What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain

What are the two main types of stud link chain ________.

A.Oil Rig chain and Oil Field Stud Link chain

B.Flash-butt welded chain and Di-Lok chain

C.Flash-butt welded chain and Oil Rig chain

D.Oil Field Stud Link chain and Flash-butt welded chain


相关考题:

如下程序段定义了学生成绩的记录类型,由学号、姓名、三门课程成绩(百分制)组成。 Type Stud no As Integer name As String*10 score(1 To 3) As Single End Type 若对某个学生的各数据项进行赋值,下列程序段正确的是( )。A.Dim S As Stud Stud.no=0201 Stud.name="李平" Stud.score=78,88,96B.Dim S As Stud S.no=0201 S.name="李平" S.score=78,88,96C.Dim S As Stud S.no=0201 S.name="李平" S.score(1)=78 S.score(2)=88 S.score(3)=96D.Dim S As Stud Stud.no=0201 Stud.name="李平" Stud.score(1)=78 Stud.score(2)=88 Stud.score(3)=96

Which two statements are true about a job chain?() A. A job chain can contain a nested chain of jobs.B. The jobs in a job chain cannot have more than one dependency.C. A job of the CHAIN type can be run using event-based or time-based schedules.D. The jobs in a job chain can be executed only by using the events generated by the Scheduler

What are three valid Juniper Networks IPS attack object types?() (Choose three.) A. signatureB. anomalyC. trojanD. virusE. chain

What may NOT be used when securing heavy vehicles aboard Ro-Ro vessels ________.A.Chain leverB.TurnbuckleC.WebbingD.Chain

A design modification of an anchor chain which prevents kinking is the ______.A.Detachable linkB.Stud linkC.Kenter linkD.Connecting link

How is the size of chain determined?______.A.Length of link in inchesB.Diameter of metal in link in inches or centimetersC.Links per fathomD.Weight of stud cable in pounds

已知某用户 stud1,其用户目录为/home/stud1。如果当前目录为/home,进入目录/home/stud1/test 的命令是 cd /stud1/test。()

What are three valid Juniper Networks IPS attack object types?() (Choose three.)A、signatureB、anomalyC、trojanD、virusE、chain

What is SCM?()A、Supply Customer ManagementB、Support Customer ManagementC、Supply Chain MaterialsD、Supply Chain Management

Which two statements are true about a job chain? ()(Choose two.)A、A job chain can contain a nested chain of jobs.B、The jobs in a job chain cannot have more than one dependency.C、A job of the CHAIN type can be run using event-based or time-based schedules.D、The jobs in a job chain can be executed only by using the events generated by the Scheduler

Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题When towing,what is the main reason for using a chain bridle on a wire hawser().AIt makes for an easy connectionBIt gives a spring effect to cushion the shockCIt eliminates the necessity of a swivelDIt does not chafe

单选题已知某用户stud1,其用户目录为/home/stud1。如果当前目录/home,使用以下哪个命令后可以进入/home/stud1/test目录?()Acd testBcd/stud1/testCcd stud1/testDcd home

单选题已知某用户stud1,其用户目录为/home/stud1。如果当前目录为/home,进入目录/home/stud1/test的命令是()。Acd testBcd/stud1/testCcd stud1/testDcd home

单选题What are the two main types of stud link chain().AOil Rig chain and Oil Field Stud Link chainBFlash-butt welded chain and Di-Lok chainCFlash-butt welded chain and Oil Rig chainDOil Field Stud Link chain and Flash-butt welded chain

单选题A common means of connecting shots of anchor chain in the field is to use a().AsprocketBKenter linkCswivelDend shackle

多选题Which two statements are true about a job chain? ()(Choose two.)AA job chain can contain a nested chain of jobs.BThe jobs in a job chain cannot have more than one dependency.CA job of the CHAIN type can be run using event-based or time-based schedules.DThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题After deploying the anchor,a permanent chain chaser is().Aremoved from the anchor chainBconnected to a buoy at the anchorCstripped back to the rig and securedDconnected to a buoy halfway down the chain

多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobs.BThe jobs in a job chain cannot have more than one dependency.CA job of the CHAIN type can be run using event-based or time-based schedules.DThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题How is the size of chain determined?().ALength of link in inchesBDiameter of metal in link in inches or centimetersCLinks per fathomDWeight of stud cable in pounds

单选题What does the proof test load of an anchor chain demonstrate?()ABreaking strength of the chainBStrength of the chain to a specified limitCAdequate holding power for new bottom conditionsDSafe working load of the chain

单选题What is meant by veering the anchor chain? ()ABringing the anchor to short stayBHeaving in all the chainCLocking the windlass to prevent more chain from running outDPaying out more chain

多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题Forty-five fathoms is marked on the anchor chain by().Aone turn of wire on the first stud from each side of the detachable linkBtwo turns of wire on the second stud from each side of the detachable linkCthree turns of wire on the third stud from each side of the detachable linkDfour turns of wire on the fourth stud from each side of the detachable link

单选题What is the bow type anchor shackle primarily used for().AChain to chain connectionsBChain to anchor connectionsCKenter link to anchor connectionsDWire rope connections

单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()AOne shot of chain for every ten feet of waterBOne shot of chain for every fifteen feet of waterCOne shot of chain for every thirty feet of waterDOne shot of chain for every ninety feet of water

单选题Which type of link is generally used to connect shots of anchor chain().ADetachableBOpenCPear shapedDStud link