A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’.  Which of the following is the best way to execute this portion of the test plan?()  A、 Execute "lssrc -g cluster stop" on Node ’A’B、 Execute "cat /etc//motd /dev/kmem" on Node ’A’C、 Execute "/usr/es/sbin/cluster/utilities/sclstop -gr" on Node ’A’D、 Find the pid of cluster manager daemon on Node ’A’ and issue a "kill-9" against the pid

A step in the HACMP test plan is to gracefully stop the cluster on a node and to verify that the Shared resources fallover to the standby node. To prepare for this testing step, both nodes in the two-node cluster are in a stable state with the single resource group active on Node ’A’.  Which of the following is the best way to execute this portion of the test plan?()  

  • A、 Execute "lssrc -g cluster stop" on Node ’A’
  • B、 Execute "cat /etc//motd >/dev/kmem" on Node ’A’
  • C、 Execute "/usr/es/sbin/cluster/utilities/sclstop -gr" on Node ’A’
  • D、 Find the pid of cluster manager daemon on Node ’A’ and issue a "kill-9" against the pid

相关考题:

下面可使程序单步执行的命令是A.SET STEP ONB.SET ESCAPE ONC.SET DEBUG OND.SET STEP OFF

The generator voltages are usually stepped up to the transmission voltage level by ( ). A.series capacitorB.parallel reactorsC.step-up transformersD.step-down transformers

The Buck(降压式变换器) is a ( ) converter. A.voltage step-upB.current step-downC.current step-upD.resistance

In describing a process , begin each step with a verb.( )

下面可使程序单步执行的命令是( )。A.SET STEP ONB.SE E SCAPE ONC.SET DEBUG OND.SET STEP OFF

若将STEP 3改为STEP -1时,则SS的输出结果为 ______。A.22B.0C.1D.-1

TCL-179(A)型野战跳频数字接力跳频起始频率、该频段最低频率的差值(F)、跳频步进(HOP-STEP)、跳频点数(HOP-NUM)的关系为()。A、F≥49.9-(HOP-NUM)×[(HOP-STEP)-1]B、F≤49.9-(HOP-NUM)×[(HOP-STEP)-1]C、F≥49.9-(HOP-STEP)×[(HOP-NUM)-1]D、F≤49.9-(HOP-STEP)×[(HOP-NUM)-1]

PM七步法,哪几步属于被动阶段?()A、STEP1-3B、STEP4-5C、STEP6-7D、STEP1-5

阶梯状断层(step fault)

7步法与其对应的内容不正确的是()。A、STEP0,预防性安全矩阵B、STEP3,风险预测C、STEP1-2,S-EWOD、STEP4,员工岗位点检表

GAAS80/580焊机的SWEP-06的状态范围包括()两项内容显示。A、[RDY]和[STEP]B、[EXT]和[STEP]C、[RDY]和[EXT]D、[STEP]和[STO]

智能步点 smart step 。

以下哪些参数会影响手机的接入时间?()A、INIT_PWR接入时初始功率偏置B、PWR_STEP接入时的功率提升步长C、NUM_STEP接入探测数D、PWR_CNTL_STEP反向功控步长

With everything arranged properly, the project is surely to () smoothly as planned, step by step.A、improveB、increaseC、progressD、occur

TPM的活动内容0-STEP是(),1-STEP是()。

计划保养STEP1之前的准备阶段称之为STEP0,在此步骤中要进行的三项工作为:()。

下列关于参数NUM_STEP的相关描述,正确的有()。A、此参数设置每个接入试探序列中允许的接入试探个数B、设置越大,一个接入探测序列成功接入的概率加大C、通常在PWR_STEP和NUM_STEP两个参数之间存在一个平衡考虑D、允许的接入试探个数为NUM_STEP+2

列关于接入试探数NUM_STEP描述正确的是()。A、此参数设置每个接入试探序列中允许的接入试探个数,允许的接入试探个数为16。B、本参数设置越大,一个接入探测序列成功接入的概率加大,但有可能相应的增加了反向链路的干扰,因为接入不成功也有可能是因为碰撞造成的。C、通常在PWR_STEP和NUM_STEP两个参数之间存在一个平衡考虑,当PWR_STEP设置得较小,则NUM_STEP应该相应的设置较大一些,反之,PWR_STEP设置较大,则NUM_STEP可以设得小一些。D、通常在PWR_STEP和NUM_STEP两个参数之间存在一个平衡考虑,当PWR_STEP设置得较小,则NUM_STEP也应该相应的设置较小一些,反之,PWR_STEP设置较大,则NUM_STEP可以设得大一些。

在Win95中不包括哪些启动模式()。A、NormalB、LoggedC、Step-by-step-confirmationD、Dos

下列关于接入信道功率调整步长参数PWR_STEP的相关描述,正确的有()。A、它定义了一个试探序列中连续接入探针之间的功率增量B、PWR_STEP设置高,可以增加基站接收到接入试探的可能性,但反向链路额外干扰概率会增加C、PWR_STEP设置低,可能加大接入碰撞概率D、为使手机在发射NUM_STEP个接入探针内实现成功接入,应正确设置INIT_PWR和PWR_STEP

When a valid SQL Query in a DB Read step returns 0 rows, which branch of the step will be executed? ()A、Timeout  B、SQL Error  C、Successful  D、Connection Not Available

An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()A、The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.B、The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.C、The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.D、The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.

运行中复归SPAJ140C的保护启动信号,如何操作()A、按“STEP"B、按”PROGRAM"C、同时按“STEP"和”PROGRAM"D、长按”PROGRAM"

单选题How do you debug an application with an Accept step?()ASelect Start from the Debug pulldown, then call the trigger. BSelect Step Over from the Debug pulldown, then call the trigger. CCall the trigger, and when the workflow answers, select Start from the Debug pulldown. DSelect Reactive Application, then call the trigger and press F10 to step through the workflow

填空题TPM的活动内容0-STEP是(),1-STEP是()。

单选题An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()AThe 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.BThe 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.CThe 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.DThe 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.

单选题If the Call Redirect step sends a caller to a device that does not exist in the CallManager, which branch of the step is executed? ()ABusy  BInvalid  CSuccessful  DUnsuccessfu

填空题计划保养STEP1之前的准备阶段称之为STEP0,在此步骤中要进行的三项工作为:()。