单选题Heavy cargo might break ()cargo, so it can’t be stowed on top of it.AlightBbulkCdangerousDwet

单选题
Heavy cargo might break ()cargo, so it can’t be stowed on top of it.
A

light

B

bulk

C

dangerous

D

wet


参考解析

解析: 暂无解析

相关考题:

Never______stowed like this.A.optional cargo should beB.should optional cargo beC.should be optional cargoD.optional cargo must be

The Emergency Position Indicating Radiobeacon on a cargo vessel must be stowed ______.A.in an inside passagewayB.in an approved bracketC.so that it is accessible from the bridge of the vesselD.so that it will float free if the vessel sinks

A Master should file a marine note of protest if ______.A.cargo was received at ship side which was damaged in land transitB.longshore labor went on strike in the port causing undue vessel delayC.portions of his vessel's cargo were illegally impounded in a foreign portD.the vessel encountered heavy weather which might have caused cargo damage

Overcarriage is best prevented by ______.A.assuring heavy cargo is stowed low in the vesselB.checking the vessel's load line calculations carefullyC.inspection of the hold at completion of dischargeD.stowing the cargo which is to be discharged last on the bottom

By the stowage factor,when given a certain volume of space,we know ______.A.The space of the shipB.The space of one holdC.What kind of cargo can be stowedD.How much cargo can be stowed

干货通常被装载到货舱里。()A、Dry cargo is usually stowed in the hold.B、Dry cargo is usually stowed at the hatch.C、Wet cargo is usually stowed in the hold.

Heavy cargo might break ()cargo, so it can’t be stowed on top of it.A、lightB、bulkC、dangerousD、wet

重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

The ()(重吊杆) can lift heavy cargo.A、heavy cargo derrickB、heavy deckC、jumbo boomD、heavy block

湿货要远离干货。()A、Wet cargo must be kept away from dry cargo.B、Heavy cargo must be kept away from dry cargo.C、Light cargo must be kept away from dry cargo.D、Wet cargo must be kept away from light cargo.

Is this()longer or shorter?A、cargo wireB、wire cargoC、wire of cargoD、heavy cargo

()(湿货)must be kept away from dry cargo.A、Light cargoB、Wet cargoC、Heavy cargoD、Deck cargo

()(重)cargo might break fragile cargo.A、ContainerB、DangerousC、HeavyD、Light

货钩()A、cargo chainB、cargo trayC、cargo hookD、can hook

()must be kept away from dry cargo.A、Light cargoB、Wet cargoC、Heavy cargoD、Bulk cargo

单选题The ()(干货船 )can’t carry wet cargo.Aliquid cargo shipBdrummed cargoCdry cargo shipDbarge

单选题The ()(重吊杆) can lift heavy cargo.Aheavy cargo derrickBheavy deckCjumbo boomDheavy block

单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().APut all the remaining cargo on starboard sideBPut light cargo on starboardside and heavy cargo on port sideCPut light cargo on port side and heavy cargo on starboard sideDA,B,C are all correct

单选题A cargo of refrigerated fruit is packed in crates with transverse members dividing the crate in two equal parts. Which statement is TRUE?()AThe cargo block should be tightly packed if the cargo is suitably chilled upon delivery to the vesselBBoth sides of each crate must be checked for the temperature and the appearance of the fruitCThe cargo block should be stowed with air channels built throughout the stowed cargoDThe crates should NEVER be stowed brick fashion

单选题重吊杆用于吊大的重件。()AHeavy derrick is used for lifting large heavy cargo.BDerrick is used for lifting large heavy cargo.CHeavy derrick is used for lifting dry bulk cargo.DDerrick is used for lifting dry bulk cargo.

单选题By the stowage factor, when given a certain volume of space, we know().Athe space of the shipBthe space of one holdCwhat kind of cargo can be stowedDhow much cargo can be stowed

单选题Never()stowed like this.Aoptional cargo should beBshould optional cargo beCshould be optional cargoDshould optional cargo

单选题干货通常被装载到货舱里。()ADry cargo is usually stowed in the hold.BDry cargo is usually stowed at the hatch.CWet cargo is usually stowed in the hold.

单选题The jumbo boom can ().Alift heavy cargoBload and unloadCjoin ropes togetherDlift light cargo

单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()AThe discharge is slow due to the size of the cargo and all the cranes working togetherBThe cargo discharge can be accomplished with controlled pendulationCThe cargo discharge can be performed in port or at anchorDThe cranes enable the handling of heavy cargos without shoreside assistance

单选题0vercarring is best prevented by().Aassuring heavy cargo is stowed low in the vesselBchecking the vessel's load line calculations carefullyCinspection of the hold at completion of dischargeDstowing the cargo which is to be discharge last on the bottom

单选题Overcarriage is best prevented by().Aassuring heavy cargo is stowed low in the vesselBchecking the vessel's load line calculations carefullyCinspection of the hold at completion of dischargeDstowing the cargo which is to be discharged last on the bottom

单选题Strong smelling cargo should be stowed()the cargo absorbing foreign smell.Atogether withBon top ofCunderneathDaway from