( )is not included in Perform Integrated Change Control Process.A.Defining subsidiary plansB.Approving changesC.Managing changes to deliverablesD.Reviewing all change requests

( )is not included in Perform Integrated Change Control Process.

A.Defining subsidiary plans
B.Approving changes
C.Managing changes to deliverables
D.Reviewing all change requests

参考解析

解析:执行变更控制过程中不包括定义附属计划。

相关考题:

The purpose of configuration management is to:A.insure drawings are updatedB.control change throughout the projectC.control change during the production onlyD.generate engineering change proposalsE.inform. the project manager of changes

33 The purpose of configuration management is to:A. insure drawings are updatedB. control change throughout the projectC. control change during the production onlyD. generate engineering change proposalsE. inform. the project manager of changes

● The purpose of configuration management is to:A insure drawings are updatedB control change throughout the projectC control change during the production onlyD generate engineering change proposalsE inform. the project manager of changes

The perform. Integrated Change Contorl process is the ultimate responsibility of the(①).Although changes may be initiated verbally,they should be recorded in writtern form. and entered into the (②)system.①A.resource managerB.division managerC.functional managerD.project manager②.A.quality managementB.configuration managementC.project managerD.scope management

The Perform. Integrated Change Control process is conducted from project lnception through completion and is the ultimate responsibility of the(75)A.change control boardB. project management officeC.project managerD.configuration management officer

The perform Integrated Change Contorl process is the uitimste responsbilityof the (请作答此空) ,Although changes my be intitated verbally,they should be recorded in writtern form and entered into the ( ) syste.A.resource managerB.division managerC.functional managerD.projeet manager

The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ) .实施整体变更控制过程是从项目开始到项目结束并且是( )项目经理的最终责任。A.Chang control board变更控制委员会B.Project management office项目管理办公室C.Project manager项目经理D.Configuration management officer配置管理员

The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ( ) . A.Chang control boardB.Project management officeC.Project managerD.Configuration management officer

The perform Integrated Change Contorl process is the uitimste responsbilityof the(请作答此空),Although changes my be intitated verbally,y they should be recorded in writtern form and entered into the( )syste.A.resource sanagerB.division sanagerC.functional managerD.projeet manager

The perform Integrated Change Contorl process is the uitimste responsbilityof the( ),Although changes my be intitated verbally,y they should be recorded in writtern form and entered into the(请作答此空)syste.A.quality sanagementB.configurat ion sanagesentC.risk BanagementD.scope management

The project management plan defines how the project is executed,monitored and controlled,and closed.It is progressively elaborated by updates,and controlled and approved through the perform integrated( )process.A.Cost controlB.Schedule controlC.Change controlD.Risk control

When required the perform Integrated Change Control Process includes ()Which is a formally chartered group responsible for reviewing ting approving deferring or rejecting changes to the project and for ing and communicating such decisionsA.BBC]B.CCB]C.BCB]D.CBC]

A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()A、Perform a root cause analysis.B、Escalate the problem.C、Notify stakeholders.D、Establish a plan of action.

Which two functions can be provided by an Integrated Services Router (ISR) in a VoIP network?()A、 ISR can perform the functions of a multipoint control unit to facilitate voice conferencing.B、 ISR can perform the function of a call agent in the event of loss of communication with a CallManager.C、 ISR can provide XML applications to the phones.D、 ISR can provide all of the functionality of a CallManager in the event of loss ofcommunication to the CallManager.E、 ISR can act as a voice gateway to the PSTN.

For WSA SaaS Access Control, the Identity Provider is:() A、 Integrated into the Authentication ServerB、 Deployed by theSaaS service providerC、 Integrated into the WSAD、 An ICAP server that the WSA is configured to communicate with

When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()A、Third-party due diligence policy reviewB、Remote Access PolicyC、Encryption PolicyD、Application change control policyE、Security Personnel policy

An administrator uses C-SPOC to change the user password for all nodes that belong to a  Resource group. The administrator must perform this operation on a node that is:()  A、 included in the resource group.B、 currently managing the resource group.C、 not part of an application resource group.D、 included in a cluster_admin resource group.

On which three can you use Recovery Manager (RMAN) to perform incremental backup?()A、data filesB、control filesC、tablespacesD、password fileE、parameter fileF、whole databaseG、flashback log fileH、archived log filesI、change tracking file

You are using RMAN to perform a closed database backup of your database. You issue these RMAN commands: STARTUP MOUNT; BACKUP  FORMAT ’/BACKUP/df_%d_%s_%p.bus’  DATABASE filesperset = 2;  Which components are included in the backup?()A、Only the data files.B、Only the data files and the online logs.C、The data files, control files, and the online logs.D、The data files and control files, but not the online logs.

One of the tablespaces is read/x7fonly in your database. The loss of all control files forced you to re/x7fcreate the control file.  Which operation do you need to perform after re/x7fcreating the control file and opening the database?()A、drop and re­create the read­only tablespacesB、rename the read­only data files to their correct file namesC、change the tablespace status from read/write to read­onlyD、re­create the read­only tablespace because it is automatically removed

As a result of a media failure, the current online redo log group is corrupted. The database crashes, as the current online group is inaccessible. Which type of incomplete recovery are you most likely to perform? ()A、Cancel-basedB、Recovery using a backup control fileC、Time-basedD、Change-based

综合自动化integrated supervision and control system

名词解释题综合自动化integrated supervision and control system

单选题You are using RMAN to perform a closed database backup of your database. You issue these RMAN commands: STARTUP MOUNT; BACKUP  FORMAT ’/BACKUP/df_%d_%s_%p.bus’  DATABASE filesperset = 2;  Which components are included in the backup?()AOnly the data files.BOnly the data files and the online logs.CThe data files, control files, and the online logs.DThe data files and control files, but not the online logs.

单选题Examine the following scenario: -Database is running in ARCHIVELOG mode. -Complete consistent backup is taken every Sunday. -On Tuesday the instance terminates abnormally because the disk on which control files are located gets corrupted -The disk having active online redo log files is also corrupted. -The hardware is repaired and the paths for online redo log files and control files are still valid. Which option would you use to perform the recovery of database till the point of failure?()ARestore the latest whole backup, perform complete recovery, and open the database normallyBRestore the latest whole backup, perform incomplete recovery, and open the database with the RESETLOGS optionCRestore the latest backups control file, perform complete recovery, and open the database with the RESETLOGS optionDRestore the latest backup control file, perform incomplete recovery using backup control file, and open the database with the RESETLOG option

单选题For WSA SaaS Access Control, the Identity Provider is:()A Integrated into the Authentication ServerB Deployed by theSaaS service providerC Integrated into the WSAD An ICAP server that the WSA is configured to communicate with

单选题An administrator uses C-SPOC to change the user password for all nodes that belong to a  Resource group. The administrator must perform this operation on a node that is:()A included in the resource group.B currently managing the resource group.C not part of an application resource group.D included in a cluster_admin resource group.