An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
- A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
- B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
- C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
- D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
相关考题:
A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A、rg1 is configured with a delayed fallback timerB、Settling time policy has not been configured for rg1C、Node1 does not have sufficient resources to support rg1D、Node2 is the first in the ’Default Node Priority’ list for resource group rg1
A Cluster Administrator is implementing a custom resource group for a new web application. The goal is to ensure the resource group is always active. Preference should be given to the priority node at startup time,but fallback to the priority node should be scheduled during a nonbusy time. Using custom resource group options, what combination best achieve the desired resource group behavior?() A、 Online On All Available Nodes,using a setting timerB、 Online On Home Node Only,using a fallback timerC、 Online On Home Node Only,using both setting and fallback timersD、 Online On First Available Node,using both settling and fallback timers
An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:() A、 included in the resource group.B、 currently managing the resource group.C、 not part of an application resource group.D、 included in a cluster_admin resource group.
An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()A、RG1 is Online RG2 is OnlineB、RG1 is Online RG2 is OfflineC、RG1 is Offline RG2 is OnlineD、RG1 is Offline RG2 is Offline
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A、There is a DARE lock in placeB、A PowerHA migration is in progressC、Cluster services is not active on the other nodeD、The other cluster node is running a different version of RSCT
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?() A、 The resource group DNP has been configured.B、 The resource group option CWOF has been enabled.C、 The resource group option Inactive Takeover is set.D、 A resource group fallback timer has been configured.
An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()A、The operating system crashedB、A disk failure forced a volume group off lineC、The System Resource Controller executed a system haltD、The topology services daemon has crashed due to an ODM mismatch
An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()A、Perform a synchronization from a node without the changes.B、Apply the cluster snapshot on both nodes while the cluster is running.C、"Restore HACMP Configuration Database from Active Configuration" on the node where the changes weremadeD、Stop the cluster using the option "Unmanage Resource Groups" and apply the cluster snapshot on thenode where the changes were made
An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A、The administrator will need to perform an rg_move operationB、The administrator will need to un-manage and re-manage the resource groupC、The administrator will need to execute the new start script from the command lineD、The new start script will be executed as part of the DARE operation to synchronize the cluster
An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()A、Create a custom event script to perform the change to CPU entitlementB、Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisitionC、Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisitionD、Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()A、Configure the resource group with a fallback policy of "Fallback to Higher Priority Node" Restart Node1 at20:00B、Configure the resource group with a fallback policy of "Never Fallback" Manually move the resource groupfrom Node2 to Node1 at 20:00C、Configure the resource group with a fallback policy of "Fallback To Higher Priority Node" Create a"Delayed Fallback Timer" policy to meet the requirements Allocate this delayed timer policy to theresource group RG1D、Configure the resource group with a fallback policy of "Never Fallback" Create a "Delayed Fallback Timer"policy to meet the requirement Specify this delayed timer policy as a "Fallback Override" to the resourcegroup RG1
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A、Remove the MSDTC resource from Group1B、Select NODE3 as a preferred owner for Group1C、Remove NODE3 as a possible owner from all cluster resources in Group1D、Onfigure NODE3 as a possible owner for all cluster resources in Group1
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A、Remove the MSDTC resource from Group1.B、Select NODE3 as a preferred owner for Group1.C、Remove NODE3 as a possible owner from all cluster resources in Group1.D、Configure NODE3 as a possible owner for all cluster resources in Group1.
An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()A、AIX was shut downB、A fatal corruption occurred in the gsclvmd daemonC、The topsvcs daemon was stopped by the system resource controllerD、The grpsvcs process was stopped by the system resource controller
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?() A、 Change the cluster to a rotating design.B、 Change the Cascading without Fallback flag to true.C、 Change the Inactive Takeover field to false in the cluster configuration.D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()AAIX was shut downBA fatal corruption occurred in the gsclvmd daemonCThe topsvcs daemon was stopped by the system resource controllerDThe grpsvcs process was stopped by the system resource controller
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()Arg1 is configured with a delayed fallback timerBSettling time policy has not been configured for rg1CNode1 does not have sufficient resources to support rg1DNode2 is the first in the ’Default Node Priority’ list for resource group rg1
单选题An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()AConfigure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00BConfigure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00CConfigure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1DConfigure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
单选题An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()ARG1 is Online RG2 is OnlineBRG1 is Online RG2 is OfflineCRG1 is Offline RG2 is OnlineDRG1 is Offline RG2 is Offline
单选题An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()ACreate a custom event script to perform the change to CPU entitlementBModify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisitionCCustomize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisitionDCustomize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
单选题An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()AThe operating system crashedBA disk failure forced a volume group off lineCThe System Resource Controller executed a system haltDThe topology services daemon has crashed due to an ODM mismatch
单选题A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()A The resource group DNP has been configured.B The resource group option CWOF has been enabled.C The resource group option Inactive Takeover is set.D A resource group fallback timer has been configured.
单选题Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()A Change the cluster to a rotating design.B Change the Cascading without Fallback flag to true.C Change the Inactive Takeover field to false in the cluster configuration.D Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
单选题An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()AThe administrator will need to perform an rg_move operationBThe administrator will need to un-manage and re-manage the resource groupCThe administrator will need to execute the new start script from the command lineDThe new start script will be executed as part of the DARE operation to synchronize the cluster
单选题An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:()A included in the resource group.B currently managing the resource group.C not part of an application resource group.D included in a cluster_admin resource group.
单选题An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()AThere is a DARE lock in placeBA PowerHA migration is in progressCCluster services is not active on the other nodeDThe other cluster node is running a different version of RSCT
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()Arg1 is configured with a delayed fallback timerBSettling time policy has not been configured for rg1CNode1 does not have sufficient resources to support rg1DNode2 is the first in the ’Default Node Priority’ list for resource group rg1