单选题In order for the automatic lifeboat drain to operate properly().Athe cap should be removed to drain the boat when it is waterborneBthe cage must be free of rubbish or the ball may not seat properlyCthere is an automatic ball check located in a siphon tubeDthe small lever to release the rubber ball float must be turned counterclockwise

单选题
In order for the automatic lifeboat drain to operate properly().
A

the cap should be removed to drain the boat when it is waterborne

B

the cage must be free of rubbish or the ball may not seat properly

C

there is an automatic ball check located in a siphon tube

D

the small lever to release the rubber ball float must be turned counterclockwise


参考解析

解析: 暂无解析

相关考题:

Vessels having main engines arranged for air starting are to be provided with at least__.A.one automatic drain serving both containersB.two air starting containers of approximately equal sizeC.one control air container and one starting air containerD.one additional means of starting the main engine

Refer to the exhibit. What statement is true base d upon the configuration in the exhibit? () A. CGMP version 2 is being used.B. The switch will use sparse mode first, dense mode second.C. A rendezvous point must be configured in order for the interface to operate in sparse mode.D. IGMP version 2 is being used.E. The rendezvous point is IP address 172.16.4.16.F. If a rendezvous point is configured, the interface cannot operate in dense mode.

You have finished physically installing an access point on the ceiling at your office. At a minimum, which paramenter must be configured on the access point in order to allow a wireless client to operate on it?()A. AESB. PSKC. SSIDD. TKIPE. WEP

A certificated lifeboatman assigned to command the lifeboat must ______.A.be the first individual to board the craftB.drain the hydraulic pressure before lowering the craftC.have a list of the persons assigned to the liftboatD.all of the above

救生艇下水每隔三个月进行一次。()A、Lifeboat launching is operated at intervals of three months.B、Lifeboat launching is operated at intervals for three months.C、Fire drill is carried out once a month.D、Don’t operate two or more hatch covers at the same time.

You have finished physically installing an access point on the ceiling at your officE.At a minimum, which paramenter must be configured on the access point in order to allow a wireless client to operate on it?()A、AESB、PSKC、SSIDD、TKIPE、WEP

Which of the following printers requires a specialized paper in order to operate?()A、ThermalB、LaserC、InkjetD、Impact

You find that the execution time of reports in your datawarehouse application is significantly high. You suspect the lack of indexes to be the reason for the degradation in performance.  Which advisory component would you refer to, in order to determine the appropriate indexes?() A、Memory AdvisorB、Segment AdvisorC、SQL Access AdvisorD、Automatic Workload Repository (AWR)E、Automatic Database Diagnostic Monitor (ADDM)

单选题Vessels having main engines arranged for air starting are to be provided with at least ()Aone automatic drain serving both containersBtwo air starting containers of approximately equal sizeCone control air container and one starting air containerDone additional means of starting the main engine

单选题The type of davit on which you must turn a crank in order to swing the lifeboat out over the ship’s side is a().Asheath-screw davitBgravity davitCradial davitDbruckner davit

单选题Your vessel has lifeboats on both sides. Lifeboat No.2 is located().Aforward of lifeboat No.4 on the starboard sideBforward of lifeboat No.4. on the port sideCaft of lifeboat No. 1 on the starboard sideDAll of the above

单选题The lube oil cooler is located after the lube oil filter in order for ()Athe filter to operate more efficientlyBthe lube oil cooler to be bypassedCpositive lube oil pump suction to be assuredDgalvanic action in the cooler to be minimized

单选题In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()AFrapping lineBTricing lineCRottmer releaseDWinch remote control wire

单选题In order to find out which lifeboat you are assigned, you should look at the ().ACertificate of InspectionBStation BillCShips ArticlesDFire Control Plan

单选题Frapping lines are fitted to lifeboat davits to().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close along the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level

单选题In the two stage flash distilling plant, which of the pumps listed is vented to the shell of the second stage in order to remove vapor from the pump suction?()ACondenser circulating water pumpBFeed-water heater drain pumpCDistillate pumpDAir ejector condenser drain pump

单选题Air receivers installed in starting air systems are to be ().Acylindrical in shape with service connections located at the top and bottomBopened and made available for inspection during biannual inspections providedCwith automatic drain traps for the removal of moistureDso installed as to make the drain connections effective under extreme conditions of trim

单选题A propeller, in order to operate efficiently, must rotate at a relatively () speed.AhighBlowCfastDlowly

单选题You have finished physically installing an access point on the ceiling at your officE.At a minimum, which paramenter must be configured on the access point in order to allow a wireless client to operate on it?()AAESBPSKCSSIDDTKIPEWEP

单选题Frapping lines are fitted to lifeboat davits to().Areduce the swinging of the lifeboat as it is being lowered from the embarkation levelBsecure the lifeboat in the davits when in the stowed positionChold the lifeboat to the ship's side until the tricing lines are passedDbe used as a safety line in an emergency

单选题The piston cooling system may employ similar components, except that a drain tank is used instead of a head tank That means this system ().Adoesnt use a drain tank but a head tankBuses a drain tank not head tankCuses a drain tank and a head tankDuses neither a drain tank nor a head tank

单选题You find that the execution time of reports in your datawarehouse application is significantly high. You suspect the lack of indexes to be the reason for the degradation in performance. Which advisory component would you refer to, in order to determine the appropriate indexes?()A Memory AdvisorB Segment AdvisorC SQL Access AdvisorD Automatic Workload Repository (AWR)E Automatic Database Diagnostic Monitor (ADDM)

单选题After a normal, or safety shutdown, automatic combustion control systems for an auxiliary boiler are designed to prevent the immediate refiring of a burner in order for the ().Afurnace to be re-purgedBelectric charge to buildup in the igniterCfuel pump to restartDdram level to stabilize

单选题When received the order "finished with engine" which of the following operations is wrong?()Astop the LO pump, SW pump, FW pumpBstop the priming FO transfer pumpCengage the turning gearDopen the scavenge air belts drain valve and cover the turbocharger silencer with the dustproof cover

单选题If water is rising in the bilge of a lifeboat,you should FIRST().Aabandon the survival craftBcheck for cracks in the hullCshift all personnel to the sternDcheck the bilge drain plug

单选题After launching,an inflatable raft should be kept dry inside by().Aopening the automatic drain plugsBdraining the water pocketsCusing the electric bilge pumpDusing the bailers and cellulose sponge

单选题What is TRUE of pressure/vacuum valves? ()AThey are designed to provide for the flow of small volumes of tank atmospheres caused by thermal variations in a cargo tankBThey should operate in advance of the pressure/vacuum breakersCThey should be kept in good working order by regular inspection and cleaningDAll of the above