单选题During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre.  What additional hardware or software is necessary to make this a valid configuration?()A SAN switchesB Fibre channel Hub(s)C IBM Storage Manager AgentsD IBM Subsystem Device Driver

单选题
During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre.  What additional hardware or software is necessary to make this a valid configuration?()
A

 SAN switches

B

 Fibre channel Hub(s)

C

 IBM Storage Manager Agents

D

 IBM Subsystem Device Driver


参考解析

解析: 暂无解析

相关考题:

Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.

123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.

View the Exhibit and examine the resource consumption details for the current plan in use by the database instance.Which two statements are true based on the output?() A. An attempt to start a new session by the user belonging to DSS_QUERIES fails with an errorB. A user belonging to DSS_QUERIES can log in to a new session but the session will be queuedC. The CPU_WAIT_TIME column indicates the total time that sessions in the consumer group waited for the CPU due to resource management .D. The CPU_WAIT_TIME column indicates the total time that sessions in the consumer group waited for the CPU due to resource management, I/O waits, and latch or enqueue contention

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?() A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service

The most crucial time for project risk assessment is ( ).A.when a problem surfacesB.during the planning phaseC.during the close-out phaseD.after the project schedule has been published

The most crucial time for project risk assessment is ( ).A、when a problem surfacesB、during the planning phaseC、during the close-out phaseD、after the project schedule has been published

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction

During a planning meeting, Company.com indicates that they intend to make a relational  Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab.  How would this be managed in an HACMP environment?()  A、 It can be started with a crontab entry.B、 It can be created as an Application Server.C、 It can be added to a resource group as a dependency.D、 It cannot be done because HACMP provides no method to order application start/stop scripts.

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

By default, which condition would cause a session to be removed from the session table?()A、Route entry for the session changed.B、Security policy for the session changed.C、The ARP table entry for the source IP address timed out.D、No traffic matched the session during the timeout period.

A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be considered()A、the number of SAN ports required by the solutionB、thin provisioning is mandatoryC、the solution needs to support RAID 0D、the solution needs to be supported by the VMware Site Recovery Manager

During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A、 4B、 5C、 6D、 8

The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()A、customer must reconfigure aniSCSI port for mirroringB、customer must set up a fabric and dedicate port 4 for disaster recoveryC、customer must set up a fabric and dedicate port 2 for disaster recoveryD、replication is not possible with the DS5020, they must consider the DS5300

A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()A、LPAR capacity planningB、logical volume configurationC、data migration processD、audit hosts for HBA worldwide port names

During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups.  A serial network for this cluster will require which connections?()  A、 A single serial network between Node ’A’ and Node ’B’ and Node ’C’B、 A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’C、 A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’D、 A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’

During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()  A、 GeoRMB、 HACMP/XD://PPRCC、 HACMP/XD://GPFSD、 HACMP/XD://HAGEO

During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()  A、 None,everything can be done with the cluster active.B、 Minimal downtime will be required to import the volume groups.C、 Several hours are required for testing before final synchronization.D、 Minimal downtime will be required to connect and test the serial network.

During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()  A、 IPAT via IP aliasingB、 IPAT via IP replacementC、 IPAT via IP aliasing using HWATD、 IPAT via IP replacement using HWAT

单选题During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()A GeoRMB HACMP/XD://PPRCC HACMP/XD://GPFSD HACMP/XD://HAGEO

单选题During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A 4B 5C 6D 8

单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()Acapacity above 500 TBBfirst in customer locationCa new model has been releasedDsold without implementation service

单选题以下程序的打印结果是什么() tx=session.beginTransaction(); Customer c1=(Customer)session.load(Customer.class,new Long(1)); Customer c2=(Customer)session.load(Customer.class,new Long(1)); System.out.println(c1==c2); tx.commit(); session.close();A运行出错,抛出异常B打印falseC打印trueD编译出错

单选题By default, which condition would cause a session to be removed from the session table?()ARoute entry for the session changed.BSecurity policy for the session changed.CThe ARP table entry for the source IP address timed out.DNo traffic matched the session during the timeout period.

单选题A few of()are planning to drive to Beijing during the spring break.Awe girlsBus girlsCgirls weDgirls

单选题During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()A None,everything can be done with the cluster active.B Minimal downtime will be required to import the volume groups.C Several hours are required for testing before final synchronization.D Minimal downtime will be required to connect and test the serial network.

单选题During a planning meeting, Company.com indicates that they intend to make a relational  Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab.  How would this be managed in an HACMP environment?()A It can be started with a crontab entry.B It can be created as an Application Server.C It can be added to a resource group as a dependency.D It cannot be done because HACMP provides no method to order application start/stop scripts.