单选题Sailors should know the ()(安全工作负荷量)of derricks.Asafe working loadBsafety work loadCsafe work loadDsafe working loading
单选题
Sailors should know the ()(安全工作负荷量)of derricks.
A
safe working load
B
safety work load
C
safe work load
D
safe working loading
参考解析
解析:
暂无解析
相关考题:
______ in a charter-party are working days on which the weather allows loading work or discharging work to be done.A.Whether working daysB.Weather working daysC.Running daysD.Calendar days
In terms of vessel manning,a watch is the ______.A.direct performance of deck or engine operations in a scheduled and fixed rotationB.performance of maintenance work necessary for the vessel's safe operation,on a daily basisC.performance of lookout dutiesD.direct performance of cargo loading and discharge operations only
What is the best instrument for establishing a safe working area before welding in a confined space?A.An oxygen indicatorB.A combustible gas indicatorC.A combination combustible gas and oxygen indicatorD.A flame safety lamp
______ is not among the Safety management objectives of the Company.A.to provide for safe practices in ship operation and a safe working environmentB.to establish safeguards against all identified risksC.to continuously improve safety management skills of personnel ashore and aboard ships,including preparing for emergencies related both to safety and environmental protectionD.to avoid damage to the environment,in particular,to the marine environment,and to property
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨
英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t
What are two uRPF working modes?()A、express modeB、safe modeC、loose modeD、strict modeE、tight mode
Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading
单选题What is the best instrument for establishing a safe working area before welding in a confined space? ()AAn oxygen indicatorBA combustible gas indicatorCA combination combustible gas and oxygen indicatorDA flame safety lamp
单选题In determining a safe speed()shall not be among those taken into account.Athe characteristics,efficiency and limitation of the radar equipmentBany constraints imposed by the radar range scale in useCthe effect on radar detection of the sea state,weather and other sources of interferenceDthe safe working load of the cranes both on board and ashore
单选题Before welding is permitted on a fuel tank, it must be certified or declared ()Asafe for becoming roundedBsafe for hot workCnot safe for personnelDnot safe for hot work
单选题In terms of vessel manning,a watch is the().Adirect performance of deck or engine operations in a scheduled and fixed rotationBperformance of maintenance work necessary for the vessel's safe operation,on a daily basisCperformance of lookout dutiesDdirect performance of cargo loading and discharge operations only
单选题()is not among the Safety management objectives of the Company.Ato provide for safe practices in ship operation and a safe working environmentBto establish safeguards against all identified risksCto continuously improve safety management skills of personnel ashore and aboard ships,including preparing for emergencies related both to safety and environmental protectionDto avoid damage to the environment,in particular,to the marine environment,and to property
单选题The safety management objectives of the ISM Code are ().Ato provide for safe practices in ship operation and a safe working environmentBto establish safeguards against all identified risksCto continuously improve safety management skills of personnel, including preparing for emergenciesDall the above
单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().AdeckBhead of the boomCheel of the boomDmast or king post
单选题The safe working load of the derrick is 5 tons.()A吊杆的安全工作负荷量是5吨B龙门吊的安全工作负荷量是5吨C起货机的安全工作负荷量是5吨D重吊杆的安全工作负荷量是5吨
单选题()in a charter-party are working days on which the weather allows loading work or discharging work to be done.AWhether working daysBWeather working daysCRunning daysDCalendar days
单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().AyearBtwo yearsCfour yearsDfive years