelD.the top-down model and the interactive model
栈(Stack)是限定仅在(18)进入插入或删除操作的线性表。对栈来说,表尾端称为(18);表头端称为(18)。A.表头 栈顶(top),栈底(bottom)B.表头,栈底(bottom)栈顶(top)C.表尾,栈顶(top)栈底(bottom)D.表尾,栈底(bottom)栈顶(top)
在VRP中,PQ的各队列的缺省长度为()。 A.top-20middle-40normal-60bottom-80B.top-20middle-20normal-20bottom-20C.top-10middle-20normal-40bottom-80D.top-80middle-60normal-40bottom-20
A term applied to the bottom shell plating in a double-bottom ship is ______.A.bottom floorB.outer bottomC.shear platingD.tank top
Frames to which the tank top and bottom shell are fastened are called ______.A.floorsB.intercostalsC.stringersD.tank top supports
Frames to which the tank top and bottom shell are fastened are called ______.A.intercostalsB.stringersC.tank top supportsD.floors
( )Estimating current project costs by analogy with similar projects。( )是以类似的项目进行类比估计当期项目的费用。A.Top-down estimating自上而下估算法B.Parametric model method参数模型法C.Bottom-up estimation metho从下向上的估计法D.Computing Tool Aided Method计算工具辅助的方法
()is a technique for estimating the duration or cost of activity or a projecy using historical data orm a similar activity or project.A.Analogous estimatingB.Parametric estimatingC.Three-Point estmatingD.Bottom-Up estimating
在HTML中,盒子模型中元素实际占位的高度应该为()。A、height属性+padding-top+padding-bottomB、height属性+padding-top+padding-bottom+border-top+border-bottomC、height属性+margin-top+margin-bottom+border-top+border-bottomD、height属性+padding-top+padding-bottom+border-top+border-bottom+margin-top+margin-bottom
在VRP中,PQ的各队列的缺省长度为()。A、top-20middle-40normal-60bottom-80B、top-20middle-20normal-20bottom-20C、top-10middle-20normal-40bottom-80D、top-80middle-60normal-40bottom-20
单选题A term applied to the bottom shell plating in a double-bottom ship is().Abottom floorBouter bottomCshear platingDtank top
单选题Frames to which the tank top and bottom shell are fastened are called().AfloorsBintercostalsCstringersDtank top supports