Hotel Chain

Hotel Chain


相关考题:

The general manager of the hotel makes a point of explaining ( ) to all new hands.A. hotel's tariffB. hotel's cultureC. hotel's incomeD. business concept

Which two statements are true about a job chain?() A. A job chain can contain a nested chain of jobs.B. The jobs in a job chain cannot have more than one dependency.C. A job of the CHAIN type can be run using event-based or time-based schedules.D. The jobs in a job chain can be executed only by using the events generated by the Scheduler

A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection

What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain

Prior to magnetic particle inspection of anchor chain,the chain should be ______.A.DegaussedB.DemagnetizedC.SoakedD.Sandblasted

In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack

Where is()(制链器螺杆)?A、compressor barB、chain linkC、chain stopperD、chain locker

First,clean the ()(锚链舱)!A、chain pipeB、chain lockerC、hawse pipeD、anchor

Hotel-chain

Which statement is true about a Dynamic Chain Selection Module instance?()A、It is the first module in the partner module chain in Web Services Security Management (WSSM).B、It is the last module in the partner module chain in WSSM.C、It is the first module in the application module chain for partner.D、It is the last module in the application module chain for the partner.

Which two statements are true about a job chain? ()(Choose two.)A、A job chain can contain a nested chain of jobs.B、The jobs in a job chain cannot have more than one dependency.C、A job of the CHAIN type can be run using event-based or time-based schedules.D、The jobs in a job chain can be executed only by using the events generated by the Scheduler

Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题In anchoring orders, up and down means().Athe chain is not uprightBthe chain is tightCthe chain is uprightDthe chain is slack

单选题What are the two main types of stud link chain().AOil Rig chain and Oil Field Stud Link chainBFlash-butt welded chain and Di-Lok chainCFlash-butt welded chain and Oil Rig chainDOil Field Stud Link chain and Flash-butt welded chain

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is a sufficient scope of chain to keep the anchor on the bottomDthere is more chain out than there is in the chain locker

单选题Prior to magnetic particle inspection of anchor chain,the chain should be().AdegaussedBdemagnetizedCsoakedDsandblasted

单选题When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().Athe same ratioBmore chain for each fathom of depthCless chain for each fathom of depthDtwo anchors with the same ratio of chain

单选题Which statement is true about a Dynamic Chain Selection Module instance?()AIt is the first module in the partner module chain in Web Services Security Management (WSSM).BIt is the last module in the partner module chain in WSSM.CIt is the first module in the application module chain for partner.DIt is the last module in the application module chain for the partner.

名词解释题Hotel Chain

名词解释题Hotel-chain

多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobs.BThe jobs in a job chain cannot have more than one dependency.CA job of the CHAIN type can be run using event-based or time-based schedules.DThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题A chain stripper is used to().Aprevent chain from clinging to the wildcatBclean the marine debris from the chainCflake chain from a boat's chain lockerDclean chain prior to an x-ray inspection

单选题What does the proof test load of an anchor chain demonstrate?()ABreaking strength of the chainBStrength of the chain to a specified limitCAdequate holding power for new bottom conditionsDSafe working load of the chain

单选题What is meant by veering the anchor chain? ()ABringing the anchor to short stayBHeaving in all the chainCLocking the windlass to prevent more chain from running outDPaying out more chain

多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is sufficient weight from the anchor and chain to prevent draggingDthere is more chain out than there is in the chain locker

单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()AOne shot of chain for every ten feet of waterBOne shot of chain for every fifteen feet of waterCOne shot of chain for every thirty feet of waterDOne shot of chain for every ninety feet of water