NO.2 lifeboat is located on ()side.A、starboardB、bothC、eachD、port

NO.2 lifeboat is located on ()side.

  • A、starboard
  • B、both
  • C、each
  • D、port

相关考题:

The control lever for the mechanical disengaging apparatus in a lifeboat shall ______.A.be painted bright redB.be secured to a permanent part of the lifeboat structureC.have the area surrounding the lever painted whiteD.All of the above

Your vessel has lifeboats on both sides. Lifeboat No. 2 is located ________.A.forward of lifeboat No. 4 on the starboard sideB.forward of lifeboat No. 4 on the port sideC.aft of lifeboat No. 1 on the starboard sideD.All of the above

What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill?A.Which survival craft was used in the drillB.The number of each lifeboat not lowered during each drillC.Only the number of each motor propelled lifeboat that is loweredD.The length of time an oar propelled lifeboat is rowed

Frapping lines ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the lifeboat close alongside the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level

(EMB145)主登机门的关闭由()完成。A、液压系统No.2和储压器B、液压系统No.1和储压器C、电动马达D、液压系统No.2

Cargo in hold No.2 is on() .A、waterB、oilC、fireD、A+B

空中将NO.2液压系统开关关闭后再打开。警告灯的工作情况是什么()A、NO.2 SEROV SYSTEM警告灯先亮。开关接通后灭B、空中不能关闭液压系统,NO.2SEROVSYSTEM警告灯保持不亮C、NO.2 SEROV SYSTEM警告灯先亮。开关接通后不灭D、NO.2 SEROV SYSTEM警告灯先无反应。开关接通后亮

救生艇置放在于艇甲板。()A、Lifeboat is located on the boat deck.B、Lifeboat is located on the main deck.C、Life craft is located on the boat deck.D、Lifeboat is located on the lower deck.

GPWS的高度信息是来自于:()。A、NO.1高度表B、NO.2高度表C、NO.1或者NO.2高度表D、自生的一个随机值

应急浮筒用的是哪个汇流条的电()A、DC ESS BUS 和 NO.1 DC PRI BUSB、NO.1 DC PRI BUS 和 NO.2 DC PRI BUSC、NO.2 DC PRI BUS 和 DC ESS BUSD、DC ESS BUS 和NO.1 DC PRI BUS 和 NO.2 DC PRI BUS

单选题According to the Code of Federal Regulations,on vessels other than river ferryboats and river vessels,how are periodic lifeboat weight tests required to be conducted?()AThe lifeboat is lowered to near the water,loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsBThe lifeboat is loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsCThe lifeboat is lowered into the water until afloat,loaded with the allowed capacity,then released from the fallsDThe lifeboat is lowered to near the water,loaded with the allowed capacity,then released from the falls

单选题Your vessel has lifeboats on both sides. Lifeboat No.2 is located().Aforward of lifeboat No.4 on the starboard sideBforward of lifeboat No.4. on the port sideCaft of lifeboat No. 1 on the starboard sideDAll of the above

单选题Your vessel has lifeboats on both sides. Lifeboat No. 2 is located().Aforward of lifeboat No. 4 on the starboard sideBforward of lifeboat No. 4 on the port sideCaft of lifeboat No. 1 on the starboard sideDAll of the above

单选题In an open lifeboat,the lifeboat compass is usually().Aplaced in a fixed bracket when being usedBclamped to any position convenient for the coxswain to see itCpermanently mounted on the lifeboat's centerlineDmounted in the center of the boat to eliminate deviation

单选题In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()AFrapping lineBTricing lineCRottmer releaseDWinch remote control wire

单选题In order for the automatic lifeboat drain to operate properly().Athe cap should be removed to drain the boat when it is waterborneBthe cage must be free of rubbish or the ball may not seat properlyCthere is an automatic ball check located in a siphon tubeDthe small lever to release the rubber ball float must be turned counterclockwise

单选题The temperature in No.2 hold is below ().AnormalBnormCnormallyDAll above.

单选题What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()AWhich survival craft was used in the drillBThe number of each lifeboat not lowered during each drillCOnly the number of each motor propelled lifeboat that is loweredDThe length of time an oar propelled lifeboat is rowed

单选题Frapping lines are fitted to lifeboat davits to().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close along the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level

单选题Frapping lines().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close alongside the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level

单选题Cargo in hold No.2 is on() .AwaterBoilCfireDA+B

单选题The grab rail of a metal lifeboat is normally located().Aalong the turn of the bilgeBalong each side of the keelCnear the top of the gunwaleDat the bow and at the stern

单选题Frapping lines are fitted to lifeboat davits to().Areduce the swinging of the lifeboat as it is being lowered from the embarkation levelBsecure the lifeboat in the davits when in the stowed positionChold the lifeboat to the ship's side until the tricing lines are passedDbe used as a safety line in an emergency

单选题Lifeboat hatchets should be().Akept in a lockerBsecured at each end of the boat with a lanyardCkept next to the boat coxswainDkept in the emergency locker on the ship and brought to the lifeboat when needed

单选题在NBDP终端设备中,外围设备间传输信息采用(),国际用户电传网与用户交换信息使用的是()。AITA No.2码;4B/3Y码BASCⅡ码;ITA No.2码CITA No.2码;ASCⅡ码D4B/3Y码;ITA No.2码

单选题Limit switches().Acontrol the descent rate of a lifeboatBcontrol the ascent rate of a lifeboatCcut off power to the winch when the lifeboat nears the final stowed positionDcut off power to the winch when the lifeboat reaches the davit bumpers

单选题The control lever for the mechanical disengaging apparatus in a lifeboat shall().Abe painted bright redBbe secured to a permanent part of the lifeboat structureChave the area surrounding the lever painted whiteDAll of the above