单选题An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()AConfigure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00BConfigure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00CConfigure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1DConfigure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
单选题
An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()
A
Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00
B
Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00
C
Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1
D
Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
参考解析
解析:
暂无解析
相关考题:
A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A、rg1 is configured with a delayed fallback timerB、Settling time policy has not been configured for rg1C、Node1 does not have sufficient resources to support rg1D、Node2 is the first in the ’Default Node Priority’ list for resource group rg1
During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?() A、 All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B、 All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C、 All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D、 All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
An administrator wants to install Web SMIT on a node that is not part of a cluster. Which PowerHA filesetprovides this function?()A、cluster.sysmgt.wsmB、cluster.es.client.wsmC、cluster.es.server.websmD、cluster.sysmgt.websm.rte
During the initial cluster design,a disk heartbeat,Point-to-Point non-IP network is being planned as part of a three-node cluster implementation. The disk environment will use LVM mirroring for disk redundancy. The volume groups will be created as Enhanced Concurrent Capable. To facilitate disk heartbeating,how many disks per node and how many networks will be required?() A、 One disk per node,one networkB、 Two disks per node,one networkC、 Two disks per node,six networksD、 Two disks per node,three networks
An administrator runs clstat on a cluster node and receives the following response: ’Can not get Cluster Information.’ Which of the following daemons may need to be started in order to correct this problem?()A、 topsvcsB、 clinfoESC、 snmpinfoD、 clsmuxpdES
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A、There is a DARE lock in placeB、A PowerHA migration is in progressC、Cluster services is not active on the other nodeD、The other cluster node is running a different version of RSCT
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?() A、 The resource group DNP has been configured.B、 The resource group option CWOF has been enabled.C、 The resource group option Inactive Takeover is set.D、 A resource group fallback timer has been configured.
A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’. Which of the following is the best way to execute this portion of the test plan?() A、 Execute "lssrc -g cluster stop" on Node ’A’B、 Execute "cat /etc//motd /dev/kmem" on Node ’A’C、 Execute "/usr/es/sbin/cluster/utilities/sclstop -gr" on Node ’A’D、 Find the pid of cluster manager daemon on Node ’A’ and issue a "kill-9" against the pid
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A、LDAP Authentication ModuleB、Smart Assist for Active DirectoryC、C-SPOC for user and password managementD、File Collections designating one node as the primary authentication node
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()A、cluster.es.hawB、cluster.es.worksheetsC、cluster.es.tools.worksheetsD、cluster.es.server.worksheets
An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()A、Create a custom event script to perform the change to CPU entitlementB、Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisitionC、Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisitionD、Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
An enterprise has two nodes: -Node ’A’ runs a large relational database and ha six CPUs and 32GB of memory. -Node ’B’ is an application server with three CPU’s and 16GB of memory. During peak production periods, the CPU load for Node ’A’ is normally between 30% and 40%. For Node ’B’, the CPU load is 10% to 20% during peak production periods. Which of the following describes the best solution for an HACMP cluster?() A、 Two cluster with two resource groups in a mutual takeover configuration.B、 One cluster with two cascading resource groups in a mutual takeover configuration.C、 One cluster with two rotating resource groups in a one-sided hot standby configuration.D、 Two clusters with two resource groups in a hot-standby configuration with a newly acquired third node.
During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial network for this cluster will require which connections?() A、 A single serial network between Node ’A’ and Node ’B’ and Node ’C’B、 A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’C、 A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’D、 A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’
An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()A、Unmanage resource groups on all nodes, update the cluster filesets, start cluster services on all nodes,ensure cluster services stabilizeB、Update the cluster filesets on all nodes. Run ’refresh -s clstrmgrES’ on one node, wait for the cluster tostabilize, repeat for all other nodesC、Unmanage resource groups on one node, update the cluster filesets, start cluster services. Wait for thecluster to stabilize and repeat for all other nodes.D、Bring resource groups (RGs) online on all nodes concurrently, bring RGs offline on one node, update thecluster filesets, bring RGs online, repeat for all other nodes
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?() A、 None,everything can be done with the cluster active.B、 Minimal downtime will be required to import the volume groups.C、 Several hours are required for testing before final synchronization.D、 Minimal downtime will be required to connect and test the serial network.
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?() A、 Change the cluster to a rotating design.B、 Change the Cascading without Fallback flag to true.C、 Change the Inactive Takeover field to false in the cluster configuration.D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()A The resource group DNP has been configured.B The resource group option CWOF has been enabled.C The resource group option Inactive Takeover is set.D A resource group fallback timer has been configured.
单选题An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()AConfigure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00BConfigure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00CConfigure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1DConfigure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
单选题A node in a three-node cluster was started, ad it acquired the following three cascading resourcegroups: ’rg1’, ’rg12’, and ’rg3’. The cluster design is to have ’rg1’ normally Node ’A’, ’rg2’ normally on Node ’B’, and rg3’ normally on Node ’C’. How can the administrator reposition the resource groups and correct the problem?()A Change the cluster resource group definitions from cascading to rotating,synchronize the cluster,and restart HACMPB Edit the /urs/es/sbin/utilities/clhosts file to reflect he desired node-to-resource group relationships and restart HACMPC Use the clRGMove utility move rg2 o Node ’B’ and rg3 to Node ’C’,then start the cluster manager on Nodes ’B’ and ’C’ with the clstart utilityD Disable Inactive Node Takeover,check the node priority list in the resource groups definitions,synchronize the cluster,and start HACMP on Nodes ’B’ and ’C’
单选题Node ’C’ has just completed reintegration in a three-node cluster. The hacmp.out logifle displays The event node_up_complete for Node ’C’. The cluster administrator wishes to verify that the cluster is stable. In addition to reviewing the cluster log files,what utility should be run to verify the cluster state?()A clstatB clinfoC cldiagD clverify
单选题During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?()A All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()APerform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.BPerform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.COn the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.DOn the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
单选题During the initial cluster design,a disk heartbeat,Point-to-Point non-IP network is being planned as part of a three-node cluster implementation. The disk environment will use LVM mirroring for disk redundancy. The volume groups will be created as Enhanced Concurrent Capable. To facilitate disk heartbeating,how many disks per node and how many networks will be required?()A One disk per node,one networkB Two disks per node,one networkC Two disks per node,six networksD Two disks per node,three networks
单选题Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()A Change the cluster to a rotating design.B Change the Cascading without Fallback flag to true.C Change the Inactive Takeover field to false in the cluster configuration.D Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()A None,everything can be done with the cluster active.B Minimal downtime will be required to import the volume groups.C Several hours are required for testing before final synchronization.D Minimal downtime will be required to connect and test the serial network.
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()Arg1 is configured with a delayed fallback timerBSettling time policy has not been configured for rg1CNode1 does not have sufficient resources to support rg1DNode2 is the first in the ’Default Node Priority’ list for resource group rg1
单选题During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre. What additional hardware or software is necessary to make this a valid configuration?()A SAN switchesB Fibre channel Hub(s)C IBM Storage Manager AgentsD IBM Subsystem Device Driver