50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A. Definitive, bottom up.B. Analogy, top down.C. Parametric, bottom up.D. Parametric, top down.E. Analogy, bottom up.
50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.
A. Definitive, bottom up.
B. Analogy, top down.
C. Parametric, bottom up.
D. Parametric, top down.
E. Analogy, bottom up.
相关考题:
An individual who is working on the satisfaction of physiological needs has essentially satisfied which needs?A SafetyB Empowerment/authorityC EsteemD Self-actualizationE None of the above
Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:A 1.4B 0.8C 0.2D 0.12E None of the above
The "buy or make" decision is usually made during the:A acquisition cycleB contract evaluation cycleC requirements cycleD pre-award cycleE at any time that is convenient for the project manager
48 Situations calling for a matrix organization include outside pressure for dual focus, _____ and pressure for high information processing capability.A. Pressure for clear accountabilityB. Pressure for reduced duplication of effortC. Pressure for shared resourcesD. Pressure for formalized communication
46 Perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:A. Coping with employees who report to multiple bossesB. Too much sponsorship involvementC. Unclear functional understanding of the technical requirementsD. Escalating project costsE. All of the above
123 In the project environment, the individual ultimately responsible for quality control is:A. The line workers who must strive "to do things right the first time" to avoid quality problems.B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.D. The project manager who has ultimate responsibility for the entire project.E. the customer who must ensure that he is receiving a quality product from the vendor
● The critical path in a schedule network is the path that:A Takes the longest time to completeB Must be done before any other tasksC Allows some flexibility in scheduling a start time.D Is not affected by schedule slippageE All of the above.
在CROSBY,JURAN,DEMING以及他人之前对于质量业绩标准的传统看法认为错误是( )A.有益的,因为我们可以从我们的错误中吸取到教训B.不可避免的C.如果在项目过程中有足够的检查就不易发生错误D.比为阻止错误发生所需要的最复杂的设计工作的成本更大
在一个管道项目执行期间,管道分包商建议在不改变进度和成本的前提下升级某种材料,变更得到批准后,应在何处记当前变更?A、 项目章程B、 配置管理计划C、 工作分解结构D、 质量保证计划